ML070470244

From kanterella
Revision as of 13:44, 10 February 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Marad, Withholding from Public Disclosure, Consolidated Security Discussion (Attachment a) to License Amendment Request 13, from Public Disclosure
ML070470244
Person / Time
Site: NS Savannah
Issue date: 03/06/2007
From: Buckley J T
NRC/FSME/DWMEP/DURLD/RDB
To: Koehler E W
US Dept of Transportation, Maritime Admin
Buckley J T
References
Download: ML070470244 (4)


Text

March 6, 2007Mr. Erhard W. KoehlerSenior Technical Advisor, N.S. SAVANNAH Office of Ship Operations U.S. Maritime Administration 400 Seventh St., S.W.

Washington, DC 20590

SUBJECT:

U. S. DEPARTMENT OF TRANSPORTATION, MARITIME ADMINISTRATIONREQUEST TO WITHHOLD CONSOLIDATED SECURITY DISCUSSION (ATTACHMENT A) TO LICENSE AMENDMENT REQUEST 13, FROM PUBLIC DISCLOSURE

Dear Mr. Koehler:

On August 7, 2006, the U.S. Department of Transportation (DOT), Maritime Administration(MARAD) submitted a request to amend License No. NS-1 for the N.S. SAVANNAH. The license amendment request included two attachments. Attachment A provided a summary of the security considerations supporting three of the five proposed Technical Specification changes. MARAD requested that the U.S. Nuclear Regulatory Commission (NRC) withhold Attachment A from public disclosure as confidential material in accordance with 10 CFR 2.390.MARAD's request to withhold Attachment A from public disclosure is accompanied by anaffidavit that: (1) identifies the document to be withheld; (2) identifies the official position of the Senior Technical Advisor and Manager, N.S. SAVANNAH Programs; (3) declares the basis for proposing the information to be withheld; (4) includes a specific statement of the harm that would result if the information to be withheld is disclosed to the public; and (5) indicates the location in the document of all information sought to be withheld.The staff has reviewed MARAD's request to withhold Attachment A from public disclosure anddetermined that: (1) the consolidated discussion of security issues contained in Attachment A has been held in confidence; (2) the consolidated discussion of security issues is the type of information normally held in confidence by MARAD; (3) Attachment A was transmitted to and received by the NRC in confidence; and (4) there is no single document available to the public which contains the consolidated discussion of security issues for the N.S. SAVANNAH. Therefore, Attachment A, marked as confidential, will be withheld from public disclosurepursuant to 10 CFR 2.390(b(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public disclosure shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.

E. Koehler-2-If the basis for withholding this information from public disclosure should change in the futuresuch that the information could then be made available for public disclosure, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified of the date of public disclosure, in advance which will be a reasonable time thereafter.

Sincerely,/RA/John Buckley, SeniorProject ManagerReactor Decommissioning Branch Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs

Docket No.: 50-238License No.: NS-1cc: NS Savannah Service List E. Koehler-2-If the basis for withholding this information from public disclosure should change in the futuresuch that the information could then be made available for public disclosure, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified of the date of public disclosure, in advance which will be a reasonable time thereafter.

Sincerely,/RA/John Buckley, SeniorProject ManagerReactor Decommissioning Branch Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs

Docket No.: 50-238License No.: NS-1cc: NS Savannah Service ListDISTRIBUTION

DURLD r/fRidsRgn1MailCenterML070470244OFFICEDWMEP:PMDWMEP:LAOGCDWMEP:BCNAMEJBuckleyTMixonFCameronCCraig DATE 2/26/07 2/26/07 2/28/07 3/6/07 OFFICIAL RECORD COPY cc: NS Savannah River Service ListMr. David S. Breeden, Jr.Chief, Safety Office Humphreys Engineer Center Support Activity Casey Building, Room 112 7701 Telegraph Road Alexandria, VA 22315-6034Mr. Michael F. BagleyFleet Superintendent James River Reserve Fleet Drawer "C" Fort Eustis, VA 23604Mr. Robert RohrFleet Operations and Maintenance Officer James River Reserve Fleet Drawer "C" Fort Eustis, VA 23604