GO2-82-037, Interim Deficiency Rept Re Reportable Conditions 177 Concerning Bulk Purchase Valves & 175 Wbg Radiographs.Next Rept Expected 820601.All Subsequent Repts Will Be Provided on Quarterly Basis Until Final Rept Is Filed12 April 1982Interim Deficiency Rept Re Reportable Conditions 177 Concerning Bulk Purchase Valves & 175 Wbg Radiographs.Next Rept Expected 820601.All Subsequent Repts Will Be Provided on Quarterly Basis Until Final Rept Is Filed
GO2-82-049, Interim Deficiency Rept Re Excessive Voltage Drop Due to Long Control Cable Length,Initially Reported 820511.Possible Corrective Actions:Number 10 Rather than 12 Size Wire Used & CPT Size for Interposing Relay Increased3 June 1982Interim Deficiency Rept Re Excessive Voltage Drop Due to Long Control Cable Length,Initially Reported 820511.Possible Corrective Actions:Number 10 Rather than 12 Size Wire Used & CPT Size for Interposing Relay IncreasedSafe Shutdown
GO2-82-549, Suppl to Final Deficiency Rept Re Spray Pond Leakage, Initially Reported 810610.Const Joint Between Floor Slab Sections & Foundation Being Repaired.Expansion Joints Replaced21 June 1982Suppl to Final Deficiency Rept Re Spray Pond Leakage, Initially Reported 810610.Const Joint Between Floor Slab Sections & Foundation Being Repaired.Expansion Joints ReplacedUltimate heat sink
GO2-82-563, Final Deficiency Rept Re GE Control Switches Sbm & SB-9, Initially Reported 820303.SB-9 Switches Determined Not Reportable Per 10CFR50.55e.SBM Swithces Installed in Class IE Electrical Applications Replaced23 June 1982Final Deficiency Rept Re GE Control Switches Sbm & SB-9, Initially Reported 820303.SB-9 Switches Determined Not Reportable Per 10CFR50.55e.SBM Swithces Installed in Class IE Electrical Applications Replaced
GO2-82-574, Interim Deficiency Rept Re Concrete Expansion Anchor Program & Concrete & Grout Work.Evaluation Incomplete Due to Complexity of Interfacing Issues.Next Rept to Be Submitted by 8209081 July 1982Interim Deficiency Rept Re Concrete Expansion Anchor Program & Concrete & Grout Work.Evaluation Incomplete Due to Complexity of Interfacing Issues.Next Rept to Be Submitted by 820908Safe Shutdown
GO2-82-605, Final Deficiency Rept 179 Re Containment Penetration Piping/Valves.Initially Reported on 820218.Supply Sys Engineering Evaluation Rept Determined That Ae Properly Specified Temp for Piping & Valves13 July 1982Final Deficiency Rept 179 Re Containment Penetration Piping/Valves.Initially Reported on 820218.Supply Sys Engineering Evaluation Rept Determined That Ae Properly Specified Temp for Piping & Valves
GO2-82-676, Final Deficiency Rept Re Defect in 35-130-200 Battery Chargers Supplied by Power Conversion Products,Inc.Initially Reported on 820716.Replacement of 200 Ampere F1,F2 & F3 Fuses w/300 Ampere Fuses Recommended13 August 1982Final Deficiency Rept Re Defect in 35-130-200 Battery Chargers Supplied by Power Conversion Products,Inc.Initially Reported on 820716.Replacement of 200 Ampere F1,F2 & F3 Fuses w/300 Ampere Fuses Recommended
GO2-82-689, Interim Deficiency Rept Re Johnson Controls Design Issue. Initially Reported on 820720.Analysis of Large Bore Piping & Small Bore Design Underway.Next Rept Expected by 82112318 August 1982Interim Deficiency Rept Re Johnson Controls Design Issue. Initially Reported on 820720.Analysis of Large Bore Piping & Small Bore Design Underway.Next Rept Expected by 821123
GO2-82-727, Final Deficiency Repts Re Conditions 175,WBG Radiographs & 177,bulk Purchase Valves.Initially Reported on 811119 & 1208,respectively.All Quality Class I Welds Accounted For. Wbg Documentation Review of Bulk Purchase Valves Complete1 September 1982Final Deficiency Repts Re Conditions 175,WBG Radiographs & 177,bulk Purchase Valves.Initially Reported on 811119 & 1208,respectively.All Quality Class I Welds Accounted For. Wbg Documentation Review of Bulk Purchase Valves Complete
GO2-82-803, Advises That Deficiency Repts Re Electrical Cable Routing, Termination,Labeling,Power Supplies & QC Documentation Have Been Reopened.Interim Repts Will Be Provided by 82121823 September 1982Advises That Deficiency Repts Re Electrical Cable Routing, Termination,Labeling,Power Supplies & QC Documentation Have Been Reopened.Interim Repts Will Be Provided by 821218
GO2-82-806, Interim Deficiency Rept Re Improper Installation of Concrete Expansion Anchors & Unacceptable Concrete & Grout Work. Initially Reported on 820403.Corrective Actions Continuing. Next Rept Will Be Submitted on 82121828 September 1982Interim Deficiency Rept Re Improper Installation of Concrete Expansion Anchors & Unacceptable Concrete & Grout Work. Initially Reported on 820403.Corrective Actions Continuing. Next Rept Will Be Submitted on 821218
GO2-82-807, Final Deficiency Rept Re High Resistance Cable Grounding of 4.16 Kv Diesel Generators.Initially Reported on 820506. Manufacturers Advised That Equipment Can Operate for Indefinite Period w/line-to-ground Fault W/O Damage28 September 1982Final Deficiency Rept Re High Resistance Cable Grounding of 4.16 Kv Diesel Generators.Initially Reported on 820506. Manufacturers Advised That Equipment Can Operate for Indefinite Period w/line-to-ground Fault W/O Damage
GO2-82-819, Final Deficiency Rept Re 4.16 Kv Breakers DG 1-7 & DG 2-8 & Interim Deficiency Rept Re Emergency Diesel Generators DG-1 & DG-2 Airstart Circuits.Initially Reported on 820830 & 0908,respectively.Next Rept Will Be Submitted by 82122030 September 1982Final Deficiency Rept Re 4.16 Kv Breakers DG 1-7 & DG 2-8 & Interim Deficiency Rept Re Emergency Diesel Generators DG-1 & DG-2 Airstart Circuits.Initially Reported on 820830 & 0908,respectively.Next Rept Will Be Submitted by 821220Safe Shutdown
GO2-82-944, Interim Deficiency Rept Re Voltage Drop Due to Excessive Cable Length.Initially Reported on 820603.Control Power Transformer Output Increased.Voltage No Longer Impeded & Long Cable Used.Next Rept Expected by 83022223 November 1982Interim Deficiency Rept Re Voltage Drop Due to Excessive Cable Length.Initially Reported on 820603.Control Power Transformer Output Increased.Voltage No Longer Impeded & Long Cable Used.Next Rept Expected by 830222Safe Shutdown
GO2-82-945, Interim Deficiency Rept Re Controls for Remote Shutdown Panel & Pump Discharge Switch.Initially Reported on 820819 & 0820,respectively.Switches & Valves Will Be Relocated.Next Rept Will Be Submitted on 83022823 November 1982Interim Deficiency Rept Re Controls for Remote Shutdown Panel & Pump Discharge Switch.Initially Reported on 820819 & 0820,respectively.Switches & Valves Will Be Relocated.Next Rept Will Be Submitted on 830228
GO2-82-955, Deficiency Rept Re Johnson Controls Design Issue.Eight of 132 Small Bore Lines Did Not Meet Min Design Criteria Following Thermal Effects Application2 December 1982Deficiency Rept Re Johnson Controls Design Issue.Eight of 132 Small Bore Lines Did Not Meet Min Design Criteria Following Thermal Effects Application
GO2-82-989, Final Deficiency Repts 210 & 218 Re Deficient Emergency Diesel Generators DG-1 & 2 Airstart Circuits & MSIV Leak Control Sys,Respectively.Initially Reported 820830 & 1111. Silver Plated Contacts to Be Replaced in Airstart Circuits17 December 1982Final Deficiency Repts 210 & 218 Re Deficient Emergency Diesel Generators DG-1 & 2 Airstart Circuits & MSIV Leak Control Sys,Respectively.Initially Reported 820830 & 1111. Silver Plated Contacts to Be Replaced in Airstart CircuitsSafe Shutdown
GO2-83-100, Final Deficiency Rept,Condition 291 Re Containment Atmospheric Control Valves Not Powered from Class IE Source. Initially Reported on 830929.Caused by Failure to Recognize Valves Have Two Safety functions.PED-218-E-C105 Issued2 November 1983Final Deficiency Rept,Condition 291 Re Containment Atmospheric Control Valves Not Powered from Class IE Source. Initially Reported on 830929.Caused by Failure to Recognize Valves Have Two Safety functions.PED-218-E-C105 Issued
GO2-83-101, Final Deficiency Rept,Condition 216 Re RHR Relief Valve Vents.Initially Reported on 821022.Relief Valves Removed, Eliminating Containment Leakage Path.Const in Progress on Physical Changes & Will Be Complete Prior to Fuel Load3 November 1983Final Deficiency Rept,Condition 216 Re RHR Relief Valve Vents.Initially Reported on 821022.Relief Valves Removed, Eliminating Containment Leakage Path.Const in Progress on Physical Changes & Will Be Complete Prior to Fuel Load
GO2-83-106, Final Deficiency Rept,Condition 286 Re Linear Indication on Containment Weld Pads.Initially Reported on 831014.Potential for Beam Seat Separation Under Worst Case Loads Nonexistent. Item Not Reportable Per 10CFR50.55(e)16 November 1983Final Deficiency Rept,Condition 286 Re Linear Indication on Containment Weld Pads.Initially Reported on 831014.Potential for Beam Seat Separation Under Worst Case Loads Nonexistent. Item Not Reportable Per 10CFR50.55(e)
GO2-83-109, Final Deficiency Rept,Condition 274 Re Excessive Gapping Between Pipe Support baseplates.Fifty-nine of 2,299 Baseplates Require Rework to Correct Deficient Baseplate Gap23 November 1983Final Deficiency Rept,Condition 274 Re Excessive Gapping Between Pipe Support baseplates.Fifty-nine of 2,299 Baseplates Require Rework to Correct Deficient Baseplate Gap
GO2-83-110, Final Deficiency Rept,Condition 296 Re Loose Internal Assembly Screws on GE Type Hfa Relays.Caused by Design or QC Deficiency by Relay Manufacturer.Also Reportable Under Part 2129 November 1983Final Deficiency Rept,Condition 296 Re Loose Internal Assembly Screws on GE Type Hfa Relays.Caused by Design or QC Deficiency by Relay Manufacturer.Also Reportable Under Part 21
GO2-83-111, Revised Final Deficiency Rept,Condition 51 Re Nonseismic Class 1 Digital Electrohydraulic Cabinets.Initially Reported on 810624.Reanalysis Concluded That Digital Electrohydraulic Cabinets Cannot Fall Over During DBE2 December 1983Revised Final Deficiency Rept,Condition 51 Re Nonseismic Class 1 Digital Electrohydraulic Cabinets.Initially Reported on 810624.Reanalysis Concluded That Digital Electrohydraulic Cabinets Cannot Fall Over During DBESafe Shutdown Earthquake
GO2-83-113, Final Deficiency Rept,Condition 302 Re Mods Covering HPCS Second Level Undervoltage Protection Producing Potential Conditions for HPCS Pump to Fail to Start on Valid Initiation Signal.Design Revised9 December 1983Final Deficiency Rept,Condition 302 Re Mods Covering HPCS Second Level Undervoltage Protection Producing Potential Conditions for HPCS Pump to Fail to Start on Valid Initiation Signal.Design RevisedSafe Shutdown
GO2-83-115, Final Part 21 Rept on Condition 295 Re Standby Gas Treatment Unit Charcoal Filter Bed Leakage.Initially Reported on 831115.Gaps Between Frame & Perforated Plates Sealed W/Ge Sealant 72713 December 1983Final Part 21 Rept on Condition 295 Re Standby Gas Treatment Unit Charcoal Filter Bed Leakage.Initially Reported on 831115.Gaps Between Frame & Perforated Plates Sealed W/Ge Sealant 727
GO2-83-116, Final Part 21 & Deficiency Rept Re Recombiner Scrubber Drainage Impaired by Design Configuration of Connections for Water Loop Seal & Process Blower on Recombiner Skid. Initially Reported on 83121516 December 1983Final Part 21 & Deficiency Rept Re Recombiner Scrubber Drainage Impaired by Design Configuration of Connections for Water Loop Seal & Process Blower on Recombiner Skid. Initially Reported on 831215Loop seal
GO2-83-117, Final Deficiency Rept,Condition 307 Re Target Rock Isolation Valve 82M-002 on Loop B Not Closing When Deenergized. Initially Reported on 831219.Twelve Valves Disassembled, Readjusted & Reinstalled Under Vendor Supervision20 December 1983Final Deficiency Rept,Condition 307 Re Target Rock Isolation Valve 82M-002 on Loop B Not Closing When Deenergized. Initially Reported on 831219.Twelve Valves Disassembled, Readjusted & Reinstalled Under Vendor Supervision
GO2-83-160, Final Deficiency Rept 190 Re Excessive Cable Length Causing Voltage Drop.Initially Reported on 820511.Control Power Transformer Increased from 300 VA to 500 VA to Preclude Voltage Drop22 February 1983Final Deficiency Rept 190 Re Excessive Cable Length Causing Voltage Drop.Initially Reported on 820511.Control Power Transformer Increased from 300 VA to 500 VA to Preclude Voltage DropSafe Shutdown
GO2-83-174, Final Deficiency Rept on Conditions 208,209,223 & 229 Re Remote Shutdown Panel,Rhr & LPCS Pump Discharge Pressure Switches,Standby Liquid Control Sys & Missing Hangers in Turned Over HPCS Sys 7.1,respectively.Next Rept Due 83052325 February 1983Final Deficiency Rept on Conditions 208,209,223 & 229 Re Remote Shutdown Panel,Rhr & LPCS Pump Discharge Pressure Switches,Standby Liquid Control Sys & Missing Hangers in Turned Over HPCS Sys 7.1,respectively.Next Rept Due 830523Safe Shutdown
Earthquake
GO2-83-188, Final Deficiency Rept Re Damage to Electrical Cable 2SM8- 0080 During Installation of Thermo Lag Fire Resistant Matl (Condition 235).Initially Reported on 830204.Damaged Cable Repaired.Condition Not Reportable Per 10CFR50.55(e)3 March 1983Final Deficiency Rept Re Damage to Electrical Cable 2SM8- 0080 During Installation of Thermo Lag Fire Resistant Matl (Condition 235).Initially Reported on 830204.Damaged Cable Repaired.Condition Not Reportable Per 10CFR50.55(e)
GO2-83-253, Interim Deficiency Rept Re Loss of ESF Loads on Under Voltage Trip.Initially Reported on 830228.Project Engineering Directive 218-E-4618 Issued to Implement Corrective Action.Next Rept Expected by 83062424 March 1983Interim Deficiency Rept Re Loss of ESF Loads on Under Voltage Trip.Initially Reported on 830228.Project Engineering Directive 218-E-4618 Issued to Implement Corrective Action.Next Rept Expected by 830624Safe Shutdown
GO2-83-313, Final Deficiency Rept Re Incorrect Wiring of Reactor Vessel Water Level Indicating Switches MS-LIS-37A & MS-LIS-37C. Initially Reported on 830315.Switches Rewired to Conform to GE Design Requirements6 April 1983Final Deficiency Rept Re Incorrect Wiring of Reactor Vessel Water Level Indicating Switches MS-LIS-37A & MS-LIS-37C. Initially Reported on 830315.Switches Rewired to Conform to GE Design RequirementsReactor Vessel Water Level
GO2-83-314, Interim Deficiency Rept Re balance-of-plant Board G-2 Design Error.Initially Reported on 830315.Drawing Part Lists Will Be Updated to Provide Correct Part Numbers.Next Rept Will Be Submitted by 8307066 April 1983Interim Deficiency Rept Re balance-of-plant Board G-2 Design Error.Initially Reported on 830315.Drawing Part Lists Will Be Updated to Provide Correct Part Numbers.Next Rept Will Be Submitted by 830706Safe Shutdown
GO2-83-333, Final Deficiency Rept Re Failure of Temp Control Modules WMA-TS-12A & 12B During Qualification Testing (Condition 238).Initially Reported on 830310.Printed Circuit Board Traces Replaced W/Wire Jumpers.Condition Not Reportable12 April 1983Final Deficiency Rept Re Failure of Temp Control Modules WMA-TS-12A & 12B During Qualification Testing (Condition 238).Initially Reported on 830310.Printed Circuit Board Traces Replaced W/Wire Jumpers.Condition Not Reportable
GO2-83-349, Part 21 Rept Re Linear Indications Identified in SA 106 Grade Pipe.Initially Reported on 830413.Caused by Mfg Process Error & Ultrasonic Exam Inadequacies.All Seamless Pipe Put on Hold & Magnetic Particle Examined15 April 1983Part 21 Rept Re Linear Indications Identified in SA 106 Grade Pipe.Initially Reported on 830413.Caused by Mfg Process Error & Ultrasonic Exam Inadequacies.All Seamless Pipe Put on Hold & Magnetic Particle Examined
GO2-83-353, Final & Interim Deficiency Repts Re Class IE Cables in Seismic Category 1 Raceways & Standby Gas Treatment Sys Damper.Next Rept by 83071818 April 1983Final & Interim Deficiency Repts Re Class IE Cables in Seismic Category 1 Raceways & Standby Gas Treatment Sys Damper.Next Rept by 830718Safe Shutdown Earthquake
GO2-83-358, Interim Deficiency Repts Re IE Circular 81-05, Sway Strut/ Snubber End Bushings & Anaconda Flexible Conduit.Initially Reported on 821202 & 830321,respectively.Quarterly Updates Will Continue to Be Provided.Next Rept Expected by 83072020 April 1983Interim Deficiency Repts Re IE Circular 81-05, Sway Strut/ Snubber End Bushings & Anaconda Flexible Conduit.Initially Reported on 821202 & 830321,respectively.Quarterly Updates Will Continue to Be Provided.Next Rept Expected by 830720
GO2-83-389, Interim Deficiency Repts on Condition 221 Re Namco EA-180 & EA-740 Limit Switches & Condition 226 Re 125-volt Dc Motor Operator Connected to 250-volt Dc Power Source.Next Rept by 83072626 April 1983Interim Deficiency Repts on Condition 221 Re Namco EA-180 & EA-740 Limit Switches & Condition 226 Re 125-volt Dc Motor Operator Connected to 250-volt Dc Power Source.Next Rept by 830726
GO2-83-436, Interim Deficiency Repts 216 & 223 Re Gaseous Release from RHR Relief Valve Vents & Inadequate Standby Liquid Control Sys,Respectively.Final Deficiency Rept 232 Re Improper Installation of RHR Support Pin Receptacle Also Encl17 May 1983Interim Deficiency Repts 216 & 223 Re Gaseous Release from RHR Relief Valve Vents & Inadequate Standby Liquid Control Sys,Respectively.Final Deficiency Rept 232 Re Improper Installation of RHR Support Pin Receptacle Also EnclSafe Shutdown
GO2-83-463, Final Deficiency Repts 229 & 254 Re Hangers Not Installed in Turned Over HPCS Sys 7.1 & Improper Installation of Lubrite Assemblies,Respectively.Interim Rept 251 Re Limitorque Motor Operators W/Motors Supplied by Baldor Encl23 May 1983Final Deficiency Repts 229 & 254 Re Hangers Not Installed in Turned Over HPCS Sys 7.1 & Improper Installation of Lubrite Assemblies,Respectively.Interim Rept 251 Re Limitorque Motor Operators W/Motors Supplied by Baldor EnclEarthquake
GO2-83-595, Final Deficiency Rept Condition 246 Re Balance of Plant Board G-2 Design Error.Initially Reported on 830315.AE Issued Project Engineering Directive (PED-218-E-B375) to Switch Power Supplies1 July 1983Final Deficiency Rept Condition 246 Re Balance of Plant Board G-2 Design Error.Initially Reported on 830315.AE Issued Project Engineering Directive (PED-218-E-B375) to Switch Power SuppliesSafe Shutdown
GO2-83-610, Interim Deficiency Rept Re Reportable Condition 264, Concerning Improperly Sized Overcurrent Devices.Initially Reported on 830609.Pump & Valve Operator Motor Fuses Replaced.Fuse Size Verified.Next Rept by 8310038 July 1983Interim Deficiency Rept Re Reportable Condition 264, Concerning Improperly Sized Overcurrent Devices.Initially Reported on 830609.Pump & Valve Operator Motor Fuses Replaced.Fuse Size Verified.Next Rept by 831003
GO2-83-652, Revised Final Deficiency Rept for Condition 212 Re 8-H Rayproof Doors & Interim Deficiency Rept for Condition 262 Re Installation of Unapproved Power Piping Brackets.Next Rept Expected by 83102122 July 1983Revised Final Deficiency Rept for Condition 212 Re 8-H Rayproof Doors & Interim Deficiency Rept for Condition 262 Re Installation of Unapproved Power Piping Brackets.Next Rept Expected by 831021
GO2-83-654, Interim Deficiency Rept Item 221 & Final Deficiency Rept Item 251 Re Namco EA180 & EA740 Limit Switches & Limitorque Motor Operators W/Motors from Baldor Electric Co, Respectively.Initially Reported on 830104 & 042225 July 1983Interim Deficiency Rept Item 221 & Final Deficiency Rept Item 251 Re Namco EA180 & EA740 Limit Switches & Limitorque Motor Operators W/Motors from Baldor Electric Co, Respectively.Initially Reported on 830104 & 0422
GO2-83-671, Interim Deficiency Rept of Condition 269 Re Bechtel Repair of Wrong Weld Area.Initially Reported on 830705.Const Manager Will Compare Radiograph from Repair W/Original to Ensure Correct Area Welded.Next Rept Expected by 83102528 July 1983Interim Deficiency Rept of Condition 269 Re Bechtel Repair of Wrong Weld Area.Initially Reported on 830705.Const Manager Will Compare Radiograph from Repair W/Original to Ensure Correct Area Welded.Next Rept Expected by 831025
GO2-83-742, Final Deficiency Repts Re Conditions 264 & 276 Concerning Improperly Sized Overcurrent Devices & Diesel Generator 1A Bearing Failure,Respectively.Initially Reported on 830609 & 0802.Pump & Valve Operator Motor Fuses Replaced18 August 1983Final Deficiency Repts Re Conditions 264 & 276 Concerning Improperly Sized Overcurrent Devices & Diesel Generator 1A Bearing Failure,Respectively.Initially Reported on 830609 & 0802.Pump & Valve Operator Motor Fuses ReplacedSafe Shutdown
GO2-83-761, Final & Interim Deficiency Repts Re Conditions 223 & 260 Concerning Standby Liquid Control Sys & Standby Svc Water Flow Problems.Initially Reported on 830127 & 0721.Sys Will Be Modified Per Separation Criteria.Next Rept by 83110111 August 1983Final & Interim Deficiency Repts Re Conditions 223 & 260 Concerning Standby Liquid Control Sys & Standby Svc Water Flow Problems.Initially Reported on 830127 & 0721.Sys Will Be Modified Per Separation Criteria.Next Rept by 831101Safe Shutdown
GO2-83-795, Interim Deficiency Rept,Condition 277 Re Dc Motor Starting Resistors.Initially Reported on 830805.Ohmic Rating of in-place Resistor Setting Via Field Measurements to Be Determined.Next Rept Will Be Provided by 8310252 September 1983Interim Deficiency Rept,Condition 277 Re Dc Motor Starting Resistors.Initially Reported on 830805.Ohmic Rating of in-place Resistor Setting Via Field Measurements to Be Determined.Next Rept Will Be Provided by 831025
GO2-83-815, Final Deficiency Rept 251 Re Limitorque Motor Operators W/ Motors from Baldor Electric Co Unqualified Per IEEE 382-1972.Initially Reported on 830422.Limitorque Will Replace Motors W/Units That Meet NUREG-0588 Requirements8 September 1983Final Deficiency Rept 251 Re Limitorque Motor Operators W/ Motors from Baldor Electric Co Unqualified Per IEEE 382-1972.Initially Reported on 830422.Limitorque Will Replace Motors W/Units That Meet NUREG-0588 Requirements
GO2-83-820, Final Deficiency Rept,Item 269 Re Bechtel Power Corp Repair of Wrong Weld Area.Initially Reported on 830705.Remaining Two Welds Qualified Per Class Ii,Ansi B31.1.Two Welds Successfully Repaired & Reradiographed9 September 1983Final Deficiency Rept,Item 269 Re Bechtel Power Corp Repair of Wrong Weld Area.Initially Reported on 830705.Remaining Two Welds Qualified Per Class Ii,Ansi B31.1.Two Welds Successfully Repaired & ReradiographedLiquid penetrant