ML073190220
From kanterella
Revision as of 21:09, 21 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML073190220 | |
Person / Time | |
---|---|
Site: | Peach Bottom, Pilgrim, Vermont Yankee, FitzPatrick File:NorthStar Vermont Yankee icon.png |
Issue date: | 11/07/2007 |
From: | Entergy Nuclear Operations, Global Nuclear Fuel |
To: | Office of Nuclear Reactor Regulation |
reeves, R NRR/DORL/LPL1-1 301-415-5239 | |
References | |
Download: ML073190220 (4) | |
Category:Meeting Briefing Package/Handouts
MONTHYEARML24270A0042024-10-0202 October 2024
[Table view]Fitpatrick Pre-submittal Meeting Slides, October 2, 2024 ML24200A2312024-07-22022 July 2024 Constellations Pre-Submittal Meeting Presentation About Peach Bottom ECCS Compensated Level System Replacement Project - July 22, 2024 ML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24134A2032024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment - Rev 0 ML24131A1282024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment ML24121A1862024-05-14014 May 2024 Attachment 3: Peach Bottom ECCS Compensated Level System Replacement Project Presentation Material (Non-Proprietary Information) ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23262B2602023-09-19019 September 2023 Slides - Constellation - Pre-Application EP 9/25/2023 Meeting Handout ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23170A0082023-06-29029 June 2023 Decommissioning Presentation for NRC Pre-submittal Meeting, June 29, 2023 ML23174A0012023-06-23023 June 2023 Pre-submittal Meeting Slides Regarding Update to the FitzPatrick Fuel Handling Accident Analysis with Impacts to Technical Specifications, June 26, 2023 ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23117A3742023-05-0202 May 2023 Northstar Lessons Learned Meeting Slides, May 2, 2023 ML23113A0232023-04-11011 April 2023 NRC Presentation: Overview of Pilgrim Liquid Discharge Considerations for the North Atlantic Right Whale Recovery Plan Northeast U.S. Implementation Team (Neit) ML23094A1492023-04-11011 April 2023 Licensee Presentation on Whr Exemption Request for Public Meeting on April 11, 2023 ML23076A0442023-03-16016 March 2023 Pb U2 Scram Barrier Presentation KT Session ML22227A0742022-08-10010 August 2022 Overview of Pilgrim Liquid Discharge Considerations NOAA ML22187A0652022-06-0808 June 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - NRC Presentation Slides ML22124A3012022-04-25025 April 2022 Dialog Presentation for Mashpee Wampanoag Tribe Regarding Pilgrim Liquid Effluent Discharges, April 25, 2022 ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21095A0162021-04-0505 April 2021 2021 RIC Session T12 - DOE-Sponsored Light Water Reactor Sustainability Program ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20168A3192020-06-15015 June 2020 Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation ML20045D1092020-01-31031 January 2020 PSP Pre-Submittal Meeting Jan 31 2020 Hdi ML19318F9512019-11-20020 November 2019 Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency ML19317C9952019-11-12012 November 2019 In-Service Testing Supplemental Position Indication Relief Request NRC Pre-Application Meeting November 18, 2019 ML19308B9262019-11-0505 November 2019 ACRS Plant License Renewal Subcommittee - Peach Bottom Atomic Power Station Units 2 and 3 Subsequent License Renewal Safety Evaluation Report (SER) with Confirmatory Item ML19256E3852019-09-12012 September 2019 SLR Dseis Public Meeting Sept 12 2019 - Scott Portzline - Former Three Mile Island Alert Presentation ML19256E3522019-09-12012 September 2019 Slides - Peach Bottom SLRA Dseis Public Meeting - Sep 12 2019 ML19248C2392019-09-11011 September 2019 NEIMA Section 108 Public Meeting Slides - Pilgrim September 11, 2019 ML19248C2302019-09-10010 September 2019 Final NEIMA Meeting Slides - Vermont Yankee ML19168A1452019-06-18018 June 2019 June 18 Public Meeting Slides (Exelon) ML19168A1692019-06-18018 June 2019 June 18 Public Meeting Slides (Exelon) ML19168A1592019-06-17017 June 2019 June 20 Public Meeting Slides (Exelon) ML19157A0542019-06-0606 June 2019 Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - NRC Presentation Slides ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19119A0882019-04-29029 April 2019 Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML19084A0982019-03-22022 March 2019 Potential Topics for Pre-Application Meetings for Peach Bottom SLRA 2024-07-22 Category:Slides and Viewgraphs MONTHYEARML24270A0042024-10-0202 October 2024
[Table view]Fitpatrick Pre-submittal Meeting Slides, October 2, 2024 ML24200A2312024-07-22022 July 2024 Constellations Pre-Submittal Meeting Presentation About Peach Bottom ECCS Compensated Level System Replacement Project - July 22, 2024 ML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24134A2032024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment - Rev 0 ML24131A1282024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment ML24121A1862024-05-14014 May 2024 Attachment 3: Peach Bottom ECCS Compensated Level System Replacement Project Presentation Material (Non-Proprietary Information) ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23262B2602023-09-19019 September 2023 Slides - Constellation - Pre-Application EP 9/25/2023 Meeting Handout ML23251A0782023-09-0606 September 2023 DRE1 Decom Pre-Submittal Slides ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23170A0082023-06-29029 June 2023 Decommissioning Presentation for NRC Pre-submittal Meeting, June 29, 2023 ML23174A0012023-06-23023 June 2023 Pre-submittal Meeting Slides Regarding Update to the FitzPatrick Fuel Handling Accident Analysis with Impacts to Technical Specifications, June 26, 2023 ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23117A3742023-05-0202 May 2023 Northstar Lessons Learned Meeting Slides, May 2, 2023 ML23094A1492023-04-11011 April 2023 Licensee Presentation on Whr Exemption Request for Public Meeting on April 11, 2023 ML23113A0232023-04-11011 April 2023 NRC Presentation: Overview of Pilgrim Liquid Discharge Considerations for the North Atlantic Right Whale Recovery Plan Northeast U.S. Implementation Team (Neit) ML23076A0442023-03-16016 March 2023 Pb U2 Scram Barrier Presentation KT Session NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML22227A0742022-08-10010 August 2022 Overview of Pilgrim Liquid Discharge Considerations NOAA ML22187A0652022-06-0808 June 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - NRC Presentation Slides ML22124A3012022-04-25025 April 2022 Dialog Presentation for Mashpee Wampanoag Tribe Regarding Pilgrim Liquid Effluent Discharges, April 25, 2022 ML22088A2172022-03-16016 March 2022 Liquid Effluent Discharge Presentation ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21162A3322021-06-11011 June 2021 BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20163A6542020-06-18018 June 2020 2020 NRC Annual Assessment Webinar Presentation - Pennsylvania and Maryland Facilities (Beaver Valley, Calvert Cliffs, Limerick, Peach Bottom, Susquehanna) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20168A3192020-06-15015 June 2020 Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation ML20161A1002020-06-0909 June 2020 James F. FitzPatrick Nuclear Power Plant - Figure 1, Current Lineup, and Figure 2, Revised Lineup, for Pre-Submittal Meeting Between NRC and Exelon for Planned License Amendment Request to Modify TS SR 3.6.1.3 - June 9, 2020 ML20157A1522020-06-0404 June 2020 Pre-Submittal Meeting Between NRC and Exelon for Planned License Amendment Request to Modify Technical Specification 3.6.1.3 Surveillance Requirement 3.6.1.3 - June 9, 2020 ML20045D1092020-01-31031 January 2020 PSP Pre-Submittal Meeting Jan 31 2020 Hdi ML19308B9262019-11-0505 November 2019 ACRS Plant License Renewal Subcommittee - Peach Bottom Atomic Power Station Units 2 and 3 Subsequent License Renewal Safety Evaluation Report (SER) with Confirmatory Item ML19256E3522019-09-12012 September 2019 Slides - Peach Bottom SLRA Dseis Public Meeting - Sep 12 2019 ML19256E3852019-09-12012 September 2019 SLR Dseis Public Meeting Sept 12 2019 - Scott Portzline - Former Three Mile Island Alert Presentation ML19248C2392019-09-11011 September 2019 NEIMA Section 108 Public Meeting Slides - Pilgrim September 11, 2019 ML19248C2302019-09-10010 September 2019 Final NEIMA Meeting Slides - Vermont Yankee ML19168A1452019-06-18018 June 2019 June 18 Public Meeting Slides (Exelon) ML19168A1692019-06-18018 June 2019 June 18 Public Meeting Slides (Exelon) ML19168A1592019-06-17017 June 2019 June 20 Public Meeting Slides (Exelon) ML19157A0542019-06-0606 June 2019 Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - NRC Presentation Slides 2024-07-22 |
Text
GNF2 Introduction at Entergy November 7, 2007 2/November 2007 Update Review Status of GNF2 Fuel LUA Programs
- P each Bottom 3
- F our LUA's in 2 nd cycle of operati on, no issues
- L UA inspection completed 3 rd Quarter 2007, no issues
- V ermont Yankee
- F our LUA's in 1 st cycle of operation, no issues
- L UA inspection planned for 4 th Quarter 2008
- KKM *F our LUA's in 3 rd cycle of operation, no issues
- L UA inspection completed 3 rd Quarter 2006 and 3 rd Quarter 2007, no issue s*GNF2 reload planned for S u mmer 2008*F o r s m a r k*F our LUA's in 1 st cycle of operations, debris fret in one bundle, rod replaced during a mid-cycle outage and bundle back in operation Licensing*N EDC-33270P, GNF2 GESTAR II Comp liance Report provided March 2007
- N EDC-33292P, GNF2 GEXL17 Corre lation provided March 2007 3/November 2007 Update Reload Plans and Schedules for FitzPatrick &
Pilgrim*F itzPatrick Reload 18, GNF2 full reload-Fall 2008
- P arallel GE14 and GNF2 preliminar y designs completed October 2007
- GNF2 final core design complete 4 th Quarter 2007
- N ew Fuel Introduction Repor t complete August 2008
- F uel fabrication begins February 2008
- P ossibl e Safety Limit LAR, March 2008
- P ilgrim Reload 17, GNF2 full reload-Spring 2009
- C ore design complete 3 rd Quarter 2008
- N ew Fuel Introduction Report Complete 1 st Quarter 2009
- P ossibl e Safety Limit LAR, October 2008 4/November 2007 Update New Fuel Introduction Scope of Work for FitzPatrick
- F itzPatrick Ne w Fuel Introduction
- T ransient Analysis
- S eismi c Analysis*L O C A*S t a bility *P er GESTARII Compliance Report & Plant Specific Licensing Basis
- S cheduled for completion August 2008
Retrieved from "https://kanterella.com/w/index.php?title=ML073190220&oldid=1120816"