ML20141K94627 May 1997PECO Nuclear Limerick Generating Station Unit 2 Startup Test Rept Cycle 5Shutdown Margin
Stroke time
Hydrostatic
ML20112C16917 May 1996Startup Rept Cycle 7Shutdown Margin
Hydrostatic
ML20083P13618 May 1995PECO Energy Co Limerick Generating Station Unit 2 Startup Rept Cycle 4Shutdown Margin
Hydrostatic
MELLLA
ML20044H19226 April 1993Primary Reactor Containment Integrated Leakage Rate Test, Final Rept
ML20115A54630 September 1992Rev 0 to Limerick Generating Station,Unit 1 Startup Rept, Cycle 5Shutdown Margin
Ultimate heat sink
Stroke time
Hydrostatic
ML20082M9491 August 1991Startup Rept,Cycle 2Shutdown Margin
Ultimate heat sink
Stroke time
ML20066G52530 November 1990Primary Reactor Containment Integrated Leakage Rate Test, Final Rept
ML20246A90030 June 1989Startup Rept,Cycle 3Shutdown Margin
Ultimate heat sink
Stroke time
Hydrostatic
ML20236V62430 November 1987Rev 0 to Limerick Generating Station Unit 1 Startup Rept Cycle 2Shutdown Margin
Ultimate heat sink
Stroke time
Hydrostatic
ML20236S09813 August 1987Reactor Containment Bldg Integrated Leakage Rate Test Final Rept
ML20155A34331 March 1986Rev 2 to Rept of Initial Plant StartupShutdown Margin
Ultimate heat sink
Grab sample
Stroke time
Hydrostatic
Power change
ML20198H82031 December 1985Rev 1 to Rept of Initial Plant StartupShutdown Margin
Ultimate heat sink
Grab sample
Stroke time
Hydrostatic
ML20132H00230 September 1985Rept of Initial Plant Startup,Dec 1984Shutdown Margin
Ultimate heat sink
Grab sample
Stroke time
Hydrostatic
ML20093H82925 September 1984Rev 0 to Scram Discharge Vol Contaminated Piping Insp
ML20093H75915 September 1984Rev 0 to RHR Loop D Contaminated Piping Insp
ML20093H73815 September 1984Rev 0 to RHR Loop C Contaminated Piping Insp
ML20093H71015 September 1984Rev 0 to RHR Loop B Contaminated Piping Insp
ML20093H69815 September 1984Rev 0 to RHR Loop a Contaminated Piping Insp
ML20093H8049 September 1984Rev 0 to Core Spray Loop B Contaminated Piping Insp
ML20093H8169 September 1984Rev 0 to Safeguard Piping Fill Sys Contaminated Piping Insp
ML20093H7859 September 1984Rev 0 to Core Spray Loop a Contaminated Piping Insp
ML20100G05731 August 1984Primary Reactor Containment Integrated Leakage Rate Test, Final ReptPacking leak
ML20095A59615 May 1984Test Rept on Electrical Separation Verification Testing on Terminal Blocks & Panel Meters for Limerick Generating Station Units 1 & 2
ML20090K64420 April 1984Test Rept on Electrical Raceway Separation Verification Testing for Philadelphia Electric Co,Limerick Generating Station Units 1 & 2
ML20086P0641 December 1983Section 5.0, Startup Addenda, to Monthly Project Status ReptHydrostatic
ML20077N0711 September 1983Nuclear Qualification Test Rept
ML20077N0811 September 1983Summary of Generic Qualification of Solenoid Valves
ML20077N05127 June 1983Static Load Test Program on 18-Inch Butterfly Valve Assembly W/Limitorque Operator
ML20028B4241 September 1982Design Verification Test Rept,Internal Panel Control Wiring Separation Criteria.Hot Short
Safe Shutdown
Thermoset
ML20077N09624 June 1982Hydrodynamic Vibration Testing (New Loads)
ML20077N09028 August 1980Rev 1 to Qualification of EA180 Series Limit Switches for Use in Nuclear Power Plants in Compliance W/Ieee Stds 323-1974,382-1972 & 344-1975Boric Acid
Safe Shutdown Earthquake
Thermoset