MONTHYEARML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23086B9862023-03-27027 March 2023 NRR E-mail Capture - Davis-Besse, Unit No. 1 - Acceptance Review Results for Davis-Besse, Unit No. 1 - Proposed Alternative Request RP-5 ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besse's 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22090A1692022-03-30030 March 2022 Re_ Action Tracking Item 2022 SST - 335 - Tom Gurdziel, E-mail Re_ Event Number 55734 at Davis Besse, a Matter of Interpretation ML22080A2512022-03-18018 March 2022 NRR E-mail Capture - (External_Sender) ASME OM Code Case OMN-27, Alternative Requirements for Testing Category a Valves (Non- Piv/Civ) ML22055B0382022-02-24024 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Upcoming Steam Generator Tube Inservice Inspection ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 ML22045A4962022-02-14014 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Emergency Plan ML22040A1832022-02-0707 February 2022 LTR-22-0033 Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML22034A9472022-02-0303 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Revised Review Estimates for Proposed Alternative to Extend the Steam Generator Weld Inspection Interval ML22033A0632022-02-0101 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Design Basis for the Shield Building Containment Structure ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21321A3792021-11-16016 November 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML21287A0382021-10-14014 October 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Requests for Relief from Certain Inservice Testing Requirements ML21271A1332021-09-28028 September 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Proposed Alternative RR-A2 for Certain Steam Generator Weld Inspections ML21119A2152021-04-28028 April 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27 ML21041A5452021-02-10010 February 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Steam Generator Tube Inspection Reports ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20329A3832020-11-24024 November 2020 NRR E-mail Capture - Davis Besse Nuclear Power Station, Unit No. 1 - Request for an Exemption from the 2020 Force-on-Force Exercises ML20304A2842020-10-29029 October 2020 50.59 Inspection 2nd Request for Information ML20289A0992020-10-0505 October 2020 NRR E-mail Capture - Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20281A3692020-10-0505 October 2020 Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20239A7942020-08-25025 August 2020 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Incorporation of Applicable Standard in TS 5.2.2.e ML20203M3712020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 ML20203M3722020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 and Part 2 L-20-183, Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force2020-06-23023 June 2020 Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force ML20154K7642020-06-0202 June 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425 ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20058D3152020-02-27027 February 2020 Completion of License Transfer for the Beaver Valley, Davis-Besse and Perry Nuclear Units ML20024E0092020-01-23023 January 2020 NRR E-mail Capture - FENOC License Transfer - January 23, 2020 Call Summary ML20021A3162020-01-21021 January 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request to Revise Containment Leakage Rate Testing ML19346B3972019-12-11011 December 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Adopt TSTF-425 ML19273A1132019-09-27027 September 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Acceptance of License Amendment Request to Extend Containment Leakage Rate Test Interval ML19179A1382019-06-28028 June 2019 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding the Decommissioning Quality Assurance Program ML19164A1532019-06-13013 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Post-Shutdown Emergency Plan ML19162A3922019-06-11011 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML19161A2132019-06-0606 June 2019 NRR E-mail Capture - Results of Acceptance Review - FENOC Fleet - Request for Approval of Request for Approval of Lrradiated Fuel Management Plans, EPID L-2019-LRO-0016 ML19149A6202019-05-29029 May 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Approval of the Decommissioning Quality Assurance Program ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19106A2512019-04-16016 April 2019 NRR E-mail Capture - Davis-Besse - Proposed License Condition and Draft Safety Evaluation for the License Amendment Request to Adopt NFPA 805 ML19073A1112019-03-14014 March 2019 NRR E-mail Capture - Davis-Besse - Acceptance of License Amendment Request for Permanently Defueled License and Technical Specifications ML19043A6962019-02-0808 February 2019 NRR E-mail Capture - Davis-Besse License Amendment Request for the Post-Shutdown Emergency Plan ML18320A1272018-11-16016 November 2018 NRR E-mail Capture - Davis-Besse LAR to Change TS Definitions and Administrative Controls for Permanently Defueled Conditions ML18282A1482018-10-0909 October 2018 NRR E-mail Capture - Results of Acceptance Review - FENOC Fleet - Request for Exemption Related to the Suspension of Security Measures in an Emergency or During Severe Weather, EPID L-2018-LLL-0016 ML18282A2422018-10-0808 October 2018 OEDO-18-00160, FENOC Fleet, 2.206 Petition, Submission of Supplement Dated October 8, 2018, from the Petitioners - PRB and Petitioners (Elpc), Includes Email, Cover Letter from Elpc, and the Attachments to the Email 2023-05-08
[Table view] |
Text
Davis-BesseNPEm Resource From: CuadradoDeJesus, Samuel Sent: Wednesday, September 28, 2011 9:21 AM To: dorts@firstenergycorp.com; custerc@firstenergycorp.com Cc: Davis-BesseHearingFile Resource
Subject:
Davis Besse Open Items and Confirmatory Items Steve and Cliff, The tables below list the OI and CI by branch for Davis-Besse. The information in the tables include the associated reviewers, whether the issue is a CI or OI and its #, the RAI #, a note summarizing the issue and in some cases the status of the discussion and SER section. Currently, for Davis Besse we have 21 Open Items and 6 Confirmatory Items.
Tomorrow Ill meet with NRCs BCs and technical staff to discuss the status of Davis Besse OI/CI and whether or not well be able to close enough OI/CI to support the schedule. Ill inform you about the result of the meeting. Please review the tables and let me know if you have any question. Cliff, I just talk with Steve about this I called you but I couldnt reach you, Ill call you again-Thanks RASB Title Reviewers CI/OI RAI Not S&S Methodology Brogers CI RAI 2.1-3 aba OI 3.0.3.1.10- RAI B.2.22-5 (B.2.22- issu 1 OI 1) RAI B.2.22-6 ann 3.0.3.1.10-2 (B.2.22-2) RAI B.2.22-7 cav Masonry Wall Program Lehman/Istar OI 3.0.3.1.10-4 (B.2.22-4) stee OI 3.0.3.2.15- RAI B.2.39-9 (B.2.39-1) 1 OI RAI B.2.39-10 (B.2.39-2) 3.0.3.2.15-2 B.2.39-11 (B.2.39- 2/5 OI 3.0.3.2.15- 3) RAI B.2.39-12 can 3 OI (B.2.39-7) RAI B.2.40- gro 3.0.3.2.15-4 OI 1(B.2.40-2) inac 3.0.3.2.16-1 deg Structures Monitoring Program Naus/Lehman rela Also has OI 3.0.3.2.15-3 B.2.
Water Control Structures Inspection Lehman and OI 3.0.3.2.16-1 RAI B.2.40-1(B.2.40-2) of t 1
The fati rem Tele resp Containment Fatigue Analyses, TLAA ABuford/ASheikh OI 4.6-1 RAI 4.6-1 sup OI 3.5.2.12-1 closed OI 3.5.2.12-2 The Lehman/Prinaris closed RAI 3.5.2.3.12-1 RAI 3.5.2.3.12-4 inpu RARB Title Reviewers CI/OI RAI Not rega inco MHomiack OI RAI B1.4-1 ren app info the incl valv item 3.1.1-80 Reduction of Fracture Toughness Trillo/Min/Yee OI 3.1.2.2-1 RAI 3.1.2.2-3 (3.1.2.2-2) and Control Rod Drive Head Penetration Pressure Housings and Primary Side Steam Generator heads, Tube sheets, We and Welds SMin OI RAI 3.1.2.2.16-1 to t Class 1 Fatigue Oyee/CNg/Medoff OI 4.3.2.3.2-1 RAI 4.3.2.3.2-1 Clas Wa cran app Sep inpu Crane Hoist On Yee CI steel crane, fatigue analysis TLAA TLA 2
ASM 7/1 sup J-in rece Ching/Medoff CI/OI? 4.1-1 RAI 4.1-2 app RAPB Title Reviewers CI/OI RAI Not In a In LRA Table 3.2.2-2, the applicant app stated that the stainless steel piping dele components exposed to moist air pro (internal) are being managed for Tab cracking by the One-Time Inspection com Program. The AMR items cite generic XXX note H. Jklos CI 3.2.2.2.3.6-2 RAI 3.2.2.2.3.6-2 Pro NRC agin tan In LRA Table 3.3.2-14, the applicant con stated that the stainless steel heat the exchanger tubes exposed to steam to d (external) are being managed for hea reduction in heat transfer by the One- sco Time Inspection Program. The AMR can items cite generic note G. Klos/Kichline OI 3.3.2.14-1 RAI 3.3.2.14-1 sco Plea mo In LRA Table 3.2.2-2, the applicant corr stated that the stainless steel piping env components exposed to moist air plea (internal) are being managed for item cracking by the One-Time Inspection 9/21/2011 e-mail on Supplemental RAI response for 3.2.
Program. The AMR items cite generic 3.2.2.2.3.6-2. Teleconference to be scheduled env note H. JKlos also CI 3.2.2.2.3.6-2 9/29/2011. be c Exp zinc agin app Mkichline/AObodoako OI RAI 3.3.2.2.10.4-1 9/2 letd JGavula OI RAI 2.3.3.18-4(RAI 2.3.3.18-3) RAI 3
Con 8/2 sup (err Telecon (8/22/11) One Time Inspection Supplement A.1 response 8/17/11. Issues with A.1.30 and July 27 8/2 Klos/Kichline CI date(Telecon) Issu Tele upc loss of preload not id as an aging Telecon 8/2/11 on potential follow up on RAI Res effect Klos/RSun/Gavula OI 3.3.2.3.14-1 nee rega req Trea of P incl the Crit incl com rece JKlos OI RAI 3.3.2.2.5-2(3.3.2.2.5-1) (Telecon 8/29/2011) che CVIB (DCI)
Title Reviewers CI/OI RAI Not OI 3.0.3.3.6-1 OI 3.0.3.3.6-2 OI PWR Reactor vessel internals CSydnor 3.0.3.3.6-3 RAIs B.2.32-1, 2 and 3 issu CSydnor OI RAI 3.1.2.2-3 (sent 7/11/2011) issu Tab mis 9/0 JPoehler/CSydnor/Ganesh CI (9/13/2011 Teleconference) lett 4
Reactor Vessel Thermal Shock due to (Tel Borated Water Storage Tank Injection OI 4.7.3-1 RAI 4.7.3-1 nex High Pressure Injenction/Makeup Nozzle Thermal Sleeves OI 4.7.4-1 RAI 4.7.4-1 RAI OI 4.7.5.2- RAI 4.7.5.2-2 Syd 2 OI RAI 4.7.5.2- nex Inservice Inspection-Fracture 4.7.5.2-3 3 RAI 4.7.5.2-Mechanics Analyses OI 4.7.5.2-4 4 Samuel Cuadrado de Jesús Project Manager Projects Branch1 Division of License Renewal U.S. Nuclear Regulatory Commission Phone: 301-415-2946 Samuel.CuadradoDeJesus@nrc.gov 5
Hearing Identifier: Davis_BesseLicenseRenewal_Saf_NonPublic Email Number: 1586 Mail Envelope Properties (377CB97DD54F0F4FAAC7E9FD88BCA6D0805071ADA7)
Subject:
Davis Besse Open Items and Confirmatory Items Sent Date: 9/28/2011 9:20:31 AM Received Date: 9/28/2011 9:20:32 AM From: CuadradoDeJesus, Samuel Created By: Samuel.CuadradoDeJesus@nrc.gov Recipients:
"Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov>
Tracking Status: None "dorts@firstenergycorp.com" <dorts@firstenergycorp.com>
Tracking Status: None "custerc@firstenergycorp.com" <custerc@firstenergycorp.com>
Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 10813 9/28/2011 9:20:32 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: