Personnel & Man-Rem by Work & Job Function for 1991. W/ 920224 Ltr
ML18010A549
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/31/1991
From: Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-920043-(O), NUDOCS 9202270246
Download: ML18010A549 (5)


Text

ACCELERATED 'DISTRIBUTION DEMONS TION SYSTEM REGULA Y INFORMATION DISTRZBUTIOL SYSTEM (RIDE)

ACCESSION NBR:9202270246 DOC.DATE: 91/12/31 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power, Plant, Unit 1, Carolina 05000400 A(!TH.NAME AUTHOR AFFILIATION RICHEY,R.B. Carolina Power 6 Light Co.

RECIP,NAME RECIPIENT AFFILIATION

SUBJECT:

"Personnel & Man-Rem by Work 6 Job Function for -1991." W/

920224'ltr.

DISTRIBUTION CODE: ZE47D COPIES RECEIVED:LTR I ENCL TITLE: 50.59 Annual Report of Changes, Tests or Experiments Made U SIZE:

W out Approv NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 0 PD2-1 PD 5 5 MOZAFARIFB. 1 0 INTERNAL: ACRS 6 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/DLPQ/LHFB11 1 1 NRR/DOEA/OEAB11 1 1 R GFFI-'GE -

02, 1 1 RGN2 EXTERNAL: NRC PDR FILE 01 1 1

1 1 NSIC l,l NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR '1 ENCL 19

Carolina Power 8 Light Company P.O. 8ox 165 ~ New Hill. N.C. 27562 R. 8. RICHEY Vice President Harris Nuclear Project FEB 2 4 1992 Letter Number: HO-920043 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 ANNUAL OPERATING REPORT Gentlemen:

In accordance with Technical Specification 6.9.1.2 for the Shearon Harris Nuclear Power Plant, Unit No. 1, Carolina Power and Light Company herewith submits the annual report of (a) individuals receiving exposures greater than 100'mrem/yr and their associated man-rem exposure according to work and job functions, (b) primary coolant iodine spikes, and (c) challenges to the pressurizer power-operated relief valves (PORVs) and primary safety valves for 1991.

Very truly yours, R. B. Richey Vice President Harris Nuclear Project MGW:smm Attachment cc: Mr. S. D. Ebneter (NRC - RII).

Mr. J. E. Tedrow (NRC - SHNPP)

Ms. C. T. Raddatz (NRC - REIRS Project Manager)

MEM/H0-920043.0/1/Osl r'.'DR 9202270246 911231 R

ADOCK 05000400 PDR

Document Control Des Page 2 RIMS II NUMBER OF PERSONNEL AND MAN-.REM BY WORK AND JOB FUNCTION> 1991 HARRIS PLANT NUMBER OF PERSONNEL > 100 MREM I TOTAL MAN-REM WORK AND JOB FUNCTION .. .. .. STAT . UTIL CNTR . I .STAT . . UTII  ; .CNTP .

REACTOR OPERATIONS .AND SURVEILLANCE MAINTENANCE PERSONNEL 3 0 1 0.740 0.001 0.506 OPERATING PERSONNEL 22 0 2 6.092 0.000 1.770 HEALTH PHYSICS PERSONNEL 21 0 52 7.'568 0.000 12.990 SUPERVISORY PERSONNEL 0 0 0 0. 141 0.000 0.036 ENGINEERING PERSONNEL=- 2 0 0 1.949 0.425 0.603 ROUTINE MAINTENANCE MAINTENANCE PERSONNEL 0 1 31 1.841 0.725 12. 217 OPERATING PERSONNEL 0 0 1 0.026 0.000 0.259 HEALTH PHYSICS PERSONNEL 3 0 1, 0.650 0.000 0.915 SUPERVISORY PERSONNEL, 0 0 0 0.025 0.000 0.000 ENGINEERING PERSONNEL 0 0 0 0. 157 . 0.030 0.282 INSERVICE INSPECTION MAINTENANCE PERSONNEL 0 0 0 0. 086 0. 150 0.040

.OPERATING PERSONNEL 0 2 0.287 0.000 ,0. 480 HEALTH PHYSICS PERSONNEL 0 0 0 0.061 0.000 0. 173 SUPERVISORY PERSONNEL 0 0 0 0.000 0.000 ~ 0.000 ENGINEERING PERSONNEL 0 0 0 0.050 0.000 0.000 SPECIAL MAINTENANCE MAINTENANCE PERSONNEL 40 6 85 19. 977 2.756 31.521 OPERATING PERSONNEL 14 0 -

0 5.386 0.000 0.335 HEALTH PHYSICS PERSONNEL 13 0 29 7 '76 0.000 10.007 SUPERVISORY PERSONNEL 1 0 0 0.559 0.000 0.010 ENGINEERING PERSONNEL 13 0 . 59 5.236 0. 119 37.231 WASTE PROCESSING MAINTENANCE PERSONNEL 2 0 0 1. 030 0.030 0. 165 OPERATING PERSONNEL 0 .0 0 0.020 0.000 ,0. 000 HEALTH PHYSICS PERSONNEL 5 0 1 2.390 0.005 0.680 SUPERVISORY PERSONNEL 0 0 0 0.000 0.000 0.000 ENGINEERING PERSONNEL ,1 0 1 0. 143 0.000 0. 215 REFUELING MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL 24 0

7 13 0,.0 0

0-96 24 0

12.453

1. 177 2.635 0.150 5.920 0.000 0.000 0.030 39.264 0;000

'.315 0.350 SUPERVISORY PERSONNEL 0 ENGINEERING PERSONNEL, .7...1 .42. ..2.769 . 0..425, .2,4. 3,50 TOTAL MAINTENANCE PERSONNEL 69 20 213 36. 127 9.582 83.713 OPERATING PERSONNEL 37 0 5 12.988 0.000 2.844 HEALTH PHYSICS PERSONNEL 49 0 107 20.980 0.005 32.080 SUPERVISORY PERSONNEL 1 0 0 0.875 0.030 0 '96 ENGINEERING PERSONNEL 23 . 1 102 10.304 0.999 62.681 GRAND TOTAL 179. 21 427 81.274 10.616 181.714 Notes: (1) Dose based on pocket dosimeters (2) Stat = Harris Plant Staff Util = CP&L non-Harris personnel Cntr = Contractor HEN/HO-920043. 0/2/OS 1

Document Control Desk Page 3 1991 ANNUAL REPORT - PRIMARY COOLANT IODINE SPIKES I

During 1991, the primary coolant did not exceed 1.0 pCi/gram dose equivalent I-131 or 100/E-bar pCi/gram gross radioactivity as 'et forth in Technical Specification 3.4.8.

- MEM/H0-920043.0/3/OS1

Document Control Desk Page 4 19 1 ANNUAL REPORT - PRIMARY SAFETY AND RELIEF VALVE CHALLENGES During 1991, there were no challenges to the primary power operated relief valves (PORVs) or the primary safety valves.

MEM/H0-920043.0/4/OS1