|
---|
Category:ENVIRONMENTAL MONITORING REPORTS(&RADIOLOGICAL)-PERIODIC
MONTHYEARML18016B0191998-12-31031 December 1998 Corrected Pages to Annual Radioactive Effluent Release Rept, for 1998 for HNP ML18016A9331998-12-31031 December 1998 Annual Radioactive Effluent Release Rept for Jan-Dec 1998. ML18016A9291998-12-31031 December 1998 Shnpp Unit 1 Annual Environ (Nonradiological) Operating Rept for Jan-Dec 1998. with 990428 Ltr ML18016A9271998-12-31031 December 1998 1998 Annual Radiological Environ Operating Rept for Harris Nuclear Plant. with 990428 Ltr ML18016A8211998-12-31031 December 1998 Number of Personnel & Man-Rem by Work & Job Functions, 1998,Harris Plant. with 990218 Ltr ML18016A4121997-12-31031 December 1997 Annual Radioactive Effluent Release Rept for Jan-Dec 1997. ML18016A4081997-12-31031 December 1997 Radiological Environ Operating Rept for 1997. W/980428 Ltr ML18016A4071997-12-31031 December 1997 Annual Environ (Nonradiological) Operating Rept,App B for 970101-1231. W/980427 Ltr ML18016A3301997-12-31031 December 1997 1997 Annual Operating Rept of Individuals Receiving Exposures Greater than 100Mr/Yr. W/980226 Ltr ML18022B0141996-12-31031 December 1996 Annual Radioactive Effluent Release Rept 960101-1231. W/970414 Ltr ML18012A7771996-12-31031 December 1996 Annual Radiological Environ Operating Rept for 1996. W/ 970428 Ltr ML18012A7541996-12-31031 December 1996 Radiological Environ Operating Rept for Shearon Harris Nuclear Power Plant,Jan-Dec 1996. ML18012A6381996-12-31031 December 1996 Annual Environ (Non-Radiological) Operating Rept,App B for 960101-1231. W/970428 Ltr ML18012A5401996-12-31031 December 1996 Numbers of Personnel & Man-Rem by Work & Job Function,1996 Harris Plant. W/970227 Ltr ML18012A4281996-10-31031 October 1996 NPDES Discharge Monitoring Rept for Oct 1996 for Perry Nuclear Power Plant. W/961115 Ltr ML18012A2401995-12-31031 December 1995 Annual Environ (Nonradiological) Operating Rept,App B for Jan-Dec 1995. W/960430 Ltr ML18012A2391995-12-31031 December 1995 Annual Radioactive Effluent Release Rept Jan-Dec 1995. W/ 960430 Ltr ML18012A2341995-12-31031 December 1995 1995 Annual Radiological Environ Operating Rept,Vols I- Iii. W/960429 Ltr ML18012A1471995-12-31031 December 1995 Number of Personnel & Man-Rem by Work & Job Function,1995. W/960221 Ltr ML18011B0801994-12-31031 December 1994 Revised Semi-Annual Effluent Release Rept for Period of Jul-Dec 1994. ML18011A8021994-12-31031 December 1994 Semiannual Radioactive Release Rept Jul-Dec 1994. ML18011A7961994-12-31031 December 1994 Annual Operating Rept, Consisting of Info Re Number of Individuals Receiving Exposures Greater than 100 Mrem/Yr, Primary Coolant Iodine Spikes & Challenges to PORVs & Safety Valves for 1994.W/950223 Ltr ML18022A9541994-12-31031 December 1994 Radiological Environ Operating Rept, Vols I,Ii & Iii.W/ 950421 Ltr ML18022A9601994-12-31031 December 1994 Annual Environ (Nonradiological) Operating Rept for Jan -Dec 1994. W/ 950421 Ltr ML18011A5571994-06-30030 June 1994 Semiannual Radioactive Effluent Release Rept for Jan-June 1994. ML18011A4041993-12-31031 December 1993 Vols 1,2 & 3 of Radiological Environ Operating Rept 1993. ML18011A4241993-12-31031 December 1993 Shnpp Unit 1 Annual Environ (Nonradiological) Operating Rept,App B,Jan-Dec 1993. W/940428 Ltr ML18011A3591993-12-31031 December 1993 Semiannual Radioactive Effluent Release Rept Jul-Dec 1993. W/940228 Ltr ML18011A3571993-12-31031 December 1993 Annual Operating Rept for 1993, Including Number of Personnel & man-rem by Work & Job Function,Primary Coolant Iodine Spikes & Primary Relief & Safety Valve challenges.W/940225 Ltr ML18011A1171993-06-30030 June 1993 Semiannual Radioactive Effluent Release Rept Jan-June 1993. ML18010B0601992-12-31031 December 1992 1992 Statistical Summary Rept for Shearon Harris Nuclear Power Plant,Unit 1, Per 10CFR20.407.W/930312 Ltr ML18010B0821992-12-31031 December 1992 Annual Environ (Non-Radiological) Operating Rept. W/930430 Ltr ML18010B0831992-12-31031 December 1992 Radiological Environ Operating Rept,1992 for Shearon Harris Nuclear Power Plant. W/930429 Ltr ML18010B0181992-12-31031 December 1992 Semiannual Radioactive Effluent Release Rept,Jul-Dec 1992. W/930224 Ltr ML18010A7291992-06-30030 June 1992 Semiannual Radioactive Effluent Release Rept,Jan-June 1992. W/920827 Ltr ML18010A5451991-12-31031 December 1991 Semiannual Radioactive Effluent Release Rept for Jul-Dec 1991. ML18010A5341991-12-31031 December 1991 Annual Personnel Monitoring Rept for Shearon Harris Nuclear Power Plant for 1991. W/920218 Ltr ML18010A5491991-12-31031 December 1991 Personnel & Man-Rem by Work & Job Function for 1991. W/ 920224 Ltr ML18010A6111991-12-31031 December 1991 Radiological Environ Operating Rept 1991,Harris Nuclear Project. ML18010A6141991-12-31031 December 1991 Radiological Environ Operating Rept,Vol III,Jul-Dec 1991 Sample Analyses Data. ML18010A6151991-12-31031 December 1991 Annual Environ (Nonradiological) Operating Rept,1991. W/920424 Ltr ML18010A6301991-12-31031 December 1991 Amended Shearon Harris Annual Operating Rept for 1991. ML18010A3731991-06-30030 June 1991 Semiannual Radioactive Effluent Release Rept,Jan-June 1991. W/910830 Ltr ML18010A6131991-06-30030 June 1991 Radiological Environ Operating Rept,Vol II,Jan-June 1991, Sample Analyses Data. ML18022A8151990-12-31031 December 1990 Annual Radiological Environmental Monitoring Rept for 1990. W/910422 Ltr ML18009A8221990-12-31031 December 1990 Semiannual Radioactive Release Rept,Jul-Dec 1990. W/910227 Ltr ML18009A8751990-12-31031 December 1990 Annual Environ (Nonradiological) Operating Rept for 1990. W/910422 Ltr ML18009A6371990-06-30030 June 1990 Semiannual Radioactive Effluent Release Rept Jan-June 1990. W/900830 Ltr ML18009A5131989-12-31031 December 1989 Annual Environ (Nonradiological) Operating Rept for 1989. W/900430 Ltr ML18009A4981989-12-31031 December 1989 Radiological Environ Operating Rept,Vol III,Jul-Dec 1989, Sample Analyses Data. 1998-12-31
[Table view] Category:TEXT-ENVIRONMENTAL REPORTS
MONTHYEARML18016A8211998-12-31031 December 1998 Number of Personnel & Man-Rem by Work & Job Functions, 1998,Harris Plant. with 990218 Ltr ML18016A9271998-12-31031 December 1998 1998 Annual Radiological Environ Operating Rept for Harris Nuclear Plant. with 990428 Ltr ML18016A9291998-12-31031 December 1998 Shnpp Unit 1 Annual Environ (Nonradiological) Operating Rept for Jan-Dec 1998. with 990428 Ltr ML18016A9331998-12-31031 December 1998 Annual Radioactive Effluent Release Rept for Jan-Dec 1998. ML18016B0191998-12-31031 December 1998 Corrected Pages to Annual Radioactive Effluent Release Rept, for 1998 for HNP ML18016A3301997-12-31031 December 1997 1997 Annual Operating Rept of Individuals Receiving Exposures Greater than 100Mr/Yr. W/980226 Ltr ML18016A4071997-12-31031 December 1997 Annual Environ (Nonradiological) Operating Rept,App B for 970101-1231. W/980427 Ltr ML18016A4081997-12-31031 December 1997 Radiological Environ Operating Rept for 1997. W/980428 Ltr ML18016A4121997-12-31031 December 1997 Annual Radioactive Effluent Release Rept for Jan-Dec 1997. ML18022B0141996-12-31031 December 1996 Annual Radioactive Effluent Release Rept 960101-1231. W/970414 Ltr ML18012A5401996-12-31031 December 1996 Numbers of Personnel & Man-Rem by Work & Job Function,1996 Harris Plant. W/970227 Ltr ML18012A6381996-12-31031 December 1996 Annual Environ (Non-Radiological) Operating Rept,App B for 960101-1231. W/970428 Ltr ML18012A7541996-12-31031 December 1996 Radiological Environ Operating Rept for Shearon Harris Nuclear Power Plant,Jan-Dec 1996. ML18012A7771996-12-31031 December 1996 Annual Radiological Environ Operating Rept for 1996. W/ 970428 Ltr ML18012A4201996-11-11011 November 1996 NPDES Noncompliance Notification:On 960930,exceeded Daily Max Limit & Monthly Average Limit of BOD5 During Reporting Period.Caused by Reduction in Chlorine Contact Time.Reviewed Operational Procedures ML18012A4281996-10-31031 October 1996 NPDES Discharge Monitoring Rept for Oct 1996 for Perry Nuclear Power Plant. W/961115 Ltr ML18012A1931996-03-29029 March 1996 NPDES Noncompliance Notification:On 960326 Internal Audit Identified Concern W/Sampling Frequency for Fecal Coliform at Heec Outfall.Investigation in Progress & Upon Completion Results Will Be Communicated ML18012A1471995-12-31031 December 1995 Number of Personnel & Man-Rem by Work & Job Function,1995. W/960221 Ltr ML18012A2401995-12-31031 December 1995 Annual Environ (Nonradiological) Operating Rept,App B for Jan-Dec 1995. W/960430 Ltr ML18012A2391995-12-31031 December 1995 Annual Radioactive Effluent Release Rept Jan-Dec 1995. W/ 960430 Ltr ML18012A2341995-12-31031 December 1995 1995 Annual Radiological Environ Operating Rept,Vols I- Iii. W/960429 Ltr ML18011B0251995-09-13013 September 1995 NPDES Noncompliance Notification:On 950908,discovered Zinc Concentrations of Approx 3 Ppm in Cooling Tower Blowdown Discharge.Caused by Decrease in Ph of Cooling Tower Water. Cause of Ph Change Being Investigated ML18022A9601994-12-31031 December 1994 Annual Environ (Nonradiological) Operating Rept for Jan -Dec 1994. W/ 950421 Ltr ML18022A9541994-12-31031 December 1994 Radiological Environ Operating Rept, Vols I,Ii & Iii.W/ 950421 Ltr ML18011B0801994-12-31031 December 1994 Revised Semi-Annual Effluent Release Rept for Period of Jul-Dec 1994. ML18011A8021994-12-31031 December 1994 Semiannual Radioactive Release Rept Jul-Dec 1994. ML18011A7961994-12-31031 December 1994 Annual Operating Rept, Consisting of Info Re Number of Individuals Receiving Exposures Greater than 100 Mrem/Yr, Primary Coolant Iodine Spikes & Challenges to PORVs & Safety Valves for 1994.W/950223 Ltr ML18011A5571994-06-30030 June 1994 Semiannual Radioactive Effluent Release Rept for Jan-June 1994. ML18011A3571993-12-31031 December 1993 Annual Operating Rept for 1993, Including Number of Personnel & man-rem by Work & Job Function,Primary Coolant Iodine Spikes & Primary Relief & Safety Valve challenges.W/940225 Ltr ML18011A3591993-12-31031 December 1993 Semiannual Radioactive Effluent Release Rept Jul-Dec 1993. W/940228 Ltr ML18011A4041993-12-31031 December 1993 Vols 1,2 & 3 of Radiological Environ Operating Rept 1993. ML18011A4241993-12-31031 December 1993 Shnpp Unit 1 Annual Environ (Nonradiological) Operating Rept,App B,Jan-Dec 1993. W/940428 Ltr ML18011A1171993-06-30030 June 1993 Semiannual Radioactive Effluent Release Rept Jan-June 1993. ML18010B0831992-12-31031 December 1992 Radiological Environ Operating Rept,1992 for Shearon Harris Nuclear Power Plant. W/930429 Ltr ML18010B0821992-12-31031 December 1992 Annual Environ (Non-Radiological) Operating Rept. W/930430 Ltr ML18010B0601992-12-31031 December 1992 1992 Statistical Summary Rept for Shearon Harris Nuclear Power Plant,Unit 1, Per 10CFR20.407.W/930312 Ltr ML18010B0181992-12-31031 December 1992 Semiannual Radioactive Effluent Release Rept,Jul-Dec 1992. W/930224 Ltr ML18010A7291992-06-30030 June 1992 Semiannual Radioactive Effluent Release Rept,Jan-June 1992. W/920827 Ltr ML18010A5491991-12-31031 December 1991 Personnel & Man-Rem by Work & Job Function for 1991. W/ 920224 Ltr ML18010A6301991-12-31031 December 1991 Amended Shearon Harris Annual Operating Rept for 1991. ML18010A6111991-12-31031 December 1991 Radiological Environ Operating Rept 1991,Harris Nuclear Project. ML18010A5341991-12-31031 December 1991 Annual Personnel Monitoring Rept for Shearon Harris Nuclear Power Plant for 1991. W/920218 Ltr ML18010A6141991-12-31031 December 1991 Radiological Environ Operating Rept,Vol III,Jul-Dec 1991 Sample Analyses Data. ML18010A6151991-12-31031 December 1991 Annual Environ (Nonradiological) Operating Rept,1991. W/920424 Ltr ML18010A5451991-12-31031 December 1991 Semiannual Radioactive Effluent Release Rept for Jul-Dec 1991. ML18010A3731991-06-30030 June 1991 Semiannual Radioactive Effluent Release Rept,Jan-June 1991. W/910830 Ltr ML18010A6131991-06-30030 June 1991 Radiological Environ Operating Rept,Vol II,Jan-June 1991, Sample Analyses Data. ML18009A8811991-04-29029 April 1991 NPDES Noncompliance Notification:On 910310,bldg Sewage Collection Tank Pump Discovered to Be de-energized During Electrical Bus Outage.Caused by Inoperable Pump.Personnel to Refrain from Using Rest Rooms Until Power Restored ML18009A8751990-12-31031 December 1990 Annual Environ (Nonradiological) Operating Rept for 1990. W/910422 Ltr ML18009A8221990-12-31031 December 1990 Semiannual Radioactive Release Rept,Jul-Dec 1990. W/910227 Ltr 1998-12-31
[Table view] |
Text
~CATEGORY 2g REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROBINSON,W.R.
Carolina Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET'5 05000400
SUBJECT:
"Numbers of Per nial~Man-Rem by Work&Job Function,1996 Harris Plant."/9702 tr.C DISTRIBUTION CODE: IE56D COPIES RECEIVED:LTR ENCL SIZE: TITLE: 20.407 Annual Pezsonnel Monitoring Rpt/Annual Rad Exposure Rpt by Fun NOTES:Application for permit renewal filed.05000400 T RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL ACNW NMSS/SSSS T 8F5 RES/RPHEB EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 0 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME LE,N F I NEER~>>NRR/DRPM/PERB/B RGN2 01 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D 0 E N NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL.10
Carolina Power&Light Company PO Box 165 New Hill NC 27562 William R.Robinson Vice President Harris Nuclear Plant FEB 27 1997 United States Nuclear Regulatory Commission ATTENTION:
Document Control Desk~Washington, DC 20555 Serial HNP-97-051 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 ANNUAL OPERATING REPORT-1996 Gentlemen:
In accordance with Harris Nuclear Plant Technical Specification 6.9.1.2, Carolina Power&Light Company herewith submits the annual report of (a)individuals receiving exposures greater than 100 mrem/yr and their associated man-rem exposure according to work and job functions, (b)primary coolant iodine spikes, and (c)challenges to the pressurizer power-operated relief valves (PORVs)and safety valves for 1996.Questions regarding this matter may be referred to Ms.D.B.Alexander at (919)362-3190.Sincerely, MV Mr.J.B.Brady (NRC Senior Resident Inspector-HNP)Mr.L.A.Reyes (NRC Regional Administrator
-NRR)Mr.N.B.Le (NRC Project Manager-NRR)Ms.M.L.Thomas (NRC Project Manager-REIRS)t gg5b PDR ADOCK 05000400 IllllllIIIIIIIIIKIIIIIIIIIIIHIIlIIIIIIIIIIII State Road 1134 New Hill NC Tel 919362-2502 Fax 919362-2095,,
Documen(Control Desk HNP-97-051
/Page 2 bc: Ms.D.B.Alexander Ms.P.B.Brannan Mr.H.K.Chernoff (RNP)Mr.G.W.Davis Mr.J.W.Donahue Ms.S.F.Flynn Mr.H.W.Habermeyer, Jr.Mr.W.J.Hindman Ms.W.C.Langston (PE&RAS File)Mr.R.D.Martin Mr.W.S.Orser Mr.G.A.Rolfson Mr.R.S.Stancil Mr.M.A.Turkal (BNP)Mr.T.D.Walt Nuclear Records File: Hl/A'-2D Document Control Desk HNP-97-051
/Page 3 RIHS ZZ NUMBER OF PERSOMNEL AND HAN-REH BY WORK HARRIS PLANT AND JOB FUNCTIOn, 1996 NUMBER OF PERSONNEL>100 NREM I TOTAL HAN-REH WORK AND JOB FUNCTION STAT UTIL CNTR I STAT UTIL CNTR REACTOR OPERATIONS AND SURVEILLANCE MAINTENANCE PERSONNEL 1 OPERATING PERSONNEL 3 HEALTH PHYSICS PERSONNEL 9 SUPERVISORY PERSONNEL 0 ENGINEERING PERSONNEL 0 0.435 2.201 2.867 0.054 0.439 0.003 0.000 0.000 0.006 0.034 0.232 0.128 0.091 0.002 0.102 ROUTINE HAINTENANCE MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL INSERVICE INSPECTION HAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL SPECIAL HAINTENANCE HAINTENANCE PERSPNNEL OPERATING PERSONMEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL WASTE PROCESSING MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL REFUELING HAINTENANCE PERSOMMEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL TOTAL HAINTEMANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSOMNEL GRANO TOTAL 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 P 0 0 0 B 0 3 0 14 0 0 0 1 0 26 0 1P 0 0 0 0 11 0 0 0 0 2.015 0.261 0.296 0.007 0.373 0.003 0.000 0.048 0.000 0.011 2.064 0.071 1.164 0.005 0.372 0.243 O.153 0.786 p.ppl 0.022 0.095 0.20B 0.121 0.000 0.087 4.855 2.894 5.282 0.067 1'04 14.402 0.002 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.003 0.000 0.000 0.000 0.000 0 F 000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.008 0.000 0.000 0.006 0.034 0.048 0.937 0.000 0.001 0.001 0.049 0.000 0.800 0.000 0.000 0.000 3.421 0.032 0.003 0.000 0.006 0.053 0.000 0.000 0.000 0.052 0.065 0.000 0.000 0.000 0.000 4.708 0.160 0.095 0.003 0.209 5.175 Notes: (1)Dose based on electronic dosimeters (2)STAT=Harris Plant staff UTIL=CP&L non-Harris personnel CNTR=,Contractor (3)Special Maintenance includes special work on spent fuel cask, spent fuel pools, moveable in-core detectors seal table room equipment, steam generators, reactor head, and certain valves and pumps.
Document Control Desk HNP-97-051
/Page 4 1996 ANNUAL REPORT-PRIMARY COOLANT IODINE SPIKES During 1996, activity levels in the primary coolant did not exceed 1.0 pCi/gram dose equivalent I-131 or 100/E-bar pCi/gram gross radioactivity as set forth in Technical Specification 3.4.8.
Document Control Desk HNP-97-051
/Page 5 1996 ANNUAL REPORT-PRESSURIZER RELIEF AND SAFETY VALVE CHALLENGES There were no challenges to the pressurizer safety valves in 1996.One (1)pressurizer power-operated relief valve was challenged in 1996.Details of this event are described below.On March 29, 1996, following a heatup to normal plant temperature and pressure, the reactor operator in the main control room placed the Pressurizer Pressure Master Controller into AUTOMATIC prior to raising the controller setpoint to its correct value for normal plant operation.
This resulted in an inadvertent opening of PORV 444B at 1255 hours0.0145 days <br />0.349 hours <br />0.00208 weeks <br />4.775275e-4 months <br />.Operations personnel observed the open PORV and placed it back into MANUAL and closed the associated block valve to restore pressurizer pressure control and secure the pressure transient.
After setting the master controller to the correct value, the PORV was unisolated by opening the block valve and the master controller was placed back into AUTOMATIC.
However, after taking these actions, pressurizer spray control was left in MANUAL instead of being placed into AUTOMATIC, with pressurizer heaters on.Due to the design of the master controller circuitry, which uses a time integrating function, the master controller began automatically increasing controller output and approximately 30 minutes later (1328 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.05304e-4 months <br />)PORV 444B opened again.Operations personnel once again closed the PORV block valve before any significant pressure transient occurred.Reactor Coolant System pressure was maintained within its required band during each of these inadvertent PORV openings.Both instances were caused by personnel error related to improper operation of the Pressurizer Pressure Master Controller and procedural deficiencies within the controlling plant procedure.
Additional details of this event, including further description of the master controller function were included in NRC Inspection Report Number 53-400/96-04 dated May 20, 1996.