Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
05000456/LER-1986-009, Informs of Typo in LER 86-009-00 Re Issuance of Suppl to Ler.No Suppl Will Be Issued21 January 1987Informs of Typo in LER 86-009-00 Re Issuance of Suppl to Ler.No Suppl Will Be Issued
05000456/LER-1993-007, Resubmits LER 93-007-00 to Correct Incorrect Date on Transmittal Cover Ltr11 February 1994Resubmits LER 93-007-00 to Correct Incorrect Date on Transmittal Cover Ltr
05000456/LER-1997-009, Forwards Supplement to LER 97-009-00,originally Submitted on 971126,IAW 10CFR50.73(a)(2)(ii)20 March 1998Forwards Supplement to LER 97-009-00,originally Submitted on 971126,IAW 10CFR50.73(a)(2)(ii)
05000456/LER-1998-003, Forwards LER 98-003-00 from Braidwood Generating Station,Iaw 10CFR50.73(a)(2)(iv).Listed Commitments Made in LER6 October 1998Forwards LER 98-003-00 from Braidwood Generating Station,Iaw 10CFR50.73(a)(2)(iv).Listed Commitments Made in LER
05000456/LER-1998-004, Forwards LER 98-004-01,IAW 10CFR50.73(a)(2)(i)(B). LER 98-004 Included Commitment to Transmit Supplemental Rept by 990628,due to on-going Evaluations16 June 1999Forwards LER 98-004-01,IAW 10CFR50.73(a)(2)(i)(B). LER 98-004 Included Commitment to Transmit Supplemental Rept by 990628,due to on-going Evaluations
05000456/LER-1998-005, Forwards LER 98-005-00 Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Util,Listed3 November 1998Forwards LER 98-005-00 Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Util,Listed
05000456/LER-1998-006, Forwards LER 98-006-00 IAW 10CFR50.73(a)(2)(i)(B),which Requires 30 Day Rept.Ler Commitments Listed16 December 1998Forwards LER 98-006-00 IAW 10CFR50.73(a)(2)(i)(B),which Requires 30 Day Rept.Ler Commitments Listed
05000456/LER-1998-007, Forwards LER 98-007-00,IAW 10CFR50.73(a)(2)(v).Commitments Made Listed16 December 1998Forwards LER 98-007-00,IAW 10CFR50.73(a)(2)(v).Commitments Made Listed
05000456/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed15 June 1999Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed
05000457/LER-1988-011, Withdraws LER 88-011-01 Re Reactor Shutdown as Result of Valve 2SI89089B Declared Inoperable Due to non-environ Qualified Motor.Addl Info Submitted Proved Motor Was Environ Qualified to Required Stds & No Shutdown Required17 February 1989Withdraws LER 88-011-01 Re Reactor Shutdown as Result of Valve 2SI89089B Declared Inoperable Due to non-environ Qualified Motor.Addl Info Submitted Proved Motor Was Environ Qualified to Required Stds & No Shutdown Required
05000457/LER-1997-004, Forwards LER 97-004-00 from Braidwood Generating Station IAW Requirement of 10CFR50.73(a)(2)(iv),which Requires 30-day Rept.Ler Was Originally Transmitted W/Error in Reportability Requirements of Cover Ltr Only14 November 1997Forwards LER 97-004-00 from Braidwood Generating Station IAW Requirement of 10CFR50.73(a)(2)(iv),which Requires 30-day Rept.Ler Was Originally Transmitted W/Error in Reportability Requirements of Cover Ltr Only
05000457/LER-1997-005, Forwards LER 97-005-01,supplement Rept for LER 97-005-00 Submitted on 971205,per 10CFR50.73(a)(2)(i)(B)25 March 1998Forwards LER 97-005-01,supplement Rept for LER 97-005-00 Submitted on 971205,per 10CFR50.73(a)(2)(i)(B)
05000457/LER-1998-003, Forwards LER 98-003-00 Re Unit 2 Reactor Trip.Actions & Associated Action Tracking Number That Braidwood Station Is Committed to Implement in Response to LER Described Below16 June 1999Forwards LER 98-003-00 Re Unit 2 Reactor Trip.Actions & Associated Action Tracking Number That Braidwood Station Is Committed to Implement in Response to LER Described Below
05000457/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Listed21 May 1999Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Listed
BW980057, Forwards MOR for Sept 1998 for Units 1 & 2.Original Sent & Not Available.Distribution Methods to Ascertain Difficulty Being Reviewed27 October 1998Forwards MOR for Sept 1998 for Units 1 & 2.Original Sent & Not Available.Distribution Methods to Ascertain Difficulty Being Reviewed
BW990028, Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.510 June 1999Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.5
BW990040, Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted15 July 1999Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted
BW990042, Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.716 July 1999Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.7Post Accident Monitoring
BW990045, Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr28 July 1999Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr
BW990049, Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle4 August 1999Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current CycleFuel cladding
BW990052, Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station12 August 1999Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station
BW990053, Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 213 August 1999Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 2
IA-84-175, Responds to Appeal Re Denial of FOIA Request for GE PRA for GESSAR-II Standardized Plant Design.Forwards 11 Pages from PRA Due to Court Approved Stipulation of 850718 Settlement. Info Also Available in PDR11 October 1985Responds to Appeal Re Denial of FOIA Request for GE PRA for GESSAR-II Standardized Plant Design.Forwards 11 Pages from PRA Due to Court Approved Stipulation of 850718 Settlement. Info Also Available in PDR
IA-85-412, Responds to FOIA Request for 850404 Ltr from GG Sherwood to Hl Thompson on Review of Leak-Before-Break Approach on Gessar II Docket. Forwards Document19 June 1985Responds to FOIA Request for 850404 Ltr from GG Sherwood to Hl Thompson on Review of Leak-Before-Break Approach on Gessar II Docket. Forwards Document
IA-85-777, Partially Withheld Ltr Ack Receipt of 850320 Info Re Lk Comstock Engineering Co Production Emphasis Base Metal Reduction & Inspector Qualifications at Facility.Completion of Insps Expected within Next 90 Days4 April 1985Partially Withheld Ltr Ack Receipt of 850320 Info Re Lk Comstock Engineering Co Production Emphasis Base Metal Reduction & Inspector Qualifications at Facility.Completion of Insps Expected within Next 90 Days
IA-85-804, Responds to FOIA Request for Specified Documents to Be Placed in Pdr.Encl App a Documents & Listed App B Document Placed in Pdr.Portions of Document 2 on App a Withheld (Ref FOIA Exemption 4)13 January 1986Responds to FOIA Request for Specified Documents to Be Placed in Pdr.Encl App a Documents & Listed App B Document Placed in Pdr.Portions of Document 2 on App a Withheld (Ref FOIA Exemption 4)
IA-86-821, Final Response to FOIA Request Re GESSAR-II.App a Document Available in Pdr.App B Document Partially Withheld (Ref FOIA Exemption 4)9 January 1987Final Response to FOIA Request Re GESSAR-II.App a Document Available in Pdr.App B Document Partially Withheld (Ref FOIA Exemption 4)
IA-96-463, Final Response to FOIA Request for Documents.Records Identified in App a Being Withheld in Entirety (Ref FOIA Exemption 7)9 December 1996Final Response to FOIA Request for Documents.Records Identified in App a Being Withheld in Entirety (Ref FOIA Exemption 7)
IA-97-171, Final Response to FOIA Request for Documents.Records in App a Encl & Available in Pdr.App B Records Withheld in Part (Ref FOIA Exemption 5)23 June 1997Final Response to FOIA Request for Documents.Records in App a Encl & Available in Pdr.App B Records Withheld in Part (Ref FOIA Exemption 5)
IR 05000295/199001324 August 1990Forwards Notices of Violations from Insp Repts 50-456/90-13, 50-457/90-16,50-295/90-13 & 50-304/90-15 Inadvertently Removed from Rept Package Due to Administrative Error
IR 05000401/20050033 June 1985Forwards Safety Insp Repts 50-456/85-17 & 50-457/85-18 on 850401-0503.No Noncompliance Noted
IR 05000454/198405118 June 1985Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-454/84-51 & 50-455/84-35.Review on Some Util Responses to Notice of Violation Clarified
IR 05000454/198703230 October 1987Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-454/87-32, 50-455/87-30 & 50-456/87-28.Assignment of Severity Level IV Appropriate
IR 05000454/199700917 September 1997Discusses 970911 Combined Byron/Braidwood Predecisional EC Re Apparent Violations Noted in Insp Repts 50-454/97-09, 50-455/97-09,50-456/97-09 & 50-457/97-09 Concerning ECCS Venting.Partial List of Attendees Encl
IR 05000456/197800627 November 1978Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted During Inspec 50-456/78-06 & 50-457/78-06
IR 05000456/19790154 March 1980Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-456/79-15 & 50-457/79-15
IR 05000456/198200825 April 1983Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-456/82-08 & 50-457/82-08.Request to Withdraw Violation 3 Denied. Audit Revealed 196 Drawings Missing
IR 05000456/198300913 February 1986Ack Receipt of 840706-850425 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-456/83-09 & 50-457/83-09.Bases for Concluding That Items 1.C,3.a,3.b, 3.c,4.d & 6.a Constitute Violations ProvidedNondestructive Examination
IR 05000456/19830188 June 1984Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-456/83-18 & 50-457/83-17.Suppl to Should Include Listed Items Re safety-related Cable Pulling
IR 05000456/198400513 December 1984Ack Receipt of 840810,0911 & 1102 & 19 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-456/84-05 & 50-457/84-05.Pentrameter Placement in Welds Resolved W/Acceptance of Code Case 1914Nondestructive Examination
IR 05000456/198502121 August 1986Forwards Lk Comstock QA Inspector 801112 Checklist Documenting Acceptance of 1,215 Welds Discussed in Insp Repts 50-456/85-21 & 50-457/85-22,per Intervenor 860814 Request.W/O Encl.Related Correspondence
IR 05000456/198505810 February 1986Forwards Safety Insp Repts 50-456/85-58 & 50-457/85-54 on 851202-860124.No Violations Identified
IR 05000456/198600717 April 1986Forwards Safety Insp Repts 50-456/86-07 & 50-457/86-06 on 860202-0329.Violation Re Incorrect Positioning of Safety Injection Sys Valves & Improper Application of Caution Tags Noted.No Notice of Violation IssuedHydrostatic
IR 05000456/198602524 September 1986Ack Receipt of Informing NRC of Steps Taken to Correct Noncompliance Noted in Insp Rept 50-456/86-25. Concern Expressed Re Remaining Startup Deficiency Repts That Have Potential for Undetected Nonconformances
IR 05000456/198604019 September 1986Forwards Safety Insp Rept 50-456/86-40 on 860805,07 & 19-21. No Violation Noted
IR 05000456/19860607 May 1987Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp.Item 456/86-052-01 Will Remain Violation Due to Incorrect Corrective Engineering Evaluations & Deficiencies Noted in Insp Rept 50-456/86-60
IR 05000456/19860656 April 1987Forwards 870323 Insp Repts 50-456/86-65 & 50-457/86-49, Documenting Results of Region III Investigation of Allegation RIII-86-A-0199 Received on 870114 from Applicant Contractor Employee.W/O Encl.Related Correspondence
IR 05000456/198702911 December 1987Ack Receipt of Informing NRC of Actions Taken to Correct Violations Noted in Insp Rept 50-456/87-29 & 50-457/87-27.Disagrees W/Acceptability of Manipulating Valves That Result in Different Configurations
IR 05000456/198704025 November 1987Forwards Safety Insp Repts 50-456/87-40 & 50-457/87-38 on 871026-30.No Violations Noted
IR 05000456/198800529 July 1988Notifies of 880811 Enforcement Conference in Region III Ofc to Discuss Violations Noted in Insp Repts 50-456/88-05 & 50-457/88-06.Util Should Be Prepared to Discuss Listed Items