05000424/LER-1990-006, Responds to NRC 940509 Demand for Info Re Actions of Four Individuals Associate W/Plant in Finalizing 900629 Cover Ltr for Rev to LER 90-00631 July 1994Responds to NRC 940509 Demand for Info Re Actions of Four Individuals Associate W/Plant in Finalizing 900629 Cover Ltr for Rev to LER 90-006
05000424/LER-1991-004, Submits Addl Info Re Amended 2.206 Petition Filed by M Hobby & a Mosbaugh Re Failure to Comply W/Tech Spec 3.0.4 on Entry Into Mode 6 on 900301,described in LER 91-004-0010 December 1991Submits Addl Info Re Amended 2.206 Petition Filed by M Hobby & a Mosbaugh Re Failure to Comply W/Tech Spec 3.0.4 on Entry Into Mode 6 on 900301,described in LER 91-004-00
05000424/LER-1997-002, Forwards LER 97-002-02,per 10CFR50.73.Encl Is Second Rev to LER Originally Submitted on 970220 & First Revised on 970730.Revs Are Marked W/Rev Bars in Left Hand Border3 March 1998Forwards LER 97-002-02,per 10CFR50.73.Encl Is Second Rev to LER Originally Submitted on 970220 & First Revised on 970730.Revs Are Marked W/Rev Bars in Left Hand Border
05000424/LER-1997-004, Corrected Copy of Forwarding LER 97-004-00,re Condition Discovered to Exist on 97032216 April 1997Corrected Copy of Forwarding LER 97-004-00,re Condition Discovered to Exist on 970322
05000424/LER-1998-001, Forwards LER 98-001-01 Re Concrete Degradation Found in DG Exhaust Barriers.Changes Made Under Rev Marked W/Rev Bars on Left,Outside of LER Border25 March 1998Forwards LER 98-001-01 Re Concrete Degradation Found in DG Exhaust Barriers.Changes Made Under Rev Marked W/Rev Bars on Left,Outside of LER Border
05000424/LER-1998-006, Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Exi10 May 1999Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Existed
05000424/LER-1998-007, Forwards LER 98-007-00,re Inadequate Surveillances Due to Improperly Performed Response Time Testing,On 981215,IAW 10CFR50.7313 January 1999Forwards LER 98-007-00,re Inadequate Surveillances Due to Improperly Performed Response Time Testing,On 981215,IAW 10CFR50.73
05000424/LER-1998-009, Forwards LER 98-009-00 Re Event in Which Improper Testing Method Resulted in Inadequate Surveillances on 98122927 January 1999Forwards LER 98-009-00 Re Event in Which Improper Testing Method Resulted in Inadequate Surveillances on 981229
05000425/LER-1998-004, Forwards LER 98-004-01 Re Defeat of Turbine Trip Function That Lead to Improper Mode Entry.Revised LER Corrects Statement Re Generation of Turbine Trip Signal Upon Operating Reactor Trip Breakers10 September 1998Forwards LER 98-004-01 Re Defeat of Turbine Trip Function That Lead to Improper Mode Entry.Revised LER Corrects Statement Re Generation of Turbine Trip Signal Upon Operating Reactor Trip Breakers
05000425/LER-1998-005, Forwards LER 98-005-01,extending Completion Date for Corrective Action 6 Which Is Necessary to Involve Offsite Engineering Organizations in Performance of Broadness Review.Corrective Actions 2 & 5 Have Been Updated24 August 1998Forwards LER 98-005-01,extending Completion Date for Corrective Action 6 Which Is Necessary to Involve Offsite Engineering Organizations in Performance of Broadness Review.Corrective Actions 2 & 5 Have Been Updated
A850208, Submits Results of Review of Des (NUREG-1087).DES Consistent W/State,Social,Economic,Physical Goals,Policies,Plans & Programs.Dept of Natural Resources Comments Encl20 February 1985Submits Results of Review of Des (NUREG-1087).DES Consistent W/State,Social,Economic,Physical Goals,Policies,Plans & Programs.Dept of Natural Resources Comments Encl
B10630, Forwards Revision to Physical Security Plan.Revision Withheld (Ref 10CFR2.790)9 December 1982Forwards Revision to Physical Security Plan.Revision Withheld (Ref 10CFR2.790)
B12287, Remits Insp Fees for Facilities & Matls Licenses for First Quarter 1986.Invoices Encl17 October 1986Remits Insp Fees for Facilities & Matls Licenses for First Quarter 1986.Invoices Encl
DD-97-06, Provides NRC Staff W/Reply to Issues Raised in Re Director Decision DD-97-06 Issued on 970318,in Response to Petition Filed,Per 10CFR2.20629 July 1997Provides NRC Staff W/Reply to Issues Raised in Re Director Decision DD-97-06 Issued on 970318,in Response to Petition Filed,Per 10CFR2.206
ELV-00013, Forwards Revs to Physical Security & Contingency Plan,Per NRC .Revs Withheld (Ref 10CFR73.21 & 2.790)21 November 1988Forwards Revs to Physical Security & Contingency Plan,Per NRC .Revs Withheld (Ref 10CFR73.21 & 2.790)
ELV-00015, Forwards Revised Response to Violations Noted in Insp Rept 50-424/88-29.Encl Withheld (Ref 10CFR73.21 & 2.790)23 November 1988Forwards Revised Response to Violations Noted in Insp Rept 50-424/88-29.Encl Withheld (Ref 10CFR73.21 & 2.790)
ELV-00036, Forwards Fifth Suppl to Summary Rept of Plant Startup Test Program.Suppl Addresses Remaining Startup Tests Incomplete as of Last Submittal30 November 1988Forwards Fifth Suppl to Summary Rept of Plant Startup Test Program.Suppl Addresses Remaining Startup Tests Incomplete as of Last Submittal
ELV-00062, Responds to NRC Bulletin 88-003 Requesting That Insps Be Performed for All GE latching-type Hfa Relays in Class 1E Applications.Fourteen GE 12HFA54E187H Relays Inspected on 881108 for Unit 1 & on 880606 for Unit 27 December 1988Responds to NRC Bulletin 88-003 Requesting That Insps Be Performed for All GE latching-type Hfa Relays in Class 1E Applications.Fourteen GE 12HFA54E187H Relays Inspected on 881108 for Unit 1 & on 880606 for Unit 2
ELV-00254, Forwards Personnel Resumes for Review by Commissioner Rogers.W/O Encls9 February 1989Forwards Personnel Resumes for Review by Commissioner Rogers.W/O Encls
ELV-00272, Forwards Cycle 1 Radial Peaking Factor Limit Rept,Per Tech Spec 6.8.1.6 & Elevation Dependent Peaking Factor Versus Core Height Graph3 April 1989Forwards Cycle 1 Radial Peaking Factor Limit Rept,Per Tech Spec 6.8.1.6 & Elevation Dependent Peaking Factor Versus Core Height Graph
ELV-00273, Forwards Sixth Suppl to Summary Rept of Startup Test Program.Initial Summary Rept Submitted on 870831.Suppl Addresses Remaining Startup Tests Incomplete as of Last Submittal28 February 1989Forwards Sixth Suppl to Summary Rept of Startup Test Program.Initial Summary Rept Submitted on 870831.Suppl Addresses Remaining Startup Tests Incomplete as of Last Submittal
ELV-00275, Forwards Response to Violations Noted in Insp Rept 50-424/89-06.Response Withheld28 February 1989Forwards Response to Violations Noted in Insp Rept 50-424/89-06.Response Withheld
ELV-00294, Forwards Reactor Containment Bldg Integrated Leakage Rate Test, Per 10CFR50,App J28 February 1989Forwards Reactor Containment Bldg Integrated Leakage Rate Test, Per 10CFR50,App J
ELV-00304, Forwards Revised Response to Violation Noted in Insp Rept 50-424/88-56 on 881029-1216.Corrective Actions:Performance of post-refueling Outage Containment Insp & Evaluation Upgraded & Operations Personnel Briefed on Subj Notice7 March 1989Forwards Revised Response to Violation Noted in Insp Rept 50-424/88-56 on 881029-1216.Corrective Actions:Performance of post-refueling Outage Containment Insp & Evaluation Upgraded & Operations Personnel Briefed on Subj Notice
ELV-00310, Responds to Violations Noted in Insp Rept 50-424/88-61. Corrective Actions:Shift Operators Counseled on Failure to Follow Procedural Requirements of Procedure 10001-C7 March 1989Responds to Violations Noted in Insp Rept 50-424/88-61. Corrective Actions:Shift Operators Counseled on Failure to Follow Procedural Requirements of Procedure 10001-C
ELV-00311, Informs of Completion of 1,000 H Availability Test of Spds. Several Radiation Monitors out-of-svc During Part of Test Period or for Entire Test Period.W/Monitors Excluded from Test Criteria,Availability of 99.936% Achieved10 March 1989Informs of Completion of 1,000 H Availability Test of Spds. Several Radiation Monitors out-of-svc During Part of Test Period or for Entire Test Period.W/Monitors Excluded from Test Criteria,Availability of 99.936% Achieved
ELV-00330, Forwards Suppl to Rev 11 to Emergency Plan.Suppl Corrects Administrative Errors14 March 1989Forwards Suppl to Rev 11 to Emergency Plan.Suppl Corrects Administrative Errors
ELV-00332, Forwards Response to Re Request for Certain Existing Plant Documents to Be Utilized in Development of risk-based Insp Guide.W/O Attachments14 March 1989Forwards Response to Re Request for Certain Existing Plant Documents to Be Utilized in Development of risk-based Insp Guide.W/O Attachments
ELV-00336, Requests NRC Comments Re Reactor Trip Breaker Maint Frequency by 890421.Based on Westinghouse Recommendations, Maint Interval of 500 Operations,Or 18 Months,Whichever Comes First,More Appropriate for Group a Maint28 March 1989Requests NRC Comments Re Reactor Trip Breaker Maint Frequency by 890421.Based on Westinghouse Recommendations, Maint Interval of 500 Operations,Or 18 Months,Whichever Comes First,More Appropriate for Group a Maint
ELV-00340, Forwards Revised Monthly Operating Rept for Jan 1989 & Monthly Operating Rept for Feb 1989 for Vogtle,Units 1 & 215 March 1989Forwards Revised Monthly Operating Rept for Jan 1989 & Monthly Operating Rept for Feb 1989 for Vogtle,Units 1 & 2
ELV-00342, Forwards Executed Amend 4 to Indemnity Agreement B-10716 March 1989Forwards Executed Amend 4 to Indemnity Agreement B-107
ELV-00358, Completes Response to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Instrumentation for Unisolable Sections of Piping to Detect Adverse Temp Distributions Installed & Data Collection Initiated27 March 1989Completes Response to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Instrumentation for Unisolable Sections of Piping to Detect Adverse Temp Distributions Installed & Data Collection Initiated
ELV-00365, Forwards Comments on Sser 8.Spent Fuel Storage Racks Will Have Boraflex on All Sides,Including Sides Adjacent to Fuel Pool Walls16 March 1989Forwards Comments on Sser 8.Spent Fuel Storage Racks Will Have Boraflex on All Sides,Including Sides Adjacent to Fuel Pool Walls
ELV-00373, Provides Rept of Present Level of Insurance & Sources of Insurance for Plant,Per 10CFR50.54(W)(2)23 March 1989Provides Rept of Present Level of Insurance & Sources of Insurance for Plant,Per 10CFR50.54(W)(2)
ELV-00376, Responds to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. Util Identified 759 Molded Case Circuit Breakers Being Maintained as safety-related Spares in Unit 1 Warehouse as of 88120531 March 1989Responds to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. Util Identified 759 Molded Case Circuit Breakers Being Maintained as safety-related Spares in Unit 1 Warehouse as of 881205
ELV-00378, Responds to Violations Noted in Insp Rept 50-425/89-03. Corrective Actions:Controls in Place & Implemented to Identify,Track & Review Deficiencies for Reportability28 March 1989Responds to Violations Noted in Insp Rept 50-425/89-03. Corrective Actions:Controls in Place & Implemented to Identify,Track & Review Deficiencies for Reportability
ELV-00432, Responds to Station Blackout Rule.Blackout Start Procedure & Restoration of Offsite Ac Power for Shutdown Added to Existing Procedures for Coping W/Station Blackout.Mods Required to Obtain 4 H Coping Duration Listed12 April 1989Responds to Station Blackout Rule.Blackout Start Procedure & Restoration of Offsite Ac Power for Shutdown Added to Existing Procedures for Coping W/Station Blackout.Mods Required to Obtain 4 H Coping Duration ListedSafe Shutdown
ELV-00436, Forwards Response to Violations Noted in Insp Rept 50-424/89-09 on 890202-03.Response Withheld7 April 1989Forwards Response to Violations Noted in Insp Rept 50-424/89-09 on 890202-03.Response Withheld
ELV-00449, Forwards Amend 12 to Physical Security Plan.Amend Withheld (Ref 10CFR73.21)28 April 1989Forwards Amend 12 to Physical Security Plan.Amend Withheld (Ref 10CFR73.21)
ELV-00458, Forwards Amend 5 to Indemnity Agreement B-10721 April 1989Forwards Amend 5 to Indemnity Agreement B-107
ELV-00473, Submits Change to Initial Startup Test Program Described in Chapter 14 of Fsar.Change Adds Footnote to Test Abstract for Containment,Auxiliary,Control & Fuel Handling Bldgs Drain Sys1 May 1989Submits Change to Initial Startup Test Program Described in Chapter 14 of Fsar.Change Adds Footnote to Test Abstract for Containment,Auxiliary,Control & Fuel Handling Bldgs Drain SysBoric Acid
ELV-00475, Forwards Vogtle Unit 1 Annual Rept,Part 21 May 1989Forwards Vogtle Unit 1 Annual Rept,Part 2
ELV-00476, Requests Extension for Annual Simulator Test Until mid-Jul 1989.Proposes Extension of Deadline for First Annual Operability Test to 900228,to Allow Testing to Be Performed After New Models Are Operational & Allow Acceptance Test28 April 1989Requests Extension for Annual Simulator Test Until mid-Jul 1989.Proposes Extension of Deadline for First Annual Operability Test to 900228,to Allow Testing to Be Performed After New Models Are Operational & Allow Acceptance Test
ELV-00478, Forwards Objectives & Scope of Annual Emergency Preparedness Exercise Scheduled for 890726.Exercise Will Not Involve Evaluated Participation by State or County Agencies8 May 1989Forwards Objectives & Scope of Annual Emergency Preparedness Exercise Scheduled for 890726.Exercise Will Not Involve Evaluated Participation by State or County Agencies
ELV-00484, Informs of Change in Distribution for NRC Correspondence Due to Recent Completion of Const of Unit 2 & Relocation of Nuclear Operations Corporate Ofc to Birmingham,Al.Revised List Encl1 May 1989Informs of Change in Distribution for NRC Correspondence Due to Recent Completion of Const of Unit 2 & Relocation of Nuclear Operations Corporate Ofc to Birmingham,Al.Revised List Encl
ELV-00488, Informs of Two Minor Errors to Be Corrected in NRC Hearing for Plant Full Power License.Organization Described on Figures 13.1.1-1 & 13.1.1-2 of Plant FSAR1 May 1989Informs of Two Minor Errors to Be Corrected in NRC Hearing for Plant Full Power License.Organization Described on Figures 13.1.1-1 & 13.1.1-2 of Plant FSAR
ELV-00499, Submits Three Changes to Description of Initial Startup Test Program in Chapter 14 of Fsar.Changes Add Footnote to Test Abstract for Boron Thermal Regeneration Sys & Liquid Waste Processing Sys11 May 1989Submits Three Changes to Description of Initial Startup Test Program in Chapter 14 of Fsar.Changes Add Footnote to Test Abstract for Boron Thermal Regeneration Sys & Liquid Waste Processing SysHydrostatic
ELV-00503, Forwards Status of Control Room Design Review,Human Engineering Discrepancies & Similarity Review Remaining Issues. All Confirmatory Items Addressed Except Annunicator Nuisance Alarms9 May 1989Forwards Status of Control Room Design Review,Human Engineering Discrepancies & Similarity Review Remaining Issues. All Confirmatory Items Addressed Except Annunicator Nuisance Alarms
ELV-00512, Forwards Proprietary Rev 1 to WCAP-11312 & Nonproprietary Rev 1 to WCAP-11966, Westinghouse Owners Group Tech Spec Subcommittee Reactor Trip Breaker Maint/Surveillance.... Proprietary Rept Withheld (Ref 10CFR2.790)25 July 1989Forwards Proprietary Rev 1 to WCAP-11312 & Nonproprietary Rev 1 to WCAP-11966, Westinghouse Owners Group Tech Spec Subcommittee Reactor Trip Breaker Maint/Surveillance.... Proprietary Rept Withheld (Ref 10CFR2.790)
ELV-00515, Responds to Violations Noted in Insp Repts 50-424/89-10 & 50-425/89-12 on 890208-0317.Corrective Actions:Qc Inspector Counseled Re Failure to Comply W/Procedure 85301-C Requirements & Personnel Appraised of Problem18 May 1989Responds to Violations Noted in Insp Repts 50-424/89-10 & 50-425/89-12 on 890208-0317.Corrective Actions:Qc Inspector Counseled Re Failure to Comply W/Procedure 85301-C Requirements & Personnel Appraised of Problem