ML20095A596
From kanterella
ML20095A596 | |
Person / Time | |
---|---|
Site: | Limerick |
Issue date: | 05/15/1984 |
From: | Hazeltine J, Faith Johnson, Roberts W WYLE LABORATORIES |
To: | |
Shared Package | |
ML20095A580 | List: |
References | |
46960-4, NUDOCS 8408210518 | |
Download: ML20095A596 (62) | |
Similar Documents at Limerick | |
---|---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217F1041999-10-14014 October 1999
[Table view]Proposed Tech Specs Pages,Revising TS Sections 2.2 & 3.0/4.0,necessary to Support Mod P000224 Which Will Install New Power Range Neutron Monitoring Sys & Incorporate long- Term thermal-hydraulic Stability Solution Hardware ML20212H5681999-09-27027 September 1999 Proposed Tech Specs Pages,Revising TS to Clarify Several Administrative Requirements,Delete Redundant Requirements & Correct Typos ML20216J3471999-09-27027 September 1999 Corrected Tech Specs Page,Modifying Appearance of TS Page 3/4 4-8 as Typo Identified in Section 3.4.3.1 ML20196F5551999-06-22022 June 1999 Proposed Tech Specs Pages to Delete Surveillance Requirement 4.4.1.1.2 & Associated TS Administrative Controls Section 6.9.1.9.h,removing Recirculation Sys MG Set Stop ML20195H0651999-06-0909 June 1999 Revised Bases Pages B 3/4 10-2 & B 3/4 2-4 for LGS Units 1 & 2,in Order to Clarify That Requirements for Reactor Enclosure Secondary Containment Apply to Extended Area Encompassing Both Reactor Enclosure & Refueling Area ML20195E7611999-06-0707 June 1999 Proposed Tech Specs Table 3.6.3-1 & Associated Notations, Reflecting Permanently Deactivated Instrument Reference Leg Isolation Valve HV-61-102 ML20195G0481999-06-0707 June 1999 Proposed Tech Specs Section 3/4.4.3, RCS Leakage,Leakage Detection Systems, Clarifying Action Statement Re Inoperative Reactor Coolant Leakage Detection Systems ML20195B8431999-05-26026 May 1999 Proposed Tech Specs Section 4.1.3.5.b,removing & Relocating Control Rod Scram Accumulators Alarm Instrumentation to UFSAR & TS Section 3.1.3.5,allowing Alternate Method for Determining Whether Control Rod Drive Pump Is Operating ML20207L6591999-03-11011 March 1999 Proposed Tech Specs Section 2.1, Safety Limits, Revising MCPR Safety Limit ML20199G2021999-01-12012 January 1999 Proposed Tech Specs Section 3/4.4.2 & TS Bases Sections B 3/4.4.2,B 3/4.5.1 & B 3/4.5.2 to Increase Allowable as-found Main Steam SRV Code Safety Function Lift Setpoint Tolerance from +1% to +3% ML20199A7271999-01-0404 January 1999 Proposed Tech Specs Revising Administrative Section of TS Re Controlled Access to High Radiation Areas & Rept Dates for Annual Ore Rept & Annual Rer Rept ML20195J1651998-11-16016 November 1998 Rev D to LGS Emergency Preparedness NUMARC Eals ML20155H6401998-10-30030 October 1998 Proposed Tech Specs Pages Revising TS SRs 4.8.4.3.b.1, 4.8.4.3.b.2 & 4.8.4.3.b.3 in Order to Reflect Relay Setpoint Calculation Methodology ML20154Q8941998-10-15015 October 1998 Proposed Tech Specs Re Addition of Special Test Exception for IST & Hydrostatic Testing ML20154L3971998-10-13013 October 1998 Revised Tech Spec Bases Pages,Clarifying Thermal Overload Operation for Motor Operated Valves with Maintained Contact Control Switches ML20151Z4721998-09-14014 September 1998 Proposed Tech Specs Revising Table 4.4.6.1.3-1,re Withdrawal Schedule for Reactor Pressure Vessel Matl Surveillance Program Capsules ML20151V0951998-09-0404 September 1998 Proposed Tech Specs Ensuring Fidelity Between TS Pages & 970324 Submittal ML20236M1221998-07-0202 July 1998 Proposed Tech Specs Change Request 96-06-0,modifying FOL Page 8 ML20217K5291998-04-24024 April 1998 Proposed Tech Specs Page 6-18a Revising MCPR Safety Limit for Lgs,Unit 1,cycle 8 ML20202G7871998-02-0909 February 1998 Proposed TS Section 2.1, Safety Limits, Revising MCPR Safety Limit.Nonproprietary Supporting Info Encl ML20199G7771998-01-27027 January 1998 Proposed Tech Specs Pages,Removing Maximum Isolation Time for HPCI Turbine Exhaust Containment Isolation Valve HV-055-1(2)F072 from TS ML20198M7861998-01-12012 January 1998 Proposed Tech Specs Table 4.4.6.1.3-1 Re Surveillance Specimen Program Evaluation for Limerick Generating Station, Unit 1 ML20203H2501997-12-31031 December 1997 Rev 19 to Odcm ML20198N8061997-12-31031 December 1997 NPDES Permit PA-0052221 Study Plan for Fecal Coliform Bacteria in Pont Pleasant Water Diversion Sys During May- Sept 1998 ML20199H5971997-11-18018 November 1997 Proposed Tech Specs Re Affected Unit 1 FOL Page 8 ML20212D1851997-10-24024 October 1997 Proposed Tech Specs Revising Section 3/4.1.3.6 to Exempt Control Rod 50-27 from Coupling Test for Remainder for Cycle 7 at LGS Unit 1,provided Certain Conditions Are Met ML20211P9471997-10-15015 October 1997 Revised MSRV Tailpipe Temp Action Plan ML20216H1101997-09-0808 September 1997 Proposed Tech Specs,Supplementing Change Request 96-06-0 by Adding Three Addl TS Pages Containing Typos Discovered Since 970225 Submittal ML20210T9231997-09-0202 September 1997 Proposed Tech Specs,Revising TS Section 4.0.5 & Bases Sections B 4.0.5 & B 3/4.4.8 Re SRs Associated W/Isi & IST of ASME Code Class 1,2 & 3 Components ML20141K9461997-05-27027 May 1997 PECO Nuclear Limerick Generating Station Unit 2 Startup Test Rept Cycle 5 ML20203H2701997-04-30030 April 1997 Rev 18 to Odcm ML20138A2311997-04-21021 April 1997 Proposed Tech Specs,Providing New Pp B 3/4 8-2a to Accomodate Overflow of Text from TS Bases Pp B 3/4 8-2 ML20137X8101997-04-0909 April 1997 Proposed Tech Specs Re Battery Specific Gravity Changes ML20137G6751997-03-24024 March 1997 Proposed Tech Specs Deleting Drywell & Suppression Chamber Purge Sys Operational Time Limit & Add SR to Ensure Purge Sys Large Supply & Exhaust Valves Are Closed as Required ML20135D0961997-02-25025 February 1997 Proposed Tech Specs Changing Corporate Name from PA Electric Co to PECO Energy Co & Removing Obsolete Info & Correcting Typos ML20133L2141997-01-15015 January 1997 Proposed Tech Specs Pp 3/4 5-5 mark-up Rev for Unit 1 Revising TS by Eliminating in-situ Functional Testing of ADS Valves Requirement as Part of start-up Testing Activities ML20135F0961996-12-0606 December 1996 Proposed Tech Specs 2.1 Re Safety Limits ML20135A4491996-11-25025 November 1996 Proposed Tech Specs Change Request 96-22-0,revising TS SR 4.8.1.1.2.e.2 & Supporting TS Bases Section 3/4.8,to Clarify Requirements Associated W/Single Load Rejection Testing of EDGs ML20134L7571996-11-0505 November 1996 Proposed Tech Specs Revising Same Pp Contained in TS Change Request 95-14-0 Re Adoption of Performance Based 10CFR50, App J,Option B Testing ML20128N7761996-09-27027 September 1996 Proposed Tech Specs 3/4.6.5 Re Secondary Containment & 4.6.5.1.1 Re Surveillance Requirements ML20116L2701996-08-0808 August 1996 Proposed Tech Specs,Revising TS Sections 3/4.3.1,3/4.3.2, 3/4.3.3 & Associated TS Bases Sections 3/4.3.1 & 3/4.3.2 to Eliminate Selected Response Time Testing Requirements ML20116H6511996-08-0505 August 1996 Proposed Tech Specs Section 2.1, Safety Limits, to Revise Min Critical Power Ratio Safety Limit ML20116E6191996-08-0101 August 1996 Proposed Tech Specs 3/4.4.6 Re Addition of Two Hydroset Curves,Effective for 6.5 & 8.5 Efpy,To Existing Ptol Curves ML20113E0491996-06-28028 June 1996 Technical Basis & Description of Approach for Review Method Selection ML20115A9111996-06-28028 June 1996 Proposed Tech Specs,Performing Containment leakage-rate Testing Per 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Option B ML20117H2621996-05-20020 May 1996 Proposed Tech Specs Sections 3/4.4.9.2,3/4.9.11.1,3/4.9.11.2 & Associated TS Bases 3/4.4.9 & 3/4.9.11 to More Clearly Described RHR Sys Shutdown Cooling Mode Operation ML20112C1691996-05-17017 May 1996 Startup Rept Cycle 7 ML20117D7801996-05-0303 May 1996 Proposed Tech Specs,Revising TS SRs to Change Surveillance Test Frequency for Performing Flow Testing of SGTS & RERS from Monthly to Quarterly ML20107M5141996-04-25025 April 1996 Proposed Tech Specs 3/4.3.7.7 Re Relocation of Traversing in-core Probe LCO ML20101L9211996-03-29029 March 1996 Proposed Tech Specs,Revising TS SR 4.5.1.d.2.b to Delete Requirement to Perform Functional Testing of ADS Valves as Part of start-up Testing Activities 1999-09-27 Category:TEST REPORT MONTHYEARML20141K9461997-05-27027 May 1997
[Table view]PECO Nuclear Limerick Generating Station Unit 2 Startup Test Rept Cycle 5 ML20112C1691996-05-17017 May 1996 Startup Rept Cycle 7 ML20083P1361995-05-18018 May 1995 PECO Energy Co Limerick Generating Station Unit 2 Startup Rept Cycle 4 ML20044H1921993-04-26026 April 1993 Primary Reactor Containment Integrated Leakage Rate Test, Final Rept ML20115A5461992-09-30030 September 1992 Rev 0 to Limerick Generating Station,Unit 1 Startup Rept, Cycle 5 ML20082M9491991-08-0101 August 1991 Startup Rept,Cycle 2 ML20066G5251990-11-30030 November 1990 Primary Reactor Containment Integrated Leakage Rate Test, Final Rept ML20246A9001989-06-30030 June 1989 Startup Rept,Cycle 3 ML20236V6241987-11-30030 November 1987 Rev 0 to Limerick Generating Station Unit 1 Startup Rept Cycle 2 ML20236S0981987-08-13013 August 1987 Reactor Containment Bldg Integrated Leakage Rate Test Final Rept ML20155A3431986-03-31031 March 1986 Rev 2 to Rept of Initial Plant Startup ML20198H8201985-12-31031 December 1985 Rev 1 to Rept of Initial Plant Startup ML20132H0021985-09-30030 September 1985 Rept of Initial Plant Startup,Dec 1984 ML20093H8291984-09-25025 September 1984 Rev 0 to Scram Discharge Vol Contaminated Piping Insp ML20093H7591984-09-15015 September 1984 Rev 0 to RHR Loop D Contaminated Piping Insp ML20093H7381984-09-15015 September 1984 Rev 0 to RHR Loop C Contaminated Piping Insp ML20093H7101984-09-15015 September 1984 Rev 0 to RHR Loop B Contaminated Piping Insp ML20093H6981984-09-15015 September 1984 Rev 0 to RHR Loop a Contaminated Piping Insp ML20093H8041984-09-0909 September 1984 Rev 0 to Core Spray Loop B Contaminated Piping Insp ML20093H8161984-09-0909 September 1984 Rev 0 to Safeguard Piping Fill Sys Contaminated Piping Insp ML20093H7851984-09-0909 September 1984 Rev 0 to Core Spray Loop a Contaminated Piping Insp ML20100G0571984-08-31031 August 1984 Primary Reactor Containment Integrated Leakage Rate Test, Final Rept ML20095A5961984-05-15015 May 1984 Test Rept on Electrical Separation Verification Testing on Terminal Blocks & Panel Meters for Limerick Generating Station Units 1 & 2 ML20090K6441984-04-20020 April 1984 Test Rept on Electrical Raceway Separation Verification Testing for Philadelphia Electric Co,Limerick Generating Station Units 1 & 2 ML20086P0641983-12-0101 December 1983 Section 5.0, Startup Addenda, to Monthly Project Status Rept ML20077N0711983-09-0101 September 1983 Nuclear Qualification Test Rept ML20077N0811983-09-0101 September 1983 Summary of Generic Qualification of Solenoid Valves ML20077N0511983-06-27027 June 1983 Static Load Test Program on 18-Inch Butterfly Valve Assembly W/Limitorque Operator ML20028B4241982-09-0101 September 1982 Design Verification Test Rept,Internal Panel Control Wiring Separation Criteria. ML20077N0961982-06-24024 June 1982 Hydrodynamic Vibration Testing (New Loads) ML20077N0901980-08-28028 August 1980 Rev 1 to Qualification of EA180 Series Limit Switches for Use in Nuclear Power Plants in Compliance W/Ieee Stds 323-1974,382-1972 & 344-1975 1997-05-27 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20095A596&oldid=2785598"