ML22203A093

From kanterella
Revision as of 19:23, 2 August 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Dairyland Power Cooperative, Changes to the La Crosse Boiling Water Reactor (LACBWR) ISFSI Physical Security Plan
ML22203A093
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 07/11/2022
From: -Neednewvalue
Dairyland Power Cooperative
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
LAC-14490
Download: ML22203A093 (2)


Text

DAIRYLAND POWER COOPERATIVE July 11, 2022 10 CFR 50.54 In reply, please reference LAC-14490 DOCKET NO. 50-409 and 72-046 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

La Crosse Boiling Water Reactor Possession Only License No. DPR-45 Changes to the La Crosse Boiling Water Reactor (LACBWR) ISFSI Physical Security Plan In accordance with 10 CFR 50.54(p}(2), Dairyland Power Cooperative (DPC) is submitting the explanation of changes for the July revision of the La Crosse Boiling Water Reactor (LACBWR)

Independent Spent Fuel Storage Installation (ISFSI) Physical Security Plan (PSP) and Appendices. This revision has been determined to not decrease the safeguards effectiveness of the current security plan.

This revision is being submitted to reflect changes that will be implemented at the time of license transfer from LaCrosseSolutions to DPC. - LACBWR ISFSI Physical Security Plan Summary of Changes, contains security related information. DPC requests that the information provided in Enclosure 1 be withheld from public disclosure pursuant to 10 CFR 2.390. - Physical Security Plan along with: Appendix I Safeguards Contingency Plan and Appendix II Security Force Training & Qualification Plan. The information provided in Enclosure 2 is SAFEGUARDS INFORMATION pursuant to 10 CFR 73.21.

This document does not contain regulatory commitments.

The enclosed changes to the ISFSI PSP and PSP Appendices are being submitted prior to implementation.

Sincerely,

~o!J/

~~

Brad Smalldridge, CNO

i/f/-55 z~

BSA:CLO:tco /M55 I A Touchstone Energy" Cooperative

~~

. 3200 East Ave. S.

  • PO Box 817
  • La Crosse, WI 54602-0817
  • 608-788-4000
  • 608-787-1420 fax* W)Nw.dairylandpower.com Dairyland Power Cooperative is an equal opportunity provider and employer.

Document Control Desk Page 2 July 11, 2022

Enclosure:

1) LACBWR ISFSI Physical Security Plan Summary of Changes (Explanation of Changes to the LACBWR ISFSI PSP)

Enclosure:

2) Physical Security Plan along with: Appendix I Safeguards Contingency Plan and Appendix II Security Force Training & Qualification Plan. (Safeguards Information) cc (w/Enclosure 1) : Marlayna Doell, U.S. NRC Project Manager La Crosse Boiling Water Reactor Service List A Touchstone Energy" Cooperative ~~ ____,__

3200 East Ave. S.

  • PO Box 817
  • La Crosse, WI 54602-0817
  • 608-788-4000
  • 608-787-1420 fax* www.dairylandpower.com Dairyland Power Cooperative is an equal opportunity provider and employer.