ML12230A226
From kanterella
Revision as of 17:21, 2 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML12230A226 | |
Person / Time | |
---|---|
Site: | Braidwood |
Issue date: | 08/17/2012 |
From: | Enright D J Exelon Generation Co |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
References | |
BW120081 | |
Download: ML12230A226 (13) | |
Similar Documents at Braidwood | |
---|---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARML24241A0062024-08-28028 August 2024
[Table view]Attachment 1: Braidwood Generating Station - Form OAR-1 Owners Activity Report ML23305A0412023-11-0101 November 2023 Updated Steam Generator Tube Inspection Report RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23223A0542023-08-11011 August 2023 Attachment 1 - Braidwood Station, Unit 2: Form OAR-1 Owners Activity Report BW230019, Steam Generator Eddy Current Inspection Report Refueling Outage 23 (A1R23) - October 20222022-10-31031 October 2022 Steam Generator Eddy Current Inspection Report Refueling Outage 23 (A1R23) - October 2022 BW220019, Steam Generator Tube Inspection Report Refueling Outage 22 (A2R22)2022-04-27027 April 2022 Steam Generator Tube Inspection Report Refueling Outage 22 (A2R22) ML22031A0442022-01-31031 January 2022 Form OAR-1 Owners Activity Report BW210083, Revision to Unit 1 Inservice Inspection Summary Report2021-12-15015 December 2021 Revision to Unit 1 Inservice Inspection Summary Report ML21202A1932021-07-21021 July 2021 Owner'S Activity Report (OAR) for Refueling Outage A1R22 BW210032, Inservice Testing Program Fourth Ten Year Interval July 29, 2018- July 28, 20282021-04-28028 April 2021 Inservice Testing Program Fourth Ten Year Interval July 29, 2018- July 28, 2028 BW200095, Inservice Inspection Summary Report2020-12-0909 December 2020 Inservice Inspection Summary Report BW210002, Fourth Ten-Year Interval Inservice Testing Program Plan, Revision 32020-11-25025 November 2020 Fourth Ten-Year Interval Inservice Testing Program Plan, Revision 3 RS-20-085, Submittal of Relief Request I4R-11 for Braidwood Station, Units 1 and 2, and Relief Request I4R-18 for Byron Station, Units 1 and 2, Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2020-07-24024 July 2020 Submittal of Relief Request I4R-11 for Braidwood Station, Units 1 and 2, and Relief Request I4R-18 for Byron Station, Units 1 and 2, Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML20017A1332020-01-17017 January 2020 Inservice Inspection Summary Report NMP2L2711, Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-8792019-10-16016 October 2019 Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-879 RS-19-084, Relief Request Associated with the Third Ten-Year Lnservice Inspection Program Interval2019-08-27027 August 2019 Relief Request Associated with the Third Ten-Year Lnservice Inspection Program Interval NMP2L2700, Co. - Submittal of Proposed Alternative to Utilize Code Case N-879 for Plants2019-04-30030 April 2019 Co. - Submittal of Proposed Alternative to Utilize Code Case N-879 for Plants ML19030B0872019-01-30030 January 2019 Submittal of Inservice Inspection Summary Report ML18264A1552018-09-21021 September 2018 Fourth Ten-Year Interval Inservice Testing Program Plan, Revision 1 ML18208A2942018-07-27027 July 2018 Fourth Ten-Year Interval Inservice Testing Program Plan ML18208A3272018-07-27027 July 2018 Lnservice Inspection Summary Report ML17236A4572017-08-24024 August 2017 Steam Generator Tube Inspection Report for Refueling Outage 19 ML17244A2332017-08-18018 August 2017 Inservice Inspection Summary Report ML17058A0852017-02-27027 February 2017 Steam Generator Tube Inspection Report for Refueling Outage 19 ML17024A3982017-01-24024 January 2017 Inservice Inspection Summary Report for Refueling Outage 19 (A1R19) ML16021A0802016-01-21021 January 2016 Inservice Inspection Summary Report ML15198A1952015-07-16016 July 2015 Inservice Inspection Summary Report RS-15-155, Response to Preliminary RAI Regarding Braidwood and Byron Stations Relief Request for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations2015-05-29029 May 2015 Response to Preliminary RAI Regarding Braidwood and Byron Stations Relief Request for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations ML14318A2112014-11-14014 November 2014 Steam Generator Tube Inspection Report for Refueling Outage 17 RS-14-251, Revision to the Third 10-Year Inservice Inspection Interval Requests for Relief for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations2014-09-0808 September 2014 Revision to the Third 10-Year Inservice Inspection Interval Requests for Relief for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations ML14232A3242014-08-20020 August 2014 Inservice Inspection Summary Report ML13358A4002013-12-20020 December 2013 Inservice Inspection Summary Report for Refueling Outage 17 ML13037A5062013-02-0606 February 2013 Inservice Inspection Summary Report ML12251A3592012-08-17017 August 2012 (Returned to DCD) Braidwood Station, Unit 1, Steam Generator Tube Inspection Report for Refueling Outage 15 ML12230A2262012-08-17017 August 2012 Inservice Inspection Summary Report ML11227A2532011-08-10010 August 2011 Inservice Inspection Summary Report RS-11-069, Third 10-Year Inservice Inspection Interval Requests for Relief for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations2011-04-19019 April 2011 Third 10-Year Inservice Inspection Interval Requests for Relief for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations RS-11-050, Third 10-Year Inservice Inspection Interval Relief Request I3R-08, Alternative Requirements to ASME Section XI Appendix VII (Supplements 2 and 10), Examinations of Class 1 Pressure Retaining Welds Conducted from the Inside.2011-04-11011 April 2011 Third 10-Year Inservice Inspection Interval Relief Request I3R-08, Alternative Requirements to ASME Section XI Appendix VII (Supplements 2 and 10), Examinations of Class 1 Pressure Retaining Welds Conducted from the Inside. ML1103505122011-02-0404 February 2011 Inservice Inspection Summary Report ML1003302732010-01-27027 January 2010 Inservice Inspection Summary Report ML0921105382009-07-27027 July 2009 Submittal of Inservice Testing Program Plan for the Third Ten-Year Interval ML0920502592009-07-16016 July 2009 Fourteenth Refueling Outage Steam Generator Inservice Inspection Summary Report ML0920502512009-07-16016 July 2009 Submittal of Inservice Inspection Summary Report, Fourteenth Refueling Outage (A1R14) ML0908607152009-03-25025 March 2009 Submittal of Third Inservice Inspection (ISI) Interval Program Plan RS-08-160, Third 10-Year Inservice Inspection Interval, Relief Request 1313-01, Request for Relief for Alternate Risk-Informed Selection and Examination Criteria for Examination Category B-F, B-J, C-F-1, and C-F-2 Pressure .2008-12-10010 December 2008 Third 10-Year Inservice Inspection Interval, Relief Request 1313-01, Request for Relief for Alternate Risk-Informed Selection and Examination Criteria for Examination Category B-F, B-J, C-F-1, and C-F-2 Pressure . ML0829007072008-08-13013 August 2008 Inservice Inspection Summary Report for: Interval 2, Period 3, Outage 2 A2R13 Outage ML0802205262008-01-22022 January 2008 Inservice Inspection Summary Report ML0801804372008-01-18018 January 2008 Thirteenth Refueling Outage Steam Generator Inservice Inspection Summary Report ML0727403892007-10-17017 October 2007 Review of Twelfth Refueling Outage Steam Generator Tube Inservice Inspection Report ML0705403462007-02-23023 February 2007 Second 10-Year Inservice Inspection Interval, Relief Request I2R-48, Structural Weld Overlays on Pressurizer Spray, Relief, Safety and Surge Nozzle Safe-Ends and Associated Alternative Repair Techniques 2024-08-28 Category:Letter MONTHYEARRS-24-098, Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality2024-10-23023 October 2024
[Table view]Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality ML24291A0012024-10-17017 October 2024 Submittal of Core Operating Limits Report, Cycle 25 RS-24-095, Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals2024-10-10010 October 2024 Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A1272024-09-23023 September 2024 – Request for Additional Information (EPID 2023-LLA-0136) - Non-Proprietary IR 05000456/20240112024-09-12012 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000456/2024011 and 05000457/2024011 ML24164A0032024-09-10010 September 2024 Issuance of Amendment Nos. 235 and 235 Revision of Technical Specifications for the Ultimate Heat Sink IR 05000456/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2024005 and 05000457/2024005) ML24227A0522024-08-29029 August 2024 Audit Plan for LAR to Remove ATWS Mtc Limit ML24225A1112024-08-13013 August 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000456/20240022024-08-0808 August 2024 Integrated Inspection Report 05000456/2024002 and 05000457/2024002 ML24172A1252024-07-26026 July 2024 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2024-LLA-0075) - Transmittal Letter ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24163A3922024-06-25025 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, & Opportunity for a Hearing (EPID L-2024-LLA-0075)- Letter RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24164A2132024-06-13013 June 2024 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Braidwood Nuclear Plant RS-24-057, License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink2024-06-0404 June 2024 License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink IR 05000456/20240102024-05-31031 May 2024 License Renewal Phase 1 Report 05000456/2024010 RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24136A0132024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report ML24136A2452024-05-15015 May 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000457/2024004 ML24128A1212024-05-0707 May 2024 Response to Braidwood and Dresden FOF Dates Change Request (2025) ML24122A6522024-05-0101 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000456/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000456/2024301; 05000457/2024301 RS-24-026, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2024-04-25025 April 2024 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML24116A0052024-04-25025 April 2024 Transmittal of Braidwood Station, Unit 1, Core Operating Limits Report, Braidwood Unit 1 Cycle 25 IR 05000456/20240012024-04-24024 April 2024 Integrated Inspection Report 05000456/2024001 and 05000457/2024001 ML24113A1272024-04-22022 April 2024 Audit Plan in Support of Review of LAR Revision of TS 3.7.15, 3.7.16, and 4.3.1 (EPID: L-2023-LLA-0136) (Non-Proprietary) IR 05000457/20240902024-04-19019 April 2024 Final Significance Determination for 2b Auxiliary Feedwater Pump Diesel Engine Fuel Oil Dilution Issue - NRC Inspection Report 05000457/2024090 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-034, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-04-10010 April 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML24094A2692024-04-0303 April 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Report, WCAP-17451-P, Revision 2, Reactor Internals Guide Tube Wear Westinghouse Domestic Fleet Operational Projections RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24057A0372024-03-26026 March 2024 Proposed Alternative from Certain Requirements Contained in the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI RS-24-024, Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-22022 March 2024 Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML24067A3252024-03-0707 March 2024 U.S. Department of Energy, Office of Legacy Management, 2023 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites ML24066A0122024-03-0606 March 2024 Operator Licensing Examination Approval Braidwood Station, Units 1 and 2, March 2024 IR 05000456/20244012024-03-0505 March 2024 Cyber Security Inspection Report 05000456/2024401 and 05000457/2024401 (Public) IR 05000456/20230062024-02-28028 February 2024 Annual Assessment Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2023006 and 05000457/2023006) ML24057A3022024-02-26026 February 2024 Regulatory Conference Supplemental Information ML24047A2382024-02-20020 February 2024 Regulatory Conference to Discuss Risk Associated with 2b Auxiliary Feedwater Pump Diesel Engine Fuel Oil Leak RS-24-013, Response to Request for Additional Information Regarding Proposed Alternative to Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-02-13013 February 2024 Response to Request for Additional Information Regarding Proposed Alternative to Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators IR 05000456/20230042024-02-0202 February 2024 Integrated Inspection Report 05000456/2023004 and 05000457/2023004 2024-09-23 |
Retrieved from "https://kanterella.com/w/index.php?title=ML12230A226&oldid=448553"