Notification of NRC Initial Operator Licensing Examination 05000483/2015301
ML15033A195
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/02/2015
From: Vincent Gaddy
Operations Branch IV
To: Diya F
Union Electric Co
Gaddy V
References
IR 2015001
Download: ML15033A195 (4)


See also: IR 05000483/2015301

Text

February 2, 2015

Mr. Fadi Diya, Senior Vice President

and Chief Nuclear Officer

Union Electric Company

P.O. Box 620 Fulton, MO 65251

SUBJECT: CALLAWAY PLANT - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000483/2015301

Dear Mr. Diya:

In a telephone conversation on January 28, 2015, between Messrs. Phillip Swan, Examination

Developer, and Stephen Garchow, Nuclear Regulatory Commission (NRC) Chief Examiner,

arrangements were made for the administration of a licensing retake examination consisting of the Senior Operator portion of the written examination at the Callaway Plant on May 18, 2015.

As agreed during the telephone conversation, the Nuclear Regulatory Commission will provide

written outlines, and your staff will prepare the examinations based on the guidelines in

NUREG-1021, "Operator Licensing Examination Standar

ds for Power Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant

Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examination is administered.

The draft Senior Operator written examination and supporting reference materials identified in

Attachment 3 to ES-201 will be due by April 6, 2015, and final examination materials will be due by April 27, 2015. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee, shall approve the examinations before it is submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or

safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examinations, and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the examination is being administered.

To permit timely NRC review and evaluation, your staff should submit the preliminary license application, (Office of Management and Budget (OMB) approval number 3150-0090), medical certification (OMB approval number 3150-0024), and waiver requests (OMB approval

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511

F. Diya - 2 -

number 3150-0090) at least 30 days before the examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least

14 days before the first examination date.

This letter contains information collections that are subject to the

Paperwork Reduction Act

of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018. The public reporting burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions,

gathering and maintaining the data needed, and completing and reviewing the collection of

information. Send comments regarding this burden estimate or any other aspect of these

information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Thank you for your cooperation in this matter. Mr. Swan has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Garchow at 817-200-1426, or myself at

817-200-1159.

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch Division of Reactor Safety

Docket: 50-483 License: NPF-30

Distribution to Callaway Plant

F. Diya - 2 -

number 3150-0090) at least 30 days before the examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the

Paperwork Reduction Act

of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018. The public reporting burden for this collection of information is

estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these

information collections, including suggestions for reducing the burden, to the Records and

FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington,

DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Swan has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Garchow at 817-200-1426, or myself at

817-200-1159.

Sincerely,

/RA/ Vincent G. Gaddy, Chief

Operations Branch Division of Reactor Safety

Docket: 50-483

License: NPF-30

Distribution to Callaway Plant

DISTRIBUTION

See next page

R:\_REACTORS\_CW\2015\CW 2015301 RFI-smg.docx ADAMS ACCENSSION NUMBER: ML15033A195 SUNSI Review By: SMG ADAMS: Yes No Sensitive Non-Sensitive Non-Publicly Available Publicly Available Keyword NRC-002 OFFICE SOE:OB C:OB NAME SGarchow VGaddy SIGNATURE /RA/ /RA/ DATE 02/02/15 02/02/15 OFFICIAL RECORD COPY

Letter to Fadi Diya from Vincent Gaddy, dated February 2, 2015

SUBJECT: CALLAWAY PLANT - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000483/2015301

Distribution

Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Thomas.Hartman@nrc.gov) Resident Inspector (Mike.Langelier@nrc.gov)

Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)

CW Administrative Assistant (Dawn.Yancey@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Fred.Lyon@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Michael.Waters@nrc.gov)