 Issue dateTitleTopic
IR 05000201/200300426 March 1985Insp Rept 50-293/85-03 on 850201-0304.Violations Noted: Failure to Take Prompt Corrective Actions for QA Surveillance Findings,Use of out-of-calibr Test Equipment & Failure to Control DocumentsHalf scram
Fire Barrier
Hydrostatic
Coatings
Temporary Modification
Missed surveillance
IR 05000283/19880297 September 1988Insp Rept 50-283/88-29 on 880818-20.No Violations or Deviations Noted.Major Areas Inspected:Use of NRC Mobile Radioanalytical Lab to Perform Independent Measurements of Soil to Determine Existence & Level of Contamination
IR 05000293/195700126 May 2023635390- Amendment 8 Providence Imaging Center 50-29357-01/030-38077
IR 05000293/197500221 February 1975Insp Rept 50-293/75-02 on 750116-17.Noncompliance Noted: Failure to Maintain Plant Release Rate of Iodines & Particulates w/half-lives Greater than 8 Days Below Level Set in Tech Spec 3.8.B.2
IR 05000293/197703112 May 1978Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in IE Insp Rept 50-293/77-31 on 771128-30High Radiation Area
Overexposure
IR 05000293/197802226 September 1978IE Inspec Rept 50-293/78-22 on 780905-08 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Included:Plant Opers,Ie Circular 78-08,IE Bulletin 78-03 & LER ReviewLoop seal
Scram Discharge Volume
IR 05000293/197802328 September 1978Mgt Meeting Rept 50-293/78-23.Major Areas Discussed:Insp Findings Re Insp Program
IR 05000293/19780247 November 1978IE Inspec Rept 50-293/78-24 on 781003-06 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Physical Protec Inspec,Implementation of Accepted Security Plan & Sections of 10CFR73.55
IR 05000293/19810154 August 1982Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Emergency Preparedness Appraisal Rept 50-293/81-15
IR 05000293/198101828 August 1985Ack Receipt of ,Per 850730 Telcon Re Description of Activities & Schedule to Complete long-term Corrective Actions for Noncompliance Noted in Insp Repts 50-293/81-18 & 50-293/81-22
IR 05000293/198103710 March 1982Advises That Encl Investigation Rept 50-293/81-37 Re Matl False Statement Incident Scheduled for Issuance on 820318. Incident Does Not Appear to Involve Deliberateness on Part of Util Nor Employees.Supporting Documentation Encl
IR 05000293/19820013 January 2020David Paul Dba C.Q.C. Company; Termination; License 50-29382-01; Docket 030-38241; Control 616184
IR 05000293/198200630 July 1982Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-293/82-06
IR 05000293/198201015 June 1982Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-293/82-10
IR 05000293/19820119 June 1982Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-293/82-11
IR 05000293/198201229 June 1982IE Insp Rept 50-293/82-12 on 820405-0509.Noncompliance Noted:Failure to Insert All Control Rods within 4-h of Having Less than Two Operable Reactor Vessel Low Water Level Instrument Channels in Both Trip SysReactor Vessel Water Level
IR 05000293/19820149 July 1982IE Insp Rept 50-293/82-14 on 820517-21.No Noncompliance Noted.Major Areas Inspected:Radiation Protection Program, Including Transportation & Radwaste MgtHigh Radiation Area
IR 05000293/19820153 June 1982IE Safeguards Insp Rept 50-293/82-15 on 820511-12.No Noncompliance Noted.Major Areas Inspected:Organization, Operations,Storage & Internal Controls,Records & Repts. Details Withheld (Ref 10CFR2.790)
IR 05000293/198201627 July 1989Forwards Excerpts from Insp Repts 50-293/82-16 & 50-293/89-05 to Clarify Why 1982 Traversing in-core Probe (TIP) Event Resulted in Declared Emergency & Why 1989 TIP Event Did Not.W/O Encls
IR 05000293/198201821 June 1982IE Insp Rept 50-293/82-18 on 820608-11.No Noncompliance Noted.Major Areas Inspected:Cycle VI post-refueling Startup Testing & Traversing in-core Probe Maint TestsShutdown Margin
IR 05000293/198202115 July 1982Forwards Incomplete IE Mgt Meeting Rept 50-293/82-21 on 820707 Re Violation of Limiting Condition for Plant Operation
IR 05000293/198402529 November 1984Forwards Order Modifying License & Notices of Violation & Deviation from Insp Repts 50-293/84-25 & 50-293/84-29 on 840806-10 & 840824
IR 05000293/198403419 June 1985Revised SALP Rept 50-293/84-34 for Jul-Sept 1984Safe Shutdown
Non-Destructive Examination
Nondestructive Examination
Missed surveillance
Scram Discharge Volume
Systematic Assessment of Licensee Performance
Exemption Request
Control of Heavy Loads
Fire Watch
IR 05000293/198404129 April 1985Insp Rept 50-293/84-41 on 841210-13.Violation Noted:Failure to Distribute Public Info as Specified in Emergency Plan & Failure to Update Emergency Plan & Procedure in Order to Comply W/Requirements of 10CFR50,App E,Section G
IR 05000293/198404426 June 1985Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-293/84-44 & 50-293/85-02.Personnel Disregard of Procedural Requirements Indicates Lack of Mgt Oversight of Radiation ControlsHigh Radiation Area
Incorporated by reference
IR 05000293/198500111 July 1985Ack Receipt of Informing NRC of Steps Taken to Correct Violation B Noted in Insp Rept 50-293/85-01. Violation a Re Number of Licensed Operators in Control Room Remains as Stated
IR 05000293/198500715 May 1985Insp Rept 50-293/85-07 on 850318-22.No Violations or Deviations Noted.Major Areas Inspected:Licensee Action on Previous Findings,Bulletins & Circulars & High Reading TLDs Identified in Dec 1984 & Jan 1985High Radiation Area
IR 05000293/198500828 May 1985Safety Insp Rept 50-293/85-08 on 850402-0506.No Violation Noted.Major Areas Inspected:Plant Operations,Including Previous Insp Findings,Operational Safety Verification & Surveillance & Maint ActivitiesHalf scram
Temporary Modification
Missed surveillance
IR 05000293/19850092 July 1985Insp Rept 50-293/85-09 on 850422-26.No Violation or Deviation Noted.Major Areas Inspected:Info Exchange Between Vendors of safety-related Equipment & LicenseeLoctite
IR 05000293/198501128 June 1985Safety Insp Rept 50-293/85-11 on 850507-0608.No Violations Noted.Major Areas Inspected:Plant Operations,Including ESF Walkdown,Operational Safety Verification & Surveillance & Maint ActivitiesReactor Vessel Water Level
Stroke time
Temporary Modification
Biofouling
Liquid penetrant
IR 05000293/19850127 June 1985Insp Rept 50-293/85-12 on 850521-24.No Violation Noted. Major Areas Inspected:Plant Mods & Operations & Followup on Previous FindingsLiquid penetrant
IR 05000293/198501317 September 1985Ack Receipt of Informing NRC of Steps Taken to Correct Violations & Deviations Noted in Insp Rept 50-293/85-13.Rept Clarified Util Use of Procedural Steps as Health Physics
IR 05000293/198501430 July 1985Insp Rept 50-293/85-14 on 850528-31.No Violation or Deviation Noted.Major Areas Inspected:Previous Insp FindingsScram Discharge Volume
IR 05000293/198501514 August 1986Forwards Combined Exam & Training Program Insp Rept 50-293/85-15OL,conducted During Wk of 860505
IR 05000293/19850171 August 1985Safety Insp Rept 50-293/85-17 on 850613-0715.Violation & Deviation Noted:Failure to Establish & Implement Surveillance Procedures & Failure to Follow Procedure for Radiation Work PermitsHigh Radiation Area
Stroke time
Temporary Modification
Emergency Lighting
IR 05000293/198501825 July 1985Insp Rept 50-293/85-18 on 850624-28.No Violation Noted. Major Areas Inspected:Hpci Water Hammer Events,Qc Snubber Insp Findings Due to Events & Results of Tech Spec Visual Surveillance of Snubbers
IR 05000293/198501911 October 1985Insp Rept 50-293/85-19 on 850904-06.No Violation Noted.Major Areas inspected:850905 Annual Full Participation Exercise. Concerns Identified Re Evaluation of Radiation Exposure to Reentry TeamsOverexposure
IR 05000293/198502012 September 1985Insp Rept 50-293/85-20 on 850716-0819.Violation Noted: Failure to Maintain Trip Level Settings for Two Main Steam Line High Radiation Monitors Consistent W/Tech Spec Limits
IR 05000293/19850215 August 1985Insp Rept 50-293/85-21 on 850716-30.Violation Noted:Failure to Initiate Failure & Malfunction Repts on 850715 & 23, Resulting in Secondary Containment Integrity Not Being Maintained 850715-16Grab sample
IR 05000293/19850222 October 1985Insp Rept 50-293/85-22 on 850819-23.No Violation Noted.Major Areas Inspected:Implementation of Radiological Improvement Program Commitments,Previously Identified Items & Review of Unmonitored ReleasesHigh Radiation Area
Overexposure
IR 05000293/198502324 September 1985Insp Rept 50-293/85-23 on 850812-16.No Violation Noted.Major Areas Inspected:Analytical Procedures Evaluation Using Stds, Split Samples for Chemical Analyses & Analytical Measurements QC Program
IR 05000293/198502415 August 1985Physical Security Insp Rept 50-293/85-24 on 850806-08. Violation Noted:Failure to Maintain Adequate Vital Area Barrier.Portions Deleted (Ref 10CFR2.790)
IR 05000293/198502512 September 1985Enforcement Conference Rept 50-293/85-25 on 850827 Re Findings of Special Insps 50-293/85-21 & 50-293/85-24, Including Concerns of Timely Corrective Action for Abnormal Surveillance Test Findings & Degraded Vital Area Barrier
IR 05000293/198502610 October 1985Insp Rept 50-293/85-26 on 850820-0923.Violation Noted: Failure to Take Corrective Action to Ensure That Reactor Operator Overtime Properly AuthorizedHigh Radiation Area
Post Accident Monitoring
Locked High Radiation Area
Systematic Assessment of Licensee Performance
IR 05000293/198502718 April 1986Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-293/85-27
IR 05000293/19850282 December 1985Safety Insp Rept 50-293/85-28 on 850924-1104.No Violations Noted.Major Areas Inspected:Followup of Previous Insp Findings,Operational Safety Verification & ESF Walkdown, Followup of Events & Nonroutine Repts & Security Activities
IR 05000293/198502917 October 1985Insp Rept 50-293/85-29 on 850928-1002.No Violation Noted. Major Areas Inspected:Licensee Activities Re Movement of Spent Fuel within Spent Fuel Pool & Condition of Refueling Equipment
IR 05000293/198503021 January 1986Insp Rept 50-293/85-30 on 851023-1122.No Noncompliance Noted.Major Areas Inspected:Operational Readiness of HPCI Sys.Partial Review Conducted in Areas of Core Spray & Standby Gas Treatment SysSafe Shutdown
Reactor Vessel Water Level
Emergency Lighting
IR 05000293/19850313 January 1986Safety Insp Rept 50-293/85-31 on 851105-1206.No Violations Noted.Errors Found in Operating Procedure & Valve Checklist for Loop B of LPCI Mode of RHR Sys.Instrumentation Problem Re Drift in Steam Flow Switches AddressedHalf scram
Fire Barrier
Scram Discharge Volume
IR 05000293/198503228 February 1986Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-293/85-32.Existing Tech Specs Should Be Reviewed to Ensure That Appropriate Procedures Established to Implement Specs