ML12236A305

From kanterella
Revision as of 22:52, 1 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
09/11/2012 Notice of Meeting with OPPD to Discuss the Status of Fort Calhoun Station Performance Improvement Activities
ML12236A305
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/23/2012
From:
NRC Region 4
To:
References
Download: ML12236A305 (3)


Text

August 23, 2012

SUBJECT:

PUBLIC MEETING NOTICE

LICENSEE: Omaha Public Power District (OPPD)

FACILITY: Fort Calhoun Station

DOCKET: 50-285 DATE AND TIME: September 11, 2012 6:00 p.m. - 9:00 p.m. (CDT)

LOCATION: Dana College, Gardner-Hawks Center (gymnasium) 2848 College Dr Blair, Nebraska 68008 PURPOSE: The U.S. Nuclear Regulatory Commission (NRC) will meet with OPPD to discuss the status of Fort Calhoun Station's performance improvement activities, including status of actions described in the June 11, 2012 Confirmatory Action Letter.

CATEGORY: This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

NRC ATTENDEES: Tony Vegel, Director, Division of Nuclear Material Safety, Region IV and Inspection Manual Chapter 350 Chairman John Lubinski, Deputy Director, Office of Nuclear Reactor Regulation, Division of Inspection and Regional Support John Kirkland, Senior Resident Inspector, Fort Calhoun Station Jeff Clark, Chief, Division of Reactor Projects, Branch F Michael Hay, Chief, Division of Reactor Safety, Plant Support Branch 1 OPPD ATTENDEES: Lou Cortopassi, Site Vice President Mike Prospero, Plant Manager Ron Short, Recovery Manager

MEETING CONTACT: Jeff Clark (817) 200-1147 UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511 Omaha Public Power District Documents related to the meeting are posted on the website devoted to the special oversight at Fort Calhoun Station, available at: http://www.nrc.gov/info-finder/reactor/fcs/special-oversight.html

. The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format(e.g. braille, large print), please notify the NRC's meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room page of the NRC's public web site at: http://www.nrc.gov/readingrm/adams.html. To receive a summary of future meetings and other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

Omaha Public Power District Electronic distribution by RIV

NRC Attendees PMNS Resource, Meeting Announcement Coordinator Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov) MC0350 Chairman (Anton.Vegel@nrc.gov)

MC0350 Vice-Chairman (John.Lubinski@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov) Acting DRP Deputy Director (Allen.Howe@nrc.gov) Acting DRS Director (Tom.Blount@nrc.gov) Acting DRS Deputy Director (Patrick.Louden@nrc.gov)

Senior Resident Inspector (John.Kirkland@nrc.gov) Resident Inspector (Jacob.Wingebach@nrc.gov) Branch Chief, DRP/F (Jeff.Clark@nrc.gov) Senior Project Engineer, DRP/F (Rick.Deese@nrc.gov) Project Engineer, DRP/F (Chris.Smith@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov)

Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov) Project Manager (Lynnea.Wilkins@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) RIV Senior Enforcement Coordinator (Rachel.Browder@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource RIV/ETA: OEDO (Silas.Kennedy@nrc.gov) DRS/TSB STA (Dale.Powers@nrc.gov) MC 0350 Panel Member (Michael.Balazik@nrc.gov)

MC 0350 Panel Member (Michael.Markley@nrc.gov) MC 0350 Panel Member (Kelly.Clayton@nrc.gov)

R:\_REACTORS\2012\FC MN 9-11-2012.docx ADAMS: No Yes SUNSI Review Complete Reviewer Initials:

Publicly Available Non-Sensitive Category A. Non-publicly Available Sensitive KEYWORD: 0350 C: PBF PAO D:DRP IMC 350 Chair JClark VDricks KKennedy TVegel /KClayton for/ /RHannah for/ /RA/ /RA/ 8/22/12 8/23/12 8/22/12 8/23/12 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax