Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML19249C103 | 28 August 1979 | Responds to 790730 Request for Submittal of New or Amended Physical Security Plan Pursuant to 10CFR73.47 Re Snm.Info Withheld (Ref 10CFR2.790) | |
ML19254D647 | 24 October 1979 | Forwards Executed Amend 13 to Indemnity Agreement E-30 | |
ML19263B338 | 3 January 1979 | Responds to NRC 781220 Ltr Re Violations Noted in IE Insp Rept 50-160/78-05.Corrective Actions:More Rigorous Schedule for bi-weekly Analysis & Reactor Operation Staff Will Perform Measurement of Shim Safety Reactivity Worths | |
ML19263C057 | 23 January 1979 | Answers Questions Raised by NRC in Response to Ga Tech 780913 Request for Mod of App a to License R-97.Answers Concern Organizational Changes & shim-safety Blade Maint | Shutdown Margin |
ML19269E318 | 22 June 1979 | Forwards Amend 12 to Indeminty Agreement E-30 | |
ML19294A809 | 14 March 1979 | Responds to 790312 Ltr Requesting Info Re Reactivity Worths for the Shim Safetys in the Reactor.Describes Discrepancies Between Differential Worth Curves Due to Measuring Reactor Under Different Circumstances | |
ML19305E476 | 9 April 1980 | Responds to NRC 800321 Ltr Re Violations Noted in IE Insp Rept 50-160/80-01.Corrective Actions:First Portion of Current Audit Conducted on 800324 & Schedule for Remaining Portion Will Be Developed in Apr | |
ML19305E478 | 13 July 1971 | Repsonds to Questions 3,4,6,7 & 13 Per Div of Reactor Licensing Request Re Proposed Amend to Operate at 5 Mw. Existing Cooling Tower for Secondary Water Is two-cell Unit. Collection Basin & Pump Suction Well Common to Both Units | Emergency Lighting |
ML19309F093 | 4 April 1980 | Notifies That 30-day LER for 800305 Event Will Be Forwarded on 800411 Due to Continuing Problem W/Coolant Flow Anomoly | |
ML19318B325 | 23 June 1980 | Forwards Proposed Physical Security Plan. Plan Withheld (Ref 10CFR2.790) | |
ML19323G429 | 27 May 1980 | Requests Extension Until 800625 to Complete Necessary Changes for Submittal of Amended Security Plan. Implementation of Plan Would Be Accomplished within 30 Days Following NRC Approval | |
ML19332C090 | 16 November 1989 | Forwards Response to Violations Noted in Insp Rept 50-160/89-05.Response Withheld (Ref 10CFR2.790(d)) | |
ML20004F944 | 19 June 1981 | Forwards Revised Pages for Proposed Physical Security Plan, Per 810522 Request.Plan Withheld (Ref 10CFR2.790) | |
ML20005F877 | 6 January 1990 | Responds to Violations Identified in Insp Rept 50-160/89-02. Corrective Actions:Procedure 4000 Revised & Being Reviewed Against Stds ANS 7.60 & Procedure 7247 Drafted to Cover Area & Is Undergoing Review | |
ML20006A514 | 3 January 1990 | Forwards Mod to Security Plan.Mod Withheld (Ref 10CFR2.790(d)) | |
ML20006D535 | 9 February 1990 | Forwards Addl Response to Violations Noted in Insp Rept 50-160/89-05.Encl Withheld (Ref 10CFR2.790(d)) | |
ML20009A184 | 30 June 1981 | Forwards Annual Operating Repts for 1978-80,in Response to NRC Request | |
ML20011F411 | 27 February 1990 | Forwards Proposed Rev to Physical Security Plan.Rev Withheld (Ref 10CFR2.790) | |
ML20011F420 | 1 March 1990 | Forwards Mod to Physical Security Plan.Mod Withheld (Ref 10CFR2.790) | |
ML20012A177 | 27 February 1990 | Forwards Proposed Changes to Georgia Tech Research Reactor Physical Security Plan. Changes Withheld (Ref 10CFR2.790) | |
ML20012A350 | 26 January 1990 | Comments on Three Questions from 900123 Senior Reactor Operator & Reactor Operator Written Exams | |
ML20027E080 | 5 October 1982 | Submits Public Version of Request for Exemption from Emergency Plan Requirements.Reactor de-energized & in Shutdown Since June 1979.Plan Would Delay Preparation of Decommissioning Plans | |
ML20040B236 | 4 December 1981 | Forwards Response to NRC 811106 Ltr Re Violations Noted in IE Insp Repts 50-160/81-02 & 50-276/81-02.Encls Withheld (Ref 10CFR2.790) | |
ML20055G279 | 17 July 1990 | Responds to Violations Noted in Insp Rept 50-160/90-02. Corrective Actions:Procedure 9310,Posting of Radiological Control Areas & Matls, Revised to Clarify Requirement for Positive Control Over High Radiation Area | High Radiation Area |
ML20055H831 | 20 July 1990 | Approves Public Release of 900606 Request for Tech Spec Amend | |
ML20056A104 | 31 July 1990 | Responds to NRC 900720 Request for Addl Info Re 900605 Request for Amend to License R-97 | Shutdown Margin |
ML20063M919 | 20 August 1982 | Responds to NRC Re Violation Noted in IE Insp Rept 50-160/82-01.Corrective Actions:Importance & Specified Requirement to Perform Heat Balance Every Wk Whenever Reactor Is Operated at Above 1 MW Discussed W/Staff | |
ML20065D977 | 3 September 1982 | Forwards Public Version of Draft Proposed Emergency Plan | |
ML20065N816 | 4 October 1982 | Responds to NRC Re Violations Noted in IE Insp Rept 50-160/82-02.Corrective Actions:Personnel Counseled | High Radiation Area |
ML20066G492 | 3 November 1982 | Forwards Public Version of Proposed Emergency Plan | |
ML20072V039 | 10 March 1983 | Responds to NRC Re Violations Noted in IE Insp Rept 50-160/82-01.Corrective Actions:Data Will Be Logged in Immediately Upon Reaching Desired Power & Procedure 2000 Revised to Require Recording of More Complete Set of Data | |
ML20082T792 | 7 October 1983 | Responds to NRC Re Violations Noted in IE Insp Rept 50-160/83-01.Corrective Actions:All Radiological Safety Personnel Advised to Take More Care in Labeling Radioactive Matl Containers | |
ML20091A955 | 26 April 1984 | Responds to NRC Re Violations Noted in IE Insp Rept 50-160/84-01.Corrective Actions:Procedure 7202 Revised to Incorporate Instrument Setup Instructions & Procedure 4000 Revised to Include Containment Bldg Test Steps | |
ML20091E085 | 25 May 1984 | Forwards Dismantling & Disposal Plan for AGN-201 Training Reactor.Fuel Will Be Removed Per Plan Procedures, Packaged in Approved Containers & Moved to Storage Vault. Comprehensive Radiation Survey Performed | |
ML20091R622 | 11 June 1984 | Forwards Organization Chart Effective on 840701 & Advises of Appointment of RA Karam as Director of Nuclear Research Ctr. Ltr of Appointment Encl | |
ML20091R650 | 2 December 1983 | Advises That RA Karam Will Replace Jl Russell as Director of Georgia Inst of Technology Nuclear Research Ctr Effective 831203 | |
ML20092P153 | 25 May 1984 | Responds to NRC Re Violations Noted in IE Insp Rept 50-276/84-02.Corrective Actions:Dismantling & Disposal Plan Encl,Emergency Procedures Appended & Emergency Drill Planned for Summer 1984 | |
ML20098F158 | 26 September 1984 | Requests Authorization to Dismantle Agn 201 Reactor for Eventual Termination of License R-111.Reactor Has Not Been Operated Since 1979.Dismantling Plan Submitted on 840525 | |
ML20100M210 | 11 April 1985 | Responds to Re Carter Request for Smearable Surface Contamination in Disintegrations Per Minute Per 100 CM2 & Imbedded Contamination in Components of Agn 201 Measured in Ur/H at 1 Meter.Smearable Contamination Measurements Encl | |
ML20106J332 | 4 February 1985 | Submits Addl Info Re Decommissioning of Facility,Per .Radiation Safety Officer,Deputy & Health Physicist Present During Defueling Process.Integral Neutron Exposures Obtained from Film Badges | |
ML20117J373 | 7 May 1985 | Requests Deadline for Full Implementation of Approved Emergency Plan Be Extended from 850614 to 851014.Extension Required Due to Possible Physical Mod of Facility | |
ML20117J481 | 7 May 1985 | Requests to Move Defueled Agn 201 to Fenced Area of Research Ctr Due to Room Being Wired for New Spectrometer Scheduled for Delivery in Jul 1985.Decommissioning Application Being Reviewed by NRC | |
ML20136J187 | 20 November 1985 | Advises That Emergency Preparedness Plan Implemented on 851014.Emergency Procedures Encl | |
ML20137E249 | 15 August 1985 | Informs That Defueled Components of AGN-201 Training Reactor Moved from Emerson Bldg to Neely Nuclear Research Ctr,Per .Listed Radiological Surveys Conducted.Survey Results Encl | |
ML20137P590 | 28 January 1986 | Forwards Amend 14 to Indemnity Agreement E-30.Item 2 of Attachment to Agreement Deleted in Entirety & Substituted | |
ML20137P615 | 20 November 1985 | Requests 60-day Extension to Remove Unirradiated High Enriched U Fuel from Facility,Exemption from Developing QA Program for Shipping Fuel & Approval to Retain Three Elements of U-235,in Response to Show Cause Order | |
ML20137P633 | 15 November 1985 | Requests Registration as User of Model ETR | |
ML20138N793 | 9 December 1985 | Responds to Violations Noted in Insp Repts 50-276/85-02 & 50-160/85-03 on 850826-29.Corrective Actions:New Procedure for Analyzing Liquid Waste Appended.W/Two Oversize Encls | |
ML20138R896 | 8 November 1985 | Confirms Recent Telcon Granting Extension of Time Until 851218 to Respond to Insp Rept 50-160/85-03.Extension Necessary Due to Experimentation & Data Gathering to Verify Quantity of Ar-41 Escaping from Containment Bldg | |
ML20148C063 | 15 March 1988 | Advises That Federal Funding Unavaliable for Conversion of Reactor Fuel from High to Low Enrichment.Doe Has Withdrawn Offer to Initiate Conversion Because Reactor Operations May Not Be Continued.Doe Encl |