|
---|
Category:Inspection Plan
MONTHYEARML22027A3642022-01-26026 January 2022 KPS: CY2022 Inspection Plan, Docket No. 05000305, License No. DPR-43 ML17354A9382017-12-20020 December 2017 CY2018 Master Inspection Plan ML16356A6032016-12-21021 December 2016 Master Inspection Plan Calendar Year 2017 ML15357A1902015-12-21021 December 2015 Master Inspection Plan - Calendar Year 2016 ML14353A4082014-12-18018 December 2014 Master Inspection Plan - Calendar Year 2015 IR 05000305/20120012013-03-0404 March 2013 Annual Assessment Letter for Kewaunee Power Station (Report 05000305/2012001) ML12277A1642012-09-27027 September 2012 Response to Request for Additional Information on Reactor Vessel Internals Inspection Plan Review Request ML12249A4192012-09-0404 September 2012 Mid-Cycle Assessment Letter for Kewaunee Power Station IR 05000305/20110062011-09-0101 September 2011 Mid-Cycle Letter for Kewaunee Power Station; 05000305-11-006 IR 05000305/20110012011-03-0404 March 2011 Annual Assessment Letter for Kewaunee Power Station (05000305-11-001) ML1024400582010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Kewaunee Power Station IR 05000305/20100012010-03-0303 March 2010 Kewaunee Power Station EOC Annual Assessment Letter (Report 05000305-10-001) ML0924402722009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan IR 05000305/20090012009-03-0404 March 2009 Annual Assessment Letter, Kewaunee (IR 05000305-09-001) ML0824602762008-09-0202 September 2008 Kewaunee - Mid-Cycle Performance Review and Inspection Plan ML0735403332007-12-19019 December 2007 Change to the Inspection Plan 1/1/08 - 12/31/08 ML0724304312007-08-31031 August 2007 8/31/07 Kewaunee - Mid-Cycle Performance Review and Inspection Plan ML0707103942007-03-12012 March 2007 Document Request Letter for PI&R Inspection IR 05000305/20070012007-03-0202 March 2007 EOC Annual Assessment Letter (Report 05000305-07-001) ML0705701322007-01-18018 January 2007 Inspection Plan Kewaunee IR 05000305-07-006 (DRS) ML0703102502007-01-18018 January 2007 IR 05000305-07-006, Kewaunee Power, Inspection Plan ML0624303402006-08-31031 August 2006 Mid-Cycle Performance Review and Inspection Plan IR 05000305/20060012006-03-0202 March 2006 (EOC) Annual Assessment Letter (Report 05000305/2006001) ML0524202512005-08-30030 August 2005 Mid-Cycle Performance Review and Inspection Plan - Kewaunee Power Station ML0506204232005-03-0202 March 2005 Annual Assessment Letter - Kewaunee, 03/02/05 ML0424505152004-08-30030 August 2004 Mid-cycle Performance Review and Inspection Plan - Kewaunee Nuclear Power Plant ML0406411582004-03-0404 March 2004 End-of-Cycle Letter IR 05000305/20040012003-08-27027 August 2003 IR 05000305-04-001 - Mid-Cycle Assessment Letter IR 05000305/20030012003-03-0404 March 2003 Annual Assessment Letter - Kewaunee (Report 05000305-03-001) ML0224002262002-08-22022 August 2002 Mid-Cycle Performance Review and Inspection Plan - Kewaunee Nuclear Power Plant (August 22, 2002) IR 05000305/20020012002-03-0404 March 2002 Annual Assessment Letter - Kewaunee Nuclear Plant (Report 50-305/02-01) 2022-01-26
[Table view] Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000305/20240022024-08-22022 August 2024 NRC Inspection Report 05000305/2024002 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24136A1952024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report ML24130A0022024-05-0909 May 2024 Summary of Facility Changes, Tests and Experiments and Commitment Changes IR 05000305/20240012024-05-0202 May 2024 NRC Inspection Report No. 05000305/2024001 ML24121A2472024-04-29029 April 2024 And Three Mile Island, Unit 2 - 2023 Occupational Radiation Exposure Annual Report ML24101A0422024-04-22022 April 2024 Solutions Inc. – Exemption from Select Requirements of 10 CFR Part 73 ((Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24106A0492024-04-15015 April 2024 2023 Annual Radioactive Effluent Release Report ML24080A0702024-03-20020 March 2024 Decommissioning Trust Fund Annual Report ML24079A0162024-03-19019 March 2024 Annual Property Insurance Status Report ML24073A2312024-03-13013 March 2024 And Three Mile Island Nuclear Station, Unit 2 - Management Change ML24061A0202024-02-15015 February 2024 (Ksp) ISFSI, Submittal of Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 6 ML23339A1332024-01-26026 January 2024 Exemption from the Req of 10 CFR Part 50.82(a)(8)(i)(A) to Use the Kewaunee Decommissioning Trust Fund for the Management of Site Restoration Activities IR 05000305/20230022023-12-27027 December 2023 NRC Inspection Report 05000305/2023002 (Drss); 07200064/2023001 (Drss) ML23332A1922023-11-28028 November 2023 Solutions, Inc., Request for Exemptions from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23278A1002023-10-0505 October 2023 Response to Request for Additional Information (RAI) Application for Kewaunee Solutions (Ks) Site Restoration Activities ML23222A1522023-08-29029 August 2023 Letter RAI KPS Exemption Site Restoration Final Repaired IR 05000305/20230012023-08-17017 August 2023 NRC Inspection Report No. 05000305/2023001-Kewaunee Power Station ML23171B0822023-07-0505 July 2023 Letter - Kewaunee Power Station - Issuance of Exemption from Certain Requirements from 10 CFR Part 20, Appendix G, Section Iii.E ML23132A0012023-05-11011 May 2023 2022 Annual Radiological Environmental Operating Report ML23116A2182023-04-26026 April 2023 2022 Annual Radioactive Effluent Release Report ML23089A3042023-03-30030 March 2023 Decommissioning Fund Status Report ML23088A2752023-03-29029 March 2023 Solutions, Inc., Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML23093A0312023-03-29029 March 2023 Solutions, Inc., Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) for Site Restoration Activities ML23087A0292023-03-27027 March 2023 2022 Annual Report of Occupational Radiation Exposure ML23087A0402023-03-27027 March 2023 Annual Property Insurance Status Report ML23066A3232023-03-0707 March 2023 Energysolutions, LLC, Notification of Closing of Transaction ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23024A0122023-01-26026 January 2023 Letter to Energysolutions Transmitting Threshold Determination for Merger/Restructuring IR 05000305/20220022023-01-0303 January 2023 NRC Inspection Report Nos. 05000305/2022002(DRSS) – Kewaunee Power Station ML22292A2302022-11-25025 November 2022 U.S. Nuclear Regulatory Commission’S Analysis of Dominion Energy Kewaunee‘S Decommissioning Funding Status Report for Kewaunee Power Station, Docket No. 50-305 ML22290A0052022-10-13013 October 2022 Resubmittal of Kewaunee Power Station Independent Spent Fuel Storage Installation (ISFSI) Only Emergency Plan (Ioep) and IOEP- Emergency Action Level (EAL) Basis Document, Revision 0KS ML24061A0182022-08-25025 August 2022 (Ksp) ISFSI Submittal of Security Pla11, Training and Qualification Plan and Safeguards Contingency Plan Revision 5 ML22241A0302022-08-25025 August 2022 (Ksp) ISFSI Submittal of Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 5 IR 05000305/20220012022-08-0101 August 2022 NRC Inspection Report Nos. 05000305/2022001(DNMS) - Kewaunee Power Station ML22215A1512022-07-27027 July 2022 Executed Financial Assurance Instruments for the Kewaunee License Transfer License No. DPR-43 (Docket Nos. 50-305, 72-64) ML22209A1252022-07-26026 July 2022 Amendment No. 11 to Indemnity Agreement No. B-53 for Kewaunee Power Station (KPS) - Signed by Kewaunee Solutions, Inc ML22175A1132022-06-30030 June 2022 Solutions, Inc. - Letter for Review and Acceptance of the Energysolutions, LLC Decommissioning Quality Assurance Program with Enclosure ML22160A5262022-06-28028 June 2022 Letter - KPS - Issuance of Conforming License Amendment Regarding Indirect Transfer of License from DEK, Inc. to Kewaunee Solutions, Inc ML22160A5282022-06-28028 June 2022 Enclosure 2 - Amendment No. 11 to Indemnity Agreement B-53 ML22160A5272022-06-28028 June 2022 Enclosure 1 - Amendment No. 221 to Renewed Facility Operating License No. DPR-43 ML22188A0812022-06-23023 June 2022 ISFSI, Virgil C. Summer Nuclear Station, Unit 1 & ISFSI, North Anna Power Station, Units 1 & 2 & ISFSI, Surry Power Station, Units 1 & 2 & ISFSI - Submission of Revision 32 of the Quality Assurance Topical Report ML22172A2452022-06-22022 June 2022 Notification of Planned Closing Date and Required Regulatory Approvals for the Kewaunee License Transfer Transaction ML22175A0662022-06-17017 June 2022 Designation of Additional Reviewing Official for ISFSI and 10 CFR Part 37 Program Security Background Investigations ML22166A3392022-06-13013 June 2022 Notification of Nuclear Insurance ML22138A2552022-05-10010 May 2022 Submittal of 2021 Annual Radiological Environmental Operating Report ML22158A2112022-05-10010 May 2022 Summary of Facility Changes, Tests and Experiments and Summary of Commitment Changes ML22091A1892022-04-0101 April 2022 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report ML22108A0352022-04-0101 April 2022 License Transfer to Kewaunee Solutions, Inc 2024-09-18
[Table view] |
Text
UNITED STATES rch 3, 2010
SUBJECT:
ANNUAL ASSESSMENT LETTER - KEWAUNEE POWER STATION (05000305/2010001)
Dear Mr. Heacock:
On February 10, 2010, the NRC staff completed its performance review of Kewaunee Power Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information.
A separate letter designated and marked as "Official Use Only -- Security Information" will include the security cornerstone review and resultant inspection plan.
Overall, Kewaunee Power Station operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
While plant performance for the most recent quarter is within the Licensee Response column of the Action Matrix, there was a safety-significant inspection finding affecting the first two quarters of the assessment cycle. This was a White inspection finding in the third quarter of 2008 for two Emergency Action Levels containing incorrect setpoint values for declaring Alert emergencies.
The agency completed a supplemental 95001 inspection on June 29, 2009, to review the corrective actions for the finding. The inspection revealed no additional findings of safety significance and closed the White Emergency Preparedness inspection finding. Kewaunee Power Station returned to the Licensee Response column in the third quarter of 2009.
The enclosed inspection plan details the inspections, less those related to security, scheduled through June 30, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.
Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle review. In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Michael Kunowski, the Branch Chief for Kewaunee, at (630) 829-9618, with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Steven West, Director Division of Reactor Projects Docket No. 50-305 License No. DPR-43 Enclosure: Kewaunee Inspection/Activity Plan cc w/encl: Distribution via ListServe