IR 05000201/2003004 | 26 March 1985 | Insp Rept 50-293/85-03 on 850201-0304.Violations Noted: Failure to Take Prompt Corrective Actions for QA Surveillance Findings,Use of out-of-calibr Test Equipment & Failure to Control Documents | Half scram Fire Barrier Hydrostatic Coatings Temporary Modification Missed surveillance |
IR 05000283/1988029 | 7 September 1988 | Insp Rept 50-283/88-29 on 880818-20.No Violations or Deviations Noted.Major Areas Inspected:Use of NRC Mobile Radioanalytical Lab to Perform Independent Measurements of Soil to Determine Existence & Level of Contamination | |
IR 05000293/1957001 | 26 May 2023 | 635390- Amendment 8 Providence Imaging Center 50-29357-01/030-38077 | |
IR 05000293/1975002 | 21 February 1975 | Insp Rept 50-293/75-02 on 750116-17.Noncompliance Noted: Failure to Maintain Plant Release Rate of Iodines & Particulates w/half-lives Greater than 8 Days Below Level Set in Tech Spec 3.8.B.2 | |
IR 05000293/1977031 | 12 May 1978 | Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in IE Insp Rept 50-293/77-31 on 771128-30 | High Radiation Area Overexposure |
IR 05000293/1978022 | 26 September 1978 | IE Inspec Rept 50-293/78-22 on 780905-08 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Included:Plant Opers,Ie Circular 78-08,IE Bulletin 78-03 & LER Review | Loop seal Scram Discharge Volume |
IR 05000293/1978023 | 28 September 1978 | Mgt Meeting Rept 50-293/78-23.Major Areas Discussed:Insp Findings Re Insp Program | |
IR 05000293/1978024 | 7 November 1978 | IE Inspec Rept 50-293/78-24 on 781003-06 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Physical Protec Inspec,Implementation of Accepted Security Plan & Sections of 10CFR73.55 | |
IR 05000293/1981015 | 4 August 1982 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Emergency Preparedness Appraisal Rept 50-293/81-15 | |
IR 05000293/1981018 | 28 August 1985 | Ack Receipt of ,Per 850730 Telcon Re Description of Activities & Schedule to Complete long-term Corrective Actions for Noncompliance Noted in Insp Repts 50-293/81-18 & 50-293/81-22 | |
IR 05000293/1981037 | 10 March 1982 | Advises That Encl Investigation Rept 50-293/81-37 Re Matl False Statement Incident Scheduled for Issuance on 820318. Incident Does Not Appear to Involve Deliberateness on Part of Util Nor Employees.Supporting Documentation Encl | |
IR 05000293/1982001 | 3 January 2020 | David Paul Dba C.Q.C. Company; Termination; License 50-29382-01; Docket 030-38241; Control 616184 | |
IR 05000293/1982006 | 30 July 1982 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-293/82-06 | |
IR 05000293/1982010 | 15 June 1982 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-293/82-10 | |
IR 05000293/1982011 | 9 June 1982 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-293/82-11 | |
IR 05000293/1982012 | 29 June 1982 | IE Insp Rept 50-293/82-12 on 820405-0509.Noncompliance Noted:Failure to Insert All Control Rods within 4-h of Having Less than Two Operable Reactor Vessel Low Water Level Instrument Channels in Both Trip Sys | Reactor Vessel Water Level |
IR 05000293/1982014 | 9 July 1982 | IE Insp Rept 50-293/82-14 on 820517-21.No Noncompliance Noted.Major Areas Inspected:Radiation Protection Program, Including Transportation & Radwaste Mgt | High Radiation Area |
IR 05000293/1982015 | 3 June 1982 | IE Safeguards Insp Rept 50-293/82-15 on 820511-12.No Noncompliance Noted.Major Areas Inspected:Organization, Operations,Storage & Internal Controls,Records & Repts. Details Withheld (Ref 10CFR2.790) | |
IR 05000293/1982016 | 27 July 1989 | Forwards Excerpts from Insp Repts 50-293/82-16 & 50-293/89-05 to Clarify Why 1982 Traversing in-core Probe (TIP) Event Resulted in Declared Emergency & Why 1989 TIP Event Did Not.W/O Encls | |
IR 05000293/1982018 | 21 June 1982 | IE Insp Rept 50-293/82-18 on 820608-11.No Noncompliance Noted.Major Areas Inspected:Cycle VI post-refueling Startup Testing & Traversing in-core Probe Maint Tests | Shutdown Margin |
IR 05000293/1982021 | 15 July 1982 | Forwards Incomplete IE Mgt Meeting Rept 50-293/82-21 on 820707 Re Violation of Limiting Condition for Plant Operation | |
IR 05000293/1984025 | 29 November 1984 | Forwards Order Modifying License & Notices of Violation & Deviation from Insp Repts 50-293/84-25 & 50-293/84-29 on 840806-10 & 840824 | |
IR 05000293/1984034 | 19 June 1985 | Revised SALP Rept 50-293/84-34 for Jul-Sept 1984 | Safe Shutdown Non-Destructive Examination Nondestructive Examination Missed surveillance Scram Discharge Volume Systematic Assessment of Licensee Performance Exemption Request Control of Heavy Loads Fire Watch |
IR 05000293/1984041 | 29 April 1985 | Insp Rept 50-293/84-41 on 841210-13.Violation Noted:Failure to Distribute Public Info as Specified in Emergency Plan & Failure to Update Emergency Plan & Procedure in Order to Comply W/Requirements of 10CFR50,App E,Section G | |
IR 05000293/1984044 | 26 June 1985 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-293/84-44 & 50-293/85-02.Personnel Disregard of Procedural Requirements Indicates Lack of Mgt Oversight of Radiation Controls | High Radiation Area Incorporated by reference |
IR 05000293/1985001 | 11 July 1985 | Ack Receipt of Informing NRC of Steps Taken to Correct Violation B Noted in Insp Rept 50-293/85-01. Violation a Re Number of Licensed Operators in Control Room Remains as Stated | |
IR 05000293/1985007 | 15 May 1985 | Insp Rept 50-293/85-07 on 850318-22.No Violations or Deviations Noted.Major Areas Inspected:Licensee Action on Previous Findings,Bulletins & Circulars & High Reading TLDs Identified in Dec 1984 & Jan 1985 | High Radiation Area |
IR 05000293/1985008 | 28 May 1985 | Safety Insp Rept 50-293/85-08 on 850402-0506.No Violation Noted.Major Areas Inspected:Plant Operations,Including Previous Insp Findings,Operational Safety Verification & Surveillance & Maint Activities | Half scram Temporary Modification Missed surveillance |
IR 05000293/1985009 | 2 July 1985 | Insp Rept 50-293/85-09 on 850422-26.No Violation or Deviation Noted.Major Areas Inspected:Info Exchange Between Vendors of safety-related Equipment & Licensee | Loctite |
IR 05000293/1985011 | 28 June 1985 | Safety Insp Rept 50-293/85-11 on 850507-0608.No Violations Noted.Major Areas Inspected:Plant Operations,Including ESF Walkdown,Operational Safety Verification & Surveillance & Maint Activities | Reactor Vessel Water Level Stroke time Temporary Modification Biofouling Liquid penetrant |
IR 05000293/1985012 | 7 June 1985 | Insp Rept 50-293/85-12 on 850521-24.No Violation Noted. Major Areas Inspected:Plant Mods & Operations & Followup on Previous Findings | Liquid penetrant |
IR 05000293/1985013 | 17 September 1985 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations & Deviations Noted in Insp Rept 50-293/85-13.Rept Clarified Util Use of Procedural Steps as Health Physics | |
IR 05000293/1985014 | 30 July 1985 | Insp Rept 50-293/85-14 on 850528-31.No Violation or Deviation Noted.Major Areas Inspected:Previous Insp Findings | Scram Discharge Volume |
IR 05000293/1985015 | 14 August 1986 | Forwards Combined Exam & Training Program Insp Rept 50-293/85-15OL,conducted During Wk of 860505 | |
IR 05000293/1985017 | 1 August 1985 | Safety Insp Rept 50-293/85-17 on 850613-0715.Violation & Deviation Noted:Failure to Establish & Implement Surveillance Procedures & Failure to Follow Procedure for Radiation Work Permits | High Radiation Area Stroke time Temporary Modification Emergency Lighting |
IR 05000293/1985018 | 25 July 1985 | Insp Rept 50-293/85-18 on 850624-28.No Violation Noted. Major Areas Inspected:Hpci Water Hammer Events,Qc Snubber Insp Findings Due to Events & Results of Tech Spec Visual Surveillance of Snubbers | |
IR 05000293/1985019 | 11 October 1985 | Insp Rept 50-293/85-19 on 850904-06.No Violation Noted.Major Areas inspected:850905 Annual Full Participation Exercise. Concerns Identified Re Evaluation of Radiation Exposure to Reentry Teams | Overexposure |
IR 05000293/1985020 | 12 September 1985 | Insp Rept 50-293/85-20 on 850716-0819.Violation Noted: Failure to Maintain Trip Level Settings for Two Main Steam Line High Radiation Monitors Consistent W/Tech Spec Limits | |
IR 05000293/1985021 | 5 August 1985 | Insp Rept 50-293/85-21 on 850716-30.Violation Noted:Failure to Initiate Failure & Malfunction Repts on 850715 & 23, Resulting in Secondary Containment Integrity Not Being Maintained 850715-16 | Grab sample |
IR 05000293/1985022 | 2 October 1985 | Insp Rept 50-293/85-22 on 850819-23.No Violation Noted.Major Areas Inspected:Implementation of Radiological Improvement Program Commitments,Previously Identified Items & Review of Unmonitored Releases | High Radiation Area Overexposure |
IR 05000293/1985023 | 24 September 1985 | Insp Rept 50-293/85-23 on 850812-16.No Violation Noted.Major Areas Inspected:Analytical Procedures Evaluation Using Stds, Split Samples for Chemical Analyses & Analytical Measurements QC Program | |
IR 05000293/1985024 | 15 August 1985 | Physical Security Insp Rept 50-293/85-24 on 850806-08. Violation Noted:Failure to Maintain Adequate Vital Area Barrier.Portions Deleted (Ref 10CFR2.790) | |
IR 05000293/1985025 | 12 September 1985 | Enforcement Conference Rept 50-293/85-25 on 850827 Re Findings of Special Insps 50-293/85-21 & 50-293/85-24, Including Concerns of Timely Corrective Action for Abnormal Surveillance Test Findings & Degraded Vital Area Barrier | |
IR 05000293/1985026 | 10 October 1985 | Insp Rept 50-293/85-26 on 850820-0923.Violation Noted: Failure to Take Corrective Action to Ensure That Reactor Operator Overtime Properly Authorized | High Radiation Area Post Accident Monitoring Locked High Radiation Area Systematic Assessment of Licensee Performance |
IR 05000293/1985027 | 18 April 1986 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-293/85-27 | |
IR 05000293/1985028 | 2 December 1985 | Safety Insp Rept 50-293/85-28 on 850924-1104.No Violations Noted.Major Areas Inspected:Followup of Previous Insp Findings,Operational Safety Verification & ESF Walkdown, Followup of Events & Nonroutine Repts & Security Activities | |
IR 05000293/1985029 | 17 October 1985 | Insp Rept 50-293/85-29 on 850928-1002.No Violation Noted. Major Areas Inspected:Licensee Activities Re Movement of Spent Fuel within Spent Fuel Pool & Condition of Refueling Equipment | |
IR 05000293/1985030 | 21 January 1986 | Insp Rept 50-293/85-30 on 851023-1122.No Noncompliance Noted.Major Areas Inspected:Operational Readiness of HPCI Sys.Partial Review Conducted in Areas of Core Spray & Standby Gas Treatment Sys | Safe Shutdown Reactor Vessel Water Level Emergency Lighting |
IR 05000293/1985031 | 3 January 1986 | Safety Insp Rept 50-293/85-31 on 851105-1206.No Violations Noted.Errors Found in Operating Procedure & Valve Checklist for Loop B of LPCI Mode of RHR Sys.Instrumentation Problem Re Drift in Steam Flow Switches Addressed | Half scram Fire Barrier Scram Discharge Volume |
IR 05000293/1985032 | 28 February 1986 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-293/85-32.Existing Tech Specs Should Be Reviewed to Ensure That Appropriate Procedures Established to Implement Specs |