ML14232A739
ML14232A739 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 08/20/2014 |
From: | Nadeau J J Entergy Operations |
To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
References | |
GNRO-2014-00061 | |
Download: ML14232A739 (2) | |
Similar Documents at Grand Gulf | |
---|---|
Category:Report
MONTHYEARML24235A0832024-08-22022 August 2024
[Table view]Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23270B1892023-09-27027 September 2023 Evacuation Time Estimate Study ML22011A2982022-01-11011 January 2022 ANS Evaluation Report CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L ML21272A3032021-09-30030 September 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Westinghouse Evinci; Micro-Reactor Tabletop Exercise Report ML21237A0512021-08-25025 August 2021 Follow-on Risk Informed Performance Based Implementation Guidance Needed for Advanced Non-Light Water Reactors ML21081A1922021-06-30030 June 2021 Enclosure - USNRC-CNSC Joint Report Concerning X-Energy's Reactor Pressure Vessel Construction Code Assessment GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 20202021-04-19019 April 2021 Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 ML21272A3382021-04-0101 April 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Versatile Test Reactor Ticap Tabletop Exercise Report ML21090A0332021-03-31031 March 2021 Historical Context and Perspective on Allowable Stresses and Design Parameters in ASME Section III, Division 5, Subsection Hb, Subpart B (ANL/AMD-21/1) ML21083A1362021-03-23023 March 2021 Completed Activities ML21083A1442021-03-22022 March 2021 Strategy 6 ML21083A1422021-03-22022 March 2021 Strategy 4 ML21083A1432021-03-22022 March 2021 Strategy 5 ML21083A1382021-03-22022 March 2021 Rulemaking ML21083A1412021-03-22022 March 2021 Strategy 3 ML21083A1392021-03-22022 March 2021 Strategy 1 ML21083A1402021-03-22022 March 2021 Strategy 2 ML21083A1372021-03-22022 March 2021 NEIMA Reporting ML21014A2672021-01-14014 January 2021 Preapplication Engagement to Optimize Application Reviews January 12 Version - Copy ML21075A2752020-12-22022 December 2020 FAQ 20-06 GGNS Scram - Final Approved ML18123A3142018-05-0707 May 2018 Staff Assessment of Flooding Focused Evaluation (CAC No. MF9897; EPID L-2017-JLD-0015) ML18085A5792018-03-26026 March 2018 Proposed Revision of Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals ML17290B1372017-10-17017 October 2017 Recommendations for Future Inspection - Replacement Steam Dryer. with GE Hitachi Nuclear Energy Report 0000-0125-6316-R2-NP GNRO-2017/00042, Report Pursuant to 10 CFR 71.95 (a)(3) and (B) of Seven Potential Instances of Noncompliance with Certificate of Compliance No. 9233 for TN-RAM Package2017-07-12012 July 2017 Report Pursuant to 10 CFR 71.95 (a)(3) and (B) of Seven Potential Instances of Noncompliance with Certificate of Compliance No. 9233 for TN-RAM Package GNRO-2017/00038, Focused Evaluation of External Flooding2017-06-27027 June 2017 Focused Evaluation of External Flooding GNRO-2016/00053, Mitigating Strategies Assessment (MSA) for Flooding Submittal2016-12-30030 December 2016 Mitigating Strategies Assessment (MSA) for Flooding Submittal GNRO-2016/00046, Report of 10CFR50.59 Evaluations and Commitment Change Evaluations for the Period July 1, 2014 Through June 30, 20162016-08-23023 August 2016 Report of 10CFR50.59 Evaluations and Commitment Change Evaluations for the Period July 1, 2014 Through June 30, 2016 GNRO-2016/00015, Non-Proprietary Version of MP Machinery and Testing, LLC (Mpm) Proprietary Report 814779, Revs 1 & 2, Neutron Transport Analysis for Grand Gulf Nuclear Station, Previously Included in Letters GNRO-2014/0080 and GNRO-2015/000112016-03-23023 March 2016 Non-Proprietary Version of MP Machinery and Testing, LLC (Mpm) Proprietary Report 814779, Revs 1 & 2, Neutron Transport Analysis for Grand Gulf Nuclear Station, Previously Included in Letters GNRO-2014/0080 and GNRO-2015/00011 ML15259A3422015-08-24024 August 2015 10 CFR 71.95 Report Evaluation Form; Submitted by Fenok, Erwin Resin Solutions, North Anna Power Stations, Et Al GNRO-2014/00072, 2014 Report of Changes and Errors to 10CFR50.462014-11-12012 November 2014 2014 Report of Changes and Errors to 10CFR50.46 GNRO-2014/00060, Entergy'S Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-08-26026 August 2014 Entergy'S Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML14232A7392014-08-20020 August 2014 Report of 10CFR72.48 Evaluations - July 1, 2012 Through June 30, 2014 ML14098A1752014-05-0101 May 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident GNRO-2014/00027, Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi.2014-03-31031 March 2014 Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi. ML14007A7182014-02-19019 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14042A2972014-02-12012 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Grand Gulf Nuclear Station, Unit 1, TAC No.: MF0954 ML13217A0532013-07-24024 July 2013 Summary of Root Cause Evaluation - Apparent Violation of 10CFR54.13 for Grand Gulf License Renewal GNRO-2013/00020, Required Response 2 for Near-Term Task Force Recommendation 2.1: Flooding - Hazard Reevaluation Report2013-03-11011 March 2013 Required Response 2 for Near-Term Task Force Recommendation 2.1: Flooding - Hazard Reevaluation Report CNRO-2013-00002, Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-01-29029 January 2013 Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments GNRO-2012/00150, Final Report for Replacement Steam Dryer2012-12-0606 December 2012 Final Report for Replacement Steam Dryer GNRO-2012/00140, Unit No.1 - Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from ..2012-11-26026 November 2012 Unit No.1 - Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from .. GNRO-2012/00141, Attachment 1, Seismic Walkdown Report GGNS-CS-12-00002, Rev. 0, Attachment C, Seismic Walkdown Checklists (Swcs), Page 151 of 345 Through Page 251 of 3452012-11-15015 November 2012 Attachment 1, Seismic Walkdown Report GGNS-CS-12-00002, Rev. 0, Attachment C, Seismic Walkdown Checklists (Swcs), Page 151 of 345 Through Page 251 of 345 ML12352A0712012-11-15015 November 2012 Attachment 1, Seismic Walkdown Report GGNS-CS-12-00002, Rev. 0, Cover Through Attachment C, Seismic Walkdown Checklists (Swcs), Page 150 of 345 ML12352A0692012-11-15015 November 2012 Attachment 1, Seismic Walkdown Report GGNS-CS-12-00002, Rev. 0, Attachment D, Area Walk-by Checklist (Awcs), Page 1 of 167 Through End ML12352A0682012-11-15015 November 2012 Attachment 1, Seismic Walkdown Report GGNS-CS-12-00002, Rev. 0, Attachment C, Seismic Walkdown Checklists (Swcs), Page 252 of 345 Through Page 345 of 345 GNRO-2012/00113, Vibration Data Report2012-09-18018 September 2012 Vibration Data Report GNRO-2012/00109, Stress Analysis Summary Demonstrating That the Nozzle to Safe-End DMW, N06B-KB, Will Perform Its Intended Design Function After Weld Overlay Installation2012-09-0606 September 2012 Stress Analysis Summary Demonstrating That the Nozzle to Safe-End DMW, N06B-KB, Will Perform Its Intended Design Function After Weld Overlay Installation GNRO-2012/00099, Requested Information Vibration Data for the Main Steam Line Piping and Safety Relief Valves 4102 Mwt (105% Pltp2012-08-21021 August 2012 Requested Information Vibration Data for the Main Steam Line Piping and Safety Relief Valves 4102 Mwt (105% Pltp 2024-08-22 Category:Miscellaneous MONTHYEARML24235A0832024-08-22022 August 2024
[Table view]Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML22011A2982022-01-11011 January 2022 ANS Evaluation Report CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 20202021-04-19019 April 2021 Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 ML21083A1362021-03-23023 March 2021 Completed Activities ML21083A1392021-03-22022 March 2021 Strategy 1 ML21083A1442021-03-22022 March 2021 Strategy 6 ML21083A1432021-03-22022 March 2021 Strategy 5 ML21083A1422021-03-22022 March 2021 Strategy 4 ML21083A1412021-03-22022 March 2021 Strategy 3 ML21083A1402021-03-22022 March 2021 Strategy 2 ML21083A1382021-03-22022 March 2021 Rulemaking ML21083A1372021-03-22022 March 2021 NEIMA Reporting ML21014A2672021-01-14014 January 2021 Preapplication Engagement to Optimize Application Reviews January 12 Version - Copy ML21075A2752020-12-22022 December 2020 FAQ 20-06 GGNS Scram - Final Approved ML18123A3142018-05-0707 May 2018 Staff Assessment of Flooding Focused Evaluation (CAC No. MF9897; EPID L-2017-JLD-0015) ML18085A5792018-03-26026 March 2018 Proposed Revision of Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals ML17290B1372017-10-17017 October 2017 Recommendations for Future Inspection - Replacement Steam Dryer. with GE Hitachi Nuclear Energy Report 0000-0125-6316-R2-NP GNRO-2017/00042, Report Pursuant to 10 CFR 71.95 (a)(3) and (B) of Seven Potential Instances of Noncompliance with Certificate of Compliance No. 9233 for TN-RAM Package2017-07-12012 July 2017 Report Pursuant to 10 CFR 71.95 (a)(3) and (B) of Seven Potential Instances of Noncompliance with Certificate of Compliance No. 9233 for TN-RAM Package GNRO-2017/00038, Focused Evaluation of External Flooding2017-06-27027 June 2017 Focused Evaluation of External Flooding GNRO-2016/00053, Mitigating Strategies Assessment (MSA) for Flooding Submittal2016-12-30030 December 2016 Mitigating Strategies Assessment (MSA) for Flooding Submittal GNRO-2016/00046, Report of 10CFR50.59 Evaluations and Commitment Change Evaluations for the Period July 1, 2014 Through June 30, 20162016-08-23023 August 2016 Report of 10CFR50.59 Evaluations and Commitment Change Evaluations for the Period July 1, 2014 Through June 30, 2016 ML15259A3422015-08-24024 August 2015 10 CFR 71.95 Report Evaluation Form; Submitted by Fenok, Erwin Resin Solutions, North Anna Power Stations, Et Al GNRO-2014/00072, 2014 Report of Changes and Errors to 10CFR50.462014-11-12012 November 2014 2014 Report of Changes and Errors to 10CFR50.46 GNRO-2014/00060, Entergy'S Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-08-26026 August 2014 Entergy'S Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML14232A7392014-08-20020 August 2014 Report of 10CFR72.48 Evaluations - July 1, 2012 Through June 30, 2014 ML14098A1752014-05-0101 May 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident GNRO-2014/00027, Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi.2014-03-31031 March 2014 Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi. ML13217A0532013-07-24024 July 2013 Summary of Root Cause Evaluation - Apparent Violation of 10CFR54.13 for Grand Gulf License Renewal GNRO-2013/00020, Required Response 2 for Near-Term Task Force Recommendation 2.1: Flooding - Hazard Reevaluation Report2013-03-11011 March 2013 Required Response 2 for Near-Term Task Force Recommendation 2.1: Flooding - Hazard Reevaluation Report GNRO-2012/00113, Vibration Data Report2012-09-18018 September 2012 Vibration Data Report GNRO-2012/00099, Requested Information Vibration Data for the Main Steam Line Piping and Safety Relief Valves 4102 Mwt (105% Pltp2012-08-21021 August 2012 Requested Information Vibration Data for the Main Steam Line Piping and Safety Relief Valves 4102 Mwt (105% Pltp ML12159A5152012-06-11011 June 2012 Review of 60-Day Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near Term Task Force Review of Fukushima Dai-ichi Accident ML12157A4262012-05-23023 May 2012 Attachment 38 to GNRO-2012/00039 - Ensr. 2007, Impingement Mortality and Entrainment Characterization Study (Imecs), Entergy -Waterford 3. December 2007 ML12157A2512012-05-23023 May 2012 Attachment 27 to GNRO-2012/00039, Er Reference - GGNS 2007b (2006 Wmp Report) Grand Gulf Nuclear Station 2006 Waste Minimization Certified Report ML12157A2462012-05-23023 May 2012 Attachment 22 to GNRO-2012/00039, Er Reference - Entergy 2010e (NPDES Crs) ML12157A1832012-05-23023 May 2012 Attachment 10 to GNRO-2012/00039 - Entergy Nuclear Grand Gulf Nuclear Station License Renewal Environmental Audit - Hydrology Patton - Attachment P Labeled Thermal Monitoring Procedural Protocols. ML12157A1812012-05-23023 May 2012 Attachment 8 to GNRO-2012/00039 - from Diskette Labeled: Entergy Nuclear Grand Gulf Nuclear Station License Renewal Environmental Audit - Hydrology Patton - Attachment K Labeled Condition Reports. ML1127000692011-09-26026 September 2011 Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants ML1108712502011-03-24024 March 2011 BWR Vessel and Internals Inspection Summaries for Spring 2010 Outages GNRO-2010/00058, Report of 10CFR50.59 Evaluations and Commitment Changes - July 1, 2009 Through June 30, 20102010-08-17017 August 2010 Report of 10CFR50.59 Evaluations and Commitment Changes - July 1, 2009 Through June 30, 2010 GNRO-2009/00036, Report of 10CFR50.59 Evaluations and Commitment Changes - April 1, 2008 Through June 30, 20092009-07-16016 July 2009 Report of 10CFR50.59 Evaluations and Commitment Changes - April 1, 2008 Through June 30, 2009 ML1019004062009-04-30030 April 2009 GPI Data Review, Grand Gulf Nuclear Station GNRO-2008/00052, Special Report 2008-001 - Violation of Certificate of Compliance 1014 Cask Load Limits for HI-STORM 100 System2008-07-17017 July 2008 Special Report 2008-001 - Violation of Certificate of Compliance 1014 Cask Load Limits for HI-STORM 100 System GNRO-2007/00068, Supplement 2 to Amendment Request Changes to the Condensate Storage Tank Level-Low Setpoints2007-09-21021 September 2007 Supplement 2 to Amendment Request Changes to the Condensate Storage Tank Level-Low Setpoints ML0723203352007-05-30030 May 2007 GG-05-2007-FINAL Operating Exam, Operations Training, Determine Shift Staffing to Meet Shift Requirements CNRO-2006-00043, Request for Alternative GG-ISI-002, Request to Use ASME Code Case N-7162006-09-22022 September 2006 Request for Alternative GG-ISI-002, Request to Use ASME Code Case N-716 CNRO-2006-00034, Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee2006-07-13013 July 2006 Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee CNRO-2006-00023, Request for Alternative CEP-PT-001 Visual Examination of Vent and Drain Connections During System Leakage Tests2006-04-24024 April 2006 Request for Alternative CEP-PT-001 Visual Examination of Vent and Drain Connections During System Leakage Tests 2024-08-22 |
Text
GNRO-2014-00061 August 20,2014 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Entergy Operations, Inc.7003 Bald Hill Road P.O.Box 756 Port Gibson, Mississippi 39150 James J.Nadeau Manager, Regulatory Assurance Grand Gulf Nuclear Station Tel: (601)437-2103
SUBJECT:
Report of 10CFR72.48 Evaluations
-July 1, 2012 through June 30, 2014 Grand Gulf Nuclear Station, Unit No.1 Docket No.50-416 License No.NPF-29
Dear Sir or Madam:
Pursuant to 10CFR72.48(d)(2)
Entergy Operations, Inc.hereby submits a summary of 72.48 Evaluations for the period of July 1.2012 through June 30.2014.There were no 72.48 Evaluations for the indicated period.If you have any questions or require additional information, please contact James Nadeau at 601-437-2103.
This letter does not contain any commitments.
Sincerely, JJN/tmc cc: (See Next Page)
GNRO-2014-00061 August 20,2014 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Entergy Operations, Inc.7003 Bald Hill Road P.O.Box 756 Port Gibson, Mississippi 39150 James J.Nadeau Manager, Regulatory Assurance Grand Gulf Nuclear Station Tel: (601)437-2103
SUBJECT:
Report of 10CFR72.48 Evaluations
-July 1, 2012 through June 30, 2014 Grand Gulf Nuclear Station, Unit No.1 Docket No.50-416 License No.NPF-29
Dear Sir or Madam:
Pursuant to 10CFR72.48(d)(2)
Entergy Operations, Inc.hereby submits a summary of 72.48 Evaluations for the period of July 1.2012 through June 30.2014.There were no 72.48 Evaluations for the indicated period.If you have any questions or require additional information, please contact James Nadeau at 601-437-2103.
This letter does not contain any commitments.
Sincerely, JJN/tmc cc: (See Next Page)
GNRO-2014-00061 Page 2 of 2 cc: NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 U.S.Nuclear Regulatory Commission ATTN: Mr.Marc Dapas (w/2)Region Administrator, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 U.S.Nuclear Regulatory Commission ATTN: Mr.Alan Wang, NRRlDORL (w/2)Mail Stop OWFN 8 B1 Washington, DC 20555-0001 GNRO-2014-00061 Page 2 of 2 cc: NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 U.S.Nuclear Regulatory Commission ATTN: Mr.Marc Dapas (w/2)Region Administrator, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 U.S.Nuclear Regulatory Commission ATTN: Mr.Alan Wang, NRRlDORL (w/2)Mail Stop OWFN 8 B1 Washington, DC 20555-0001