ML18010A534

From kanterella
Jump to navigation Jump to search
Annual Personnel Monitoring Rept for Shearon Harris Nuclear Power Plant for 1991
ML18010A534
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/31/1991
From: Richey R
CAROLINA POWER & LIGHT CO.
To: Raddatz C
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
References
HO-920044-(O), NUDOCS 9202250056
Download: ML18010A534 (3)


Text

ACCELERATED D~ TRIBUTION DEMONSATION SYSTEM REGULA Y INFORMATION DISTRIBUTION SYSTEM (RIDS)

FACIL:50'-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION RICHEY,R.B.

Carolina Power

& Light Co..

RECIP.NAME RECIPIENT AFFILIATION DOCKET ¹ 05000400 RADDATZ,C.T.

Office of Nuclear Regulatory Research (Post 860720)

SUBJECT:

"Annual Personnel Monitor' t for Shearon Harris Nuclear Power 'Plant for 1991."

/920218 tr.

DISTRIBUTION CODE:

IE56D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 20.407 Annual Personnel Monitoring Rpt/Annual Rad Exposure Rpt by Fun NOTES:Application for permit renewal filed.

05000400 RECIPIENT ID CODE/NAME PD2-1 LA MOZAFARI,B.

INTERNAL: ACNW NRR/DO~

AB11 MG~Z

~

2 EXTERNAL: NRC,PDR COPIES LTTR ENCL 1

0 1

0 6

6 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1 PD'EOD/DSP/TPAB NRR/DREP/PRPB11 RES RADDATZ,C NSIC COPIES LTTR ENCL 5

5 1

1 2

.2 1

1 1

1 NOTE=TO ALL"RIDS" RECIPIENTS PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL 20

FORM 22 CII I Carolina Power & Light Company HARRIS NUCLEAR PROJECT P. 0.

Box 165 New Hill, North Carolina 27562 FEB 1

6 1992 Letter Number:

HO-920044 (0)

Ms. Charleen T. Raddatz, Director Office of Nuclear Regulatory Research U.

S. Nuclear Regulatory Commission Washington, D.C

~

20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 ANNUAL PERSONNEL MONITORING REPORT

Dear Ms. Raddatz:

Enclosed is the Annual Personnel Monitoring Report for Shearon Harris Nuclear Power Plant covering the period from January 1,

1991 through December 31, 1991

'his report is submitted in accordance with 10CFR20.407.

Very truly yours, Olrglina/ Slgned By R. 8. R/CHEY R.

B. Richey Vice President Harris Nuclear Project MGW:smm Attachment cc:

Messrs.

S.

D. Ebneter (NRC - RII)

J.

E. Tedrow (NRC -

SHNPP)

NRC Document Control Desk~

MEM/H0-920044.0/1/OS1 9202250056 91123i PDR ADOCK 05000400 R

PDR

1991 Statistical Summarv Repor.

Harris Plant Whole Body Exposure Hanae irem)

Numoer oi Individuals in Ran e

No measurable exposure 912 Measurable exposure less than 0.1 384 0.1 to 0.25 0.25 to 0.50 0.50 to 0.75 "0.75 to 1.00 1to2 2to3

'3to4 4to5 Sto6 6 to 7 7to 8 8 to 9 9 to 10

'10 to 11

'11 to 12 I 12+

Total Person rem:

Total 226.440

'1 80

'. 48 85 48 27 1,784 NOTE: 1,784 personnel were required to be monitored as discussed in 10CFR20.407(a) (1).