04/21/2010, Notice of Meeting with Dominion Energy Kewaunee, Inc., to Discuss Nrc'S End-of-Cycle Assessment, Enhancing Public Participation in NRC Meetings, Effective 05/28/02
ML100840448
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 03/25/2010
From: Kunowski M A
NRC/RGN-III/DRP/B5
To:
References
Download: ML100840448 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 March 25, 2010 NOTICE OF SIGNIFICANT LICENSEE MEETING

Name of Licensee: Dominion Energy Kewaunee, Inc.

Name of Facility: Kewaunee Power Station Docket No: 50-305

Time and Date: Wednesday, April 21, 2010, 6:00 p.m. (CDT)

Location: Kewaunee Municipal Building Council Chamber Conference Room 401 5 th Street Kewaunee, WI 54216 Purpose: Discuss the NRC's End-of-Cycle assessment of Kewaunee's performance for 2009. The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, www.nrc.gov, and contains information regarding visitors and security.

Meeting Category: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

NRC Attendees

M. Kunowski, Chief, DRP Branch 5 K. Barclay, Acting Senior Resident Inspector R. Krsek, Senior Resident Inspector Others as assigned Licensee Attendees
S. Scace, Site Vice-President Others as assigned

Notice of Significant Licensee Meeting

Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Michael Kunowski at (630) 829-9618 by close of business on Friday, April 16, 2010.

Seating may be limited and will be available on a first-come basis. Inform the NRC meeting contact of your intention to attend by April 16, 2010. This step will ensure that sufficient copies of meeting materials are available.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcription or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determination on requests for reasonable accommodation will be made on a case-by-case basis.

Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, confirm the meeting schedule.

The End-of-Cycle assessment letter can be found at Accession Number ML100610349 in ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Approved By: /RA/ Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Meeting Contact: Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects (630) 829-9618 Michael.Kunowski@nrc.gov

Notice of Significant Licensee Meeting Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Michael Kunowski at (630) 829-9618 by close of business on Friday, April 16, 2010.

Seating may be limited and will be available on a first-come basis. Inform the NRC meeting contact of your intention to attend by April 16, 2010. This step will ensure that sufficient copies of meeting materials are available.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcription or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determination on requests for reasonable accommodation will be made on a case-by-case basis.

Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, confirm the meeting schedule.

The End-of-Cycle assessment letter can be found at Accession Number ML100610349 in ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Approved By: /RA/ Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects

Meeting Contact: Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects (630) 829-9618 Michael.Kunowski@nrc.gov DOCUMENT NAME: G:\Branch TSS\ALL EOC\EOC CY 2009\EOC letters\EOC Meeting Notices\2009 KEW EOC Notice of Meeting.doc

G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME MKunowski:cs

DATE 03/25/10 OFFICIAL RECORD COPY Notice of Significant Licensee Meeting Distribution

Susan Bagley, Region III Coordinator, OEDO Robert Nelson, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee Steven West, Director, Division of Reactor Projects, RIII Gary Shear, Deputy Director, Division of Reactor Projects, RIII Anne Boland, Director, Division of Reactor Safety, RIII Kenneth O'Brien, Deputy Director, Division of Reactor Safety, RIII Michael Kunowski, DRP Branch Chief Kevin Barclay, Acting SRI, Kewaunee Robert Krsek, SRI, Kewaunee DRS Branch Chiefs: Robert Daley David Hills Eric Duncan AnnMarie Stone Billy Dickson Hironori Peterson Allan Barker, Regional State Liaison Officer, RIII PMNS Viktoria Mitlyng, RIII Public Affairs Prema Chandrathil Tammy Tomczak, ORA Patricia Buckley, ORA Margaret Bucholz, DRP