|
---|
Category:ENVIRONMENTAL MONITORING REPORTS(&RADIOLOGICAL)-PERIODIC
MONTHYEARML18016B0191998-12-31031 December 1998 Corrected Pages to Annual Radioactive Effluent Release Rept, for 1998 for HNP ML18016A9331998-12-31031 December 1998 Annual Radioactive Effluent Release Rept for Jan-Dec 1998. ML18016A9291998-12-31031 December 1998 Shnpp Unit 1 Annual Environ (Nonradiological) Operating Rept for Jan-Dec 1998. with 990428 Ltr ML18016A9271998-12-31031 December 1998 1998 Annual Radiological Environ Operating Rept for Harris Nuclear Plant. with 990428 Ltr ML18016A8211998-12-31031 December 1998 Number of Personnel & Man-Rem by Work & Job Functions, 1998,Harris Plant. with 990218 Ltr ML18016A4121997-12-31031 December 1997 Annual Radioactive Effluent Release Rept for Jan-Dec 1997. ML18016A4081997-12-31031 December 1997 Radiological Environ Operating Rept for 1997. W/980428 Ltr ML18016A4071997-12-31031 December 1997 Annual Environ (Nonradiological) Operating Rept,App B for 970101-1231. W/980427 Ltr ML18016A3301997-12-31031 December 1997 1997 Annual Operating Rept of Individuals Receiving Exposures Greater than 100Mr/Yr. W/980226 Ltr ML18022B0141996-12-31031 December 1996 Annual Radioactive Effluent Release Rept 960101-1231. W/970414 Ltr ML18012A7771996-12-31031 December 1996 Annual Radiological Environ Operating Rept for 1996. W/ 970428 Ltr ML18012A7541996-12-31031 December 1996 Radiological Environ Operating Rept for Shearon Harris Nuclear Power Plant,Jan-Dec 1996. ML18012A6381996-12-31031 December 1996 Annual Environ (Non-Radiological) Operating Rept,App B for 960101-1231. W/970428 Ltr ML18012A5401996-12-31031 December 1996 Numbers of Personnel & Man-Rem by Work & Job Function,1996 Harris Plant. W/970227 Ltr ML18012A4281996-10-31031 October 1996 NPDES Discharge Monitoring Rept for Oct 1996 for Perry Nuclear Power Plant. W/961115 Ltr ML18012A2401995-12-31031 December 1995 Annual Environ (Nonradiological) Operating Rept,App B for Jan-Dec 1995. W/960430 Ltr ML18012A2391995-12-31031 December 1995 Annual Radioactive Effluent Release Rept Jan-Dec 1995. W/ 960430 Ltr ML18012A2341995-12-31031 December 1995 1995 Annual Radiological Environ Operating Rept,Vols I- Iii. W/960429 Ltr ML18012A1471995-12-31031 December 1995 Number of Personnel & Man-Rem by Work & Job Function,1995. W/960221 Ltr ML18011B0801994-12-31031 December 1994 Revised Semi-Annual Effluent Release Rept for Period of Jul-Dec 1994. ML18011A8021994-12-31031 December 1994 Semiannual Radioactive Release Rept Jul-Dec 1994. ML18011A7961994-12-31031 December 1994 Annual Operating Rept, Consisting of Info Re Number of Individuals Receiving Exposures Greater than 100 Mrem/Yr, Primary Coolant Iodine Spikes & Challenges to PORVs & Safety Valves for 1994.W/950223 Ltr ML18022A9541994-12-31031 December 1994 Radiological Environ Operating Rept, Vols I,Ii & Iii.W/ 950421 Ltr ML18022A9601994-12-31031 December 1994 Annual Environ (Nonradiological) Operating Rept for Jan -Dec 1994. W/ 950421 Ltr ML18011A5571994-06-30030 June 1994 Semiannual Radioactive Effluent Release Rept for Jan-June 1994. ML18011A4041993-12-31031 December 1993 Vols 1,2 & 3 of Radiological Environ Operating Rept 1993. ML18011A4241993-12-31031 December 1993 Shnpp Unit 1 Annual Environ (Nonradiological) Operating Rept,App B,Jan-Dec 1993. W/940428 Ltr ML18011A3591993-12-31031 December 1993 Semiannual Radioactive Effluent Release Rept Jul-Dec 1993. W/940228 Ltr ML18011A3571993-12-31031 December 1993 Annual Operating Rept for 1993, Including Number of Personnel & man-rem by Work & Job Function,Primary Coolant Iodine Spikes & Primary Relief & Safety Valve challenges.W/940225 Ltr ML18011A1171993-06-30030 June 1993 Semiannual Radioactive Effluent Release Rept Jan-June 1993. ML18010B0601992-12-31031 December 1992 1992 Statistical Summary Rept for Shearon Harris Nuclear Power Plant,Unit 1, Per 10CFR20.407.W/930312 Ltr ML18010B0821992-12-31031 December 1992 Annual Environ (Non-Radiological) Operating Rept. W/930430 Ltr ML18010B0831992-12-31031 December 1992 Radiological Environ Operating Rept,1992 for Shearon Harris Nuclear Power Plant. W/930429 Ltr ML18010B0181992-12-31031 December 1992 Semiannual Radioactive Effluent Release Rept,Jul-Dec 1992. W/930224 Ltr ML18010A7291992-06-30030 June 1992 Semiannual Radioactive Effluent Release Rept,Jan-June 1992. W/920827 Ltr ML18010A5451991-12-31031 December 1991 Semiannual Radioactive Effluent Release Rept for Jul-Dec 1991. ML18010A5341991-12-31031 December 1991 Annual Personnel Monitoring Rept for Shearon Harris Nuclear Power Plant for 1991. W/920218 Ltr ML18010A5491991-12-31031 December 1991 Personnel & Man-Rem by Work & Job Function for 1991. W/ 920224 Ltr ML18010A6111991-12-31031 December 1991 Radiological Environ Operating Rept 1991,Harris Nuclear Project. ML18010A6141991-12-31031 December 1991 Radiological Environ Operating Rept,Vol III,Jul-Dec 1991 Sample Analyses Data. ML18010A6151991-12-31031 December 1991 Annual Environ (Nonradiological) Operating Rept,1991. W/920424 Ltr ML18010A6301991-12-31031 December 1991 Amended Shearon Harris Annual Operating Rept for 1991. ML18010A3731991-06-30030 June 1991 Semiannual Radioactive Effluent Release Rept,Jan-June 1991. W/910830 Ltr ML18010A6131991-06-30030 June 1991 Radiological Environ Operating Rept,Vol II,Jan-June 1991, Sample Analyses Data. ML18022A8151990-12-31031 December 1990 Annual Radiological Environmental Monitoring Rept for 1990. W/910422 Ltr ML18009A8221990-12-31031 December 1990 Semiannual Radioactive Release Rept,Jul-Dec 1990. W/910227 Ltr ML18009A8751990-12-31031 December 1990 Annual Environ (Nonradiological) Operating Rept for 1990. W/910422 Ltr ML18009A6371990-06-30030 June 1990 Semiannual Radioactive Effluent Release Rept Jan-June 1990. W/900830 Ltr ML18009A5131989-12-31031 December 1989 Annual Environ (Nonradiological) Operating Rept for 1989. W/900430 Ltr ML18009A4981989-12-31031 December 1989 Radiological Environ Operating Rept,Vol III,Jul-Dec 1989, Sample Analyses Data. 1998-12-31
[Table view] Category:TEXT-ENVIRONMENTAL REPORTS
MONTHYEARML18016A8211998-12-31031 December 1998 Number of Personnel & Man-Rem by Work & Job Functions, 1998,Harris Plant. with 990218 Ltr ML18016A9271998-12-31031 December 1998 1998 Annual Radiological Environ Operating Rept for Harris Nuclear Plant. with 990428 Ltr ML18016A9291998-12-31031 December 1998 Shnpp Unit 1 Annual Environ (Nonradiological) Operating Rept for Jan-Dec 1998. with 990428 Ltr ML18016A9331998-12-31031 December 1998 Annual Radioactive Effluent Release Rept for Jan-Dec 1998. ML18016B0191998-12-31031 December 1998 Corrected Pages to Annual Radioactive Effluent Release Rept, for 1998 for HNP ML18016A3301997-12-31031 December 1997 1997 Annual Operating Rept of Individuals Receiving Exposures Greater than 100Mr/Yr. W/980226 Ltr ML18016A4071997-12-31031 December 1997 Annual Environ (Nonradiological) Operating Rept,App B for 970101-1231. W/980427 Ltr ML18016A4081997-12-31031 December 1997 Radiological Environ Operating Rept for 1997. W/980428 Ltr ML18016A4121997-12-31031 December 1997 Annual Radioactive Effluent Release Rept for Jan-Dec 1997. ML18022B0141996-12-31031 December 1996 Annual Radioactive Effluent Release Rept 960101-1231. W/970414 Ltr ML18012A5401996-12-31031 December 1996 Numbers of Personnel & Man-Rem by Work & Job Function,1996 Harris Plant. W/970227 Ltr ML18012A6381996-12-31031 December 1996 Annual Environ (Non-Radiological) Operating Rept,App B for 960101-1231. W/970428 Ltr ML18012A7541996-12-31031 December 1996 Radiological Environ Operating Rept for Shearon Harris Nuclear Power Plant,Jan-Dec 1996. ML18012A7771996-12-31031 December 1996 Annual Radiological Environ Operating Rept for 1996. W/ 970428 Ltr ML18012A4201996-11-11011 November 1996 NPDES Noncompliance Notification:On 960930,exceeded Daily Max Limit & Monthly Average Limit of BOD5 During Reporting Period.Caused by Reduction in Chlorine Contact Time.Reviewed Operational Procedures ML18012A4281996-10-31031 October 1996 NPDES Discharge Monitoring Rept for Oct 1996 for Perry Nuclear Power Plant. W/961115 Ltr ML18012A1931996-03-29029 March 1996 NPDES Noncompliance Notification:On 960326 Internal Audit Identified Concern W/Sampling Frequency for Fecal Coliform at Heec Outfall.Investigation in Progress & Upon Completion Results Will Be Communicated ML18012A1471995-12-31031 December 1995 Number of Personnel & Man-Rem by Work & Job Function,1995. W/960221 Ltr ML18012A2401995-12-31031 December 1995 Annual Environ (Nonradiological) Operating Rept,App B for Jan-Dec 1995. W/960430 Ltr ML18012A2391995-12-31031 December 1995 Annual Radioactive Effluent Release Rept Jan-Dec 1995. W/ 960430 Ltr ML18012A2341995-12-31031 December 1995 1995 Annual Radiological Environ Operating Rept,Vols I- Iii. W/960429 Ltr ML18011B0251995-09-13013 September 1995 NPDES Noncompliance Notification:On 950908,discovered Zinc Concentrations of Approx 3 Ppm in Cooling Tower Blowdown Discharge.Caused by Decrease in Ph of Cooling Tower Water. Cause of Ph Change Being Investigated ML18022A9601994-12-31031 December 1994 Annual Environ (Nonradiological) Operating Rept for Jan -Dec 1994. W/ 950421 Ltr ML18022A9541994-12-31031 December 1994 Radiological Environ Operating Rept, Vols I,Ii & Iii.W/ 950421 Ltr ML18011B0801994-12-31031 December 1994 Revised Semi-Annual Effluent Release Rept for Period of Jul-Dec 1994. ML18011A8021994-12-31031 December 1994 Semiannual Radioactive Release Rept Jul-Dec 1994. ML18011A7961994-12-31031 December 1994 Annual Operating Rept, Consisting of Info Re Number of Individuals Receiving Exposures Greater than 100 Mrem/Yr, Primary Coolant Iodine Spikes & Challenges to PORVs & Safety Valves for 1994.W/950223 Ltr ML18011A5571994-06-30030 June 1994 Semiannual Radioactive Effluent Release Rept for Jan-June 1994. ML18011A3571993-12-31031 December 1993 Annual Operating Rept for 1993, Including Number of Personnel & man-rem by Work & Job Function,Primary Coolant Iodine Spikes & Primary Relief & Safety Valve challenges.W/940225 Ltr ML18011A3591993-12-31031 December 1993 Semiannual Radioactive Effluent Release Rept Jul-Dec 1993. W/940228 Ltr ML18011A4041993-12-31031 December 1993 Vols 1,2 & 3 of Radiological Environ Operating Rept 1993. ML18011A4241993-12-31031 December 1993 Shnpp Unit 1 Annual Environ (Nonradiological) Operating Rept,App B,Jan-Dec 1993. W/940428 Ltr ML18011A1171993-06-30030 June 1993 Semiannual Radioactive Effluent Release Rept Jan-June 1993. ML18010B0831992-12-31031 December 1992 Radiological Environ Operating Rept,1992 for Shearon Harris Nuclear Power Plant. W/930429 Ltr ML18010B0821992-12-31031 December 1992 Annual Environ (Non-Radiological) Operating Rept. W/930430 Ltr ML18010B0601992-12-31031 December 1992 1992 Statistical Summary Rept for Shearon Harris Nuclear Power Plant,Unit 1, Per 10CFR20.407.W/930312 Ltr ML18010B0181992-12-31031 December 1992 Semiannual Radioactive Effluent Release Rept,Jul-Dec 1992. W/930224 Ltr ML18010A7291992-06-30030 June 1992 Semiannual Radioactive Effluent Release Rept,Jan-June 1992. W/920827 Ltr ML18010A5491991-12-31031 December 1991 Personnel & Man-Rem by Work & Job Function for 1991. W/ 920224 Ltr ML18010A6301991-12-31031 December 1991 Amended Shearon Harris Annual Operating Rept for 1991. ML18010A6111991-12-31031 December 1991 Radiological Environ Operating Rept 1991,Harris Nuclear Project. ML18010A5341991-12-31031 December 1991 Annual Personnel Monitoring Rept for Shearon Harris Nuclear Power Plant for 1991. W/920218 Ltr ML18010A6141991-12-31031 December 1991 Radiological Environ Operating Rept,Vol III,Jul-Dec 1991 Sample Analyses Data. ML18010A6151991-12-31031 December 1991 Annual Environ (Nonradiological) Operating Rept,1991. W/920424 Ltr ML18010A5451991-12-31031 December 1991 Semiannual Radioactive Effluent Release Rept for Jul-Dec 1991. ML18010A3731991-06-30030 June 1991 Semiannual Radioactive Effluent Release Rept,Jan-June 1991. W/910830 Ltr ML18010A6131991-06-30030 June 1991 Radiological Environ Operating Rept,Vol II,Jan-June 1991, Sample Analyses Data. ML18009A8811991-04-29029 April 1991 NPDES Noncompliance Notification:On 910310,bldg Sewage Collection Tank Pump Discovered to Be de-energized During Electrical Bus Outage.Caused by Inoperable Pump.Personnel to Refrain from Using Rest Rooms Until Power Restored ML18009A8751990-12-31031 December 1990 Annual Environ (Nonradiological) Operating Rept for 1990. W/910422 Ltr ML18009A8221990-12-31031 December 1990 Semiannual Radioactive Release Rept,Jul-Dec 1990. W/910227 Ltr 1998-12-31
[Table view] |
Text
~ PRIORI"I Y Z ~
REGULATORY'$HQFISA fB&M86TION SYSTEM (RIDS)
ACCESSION NBR:9503020256 DOC.DATE: ~~~
FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina NOTARIZED: NO DOCKET 05000400 AUTH. NAME AUTHOR AFFILIATION ROBINSOR,W.R. Carolina Power & Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
"Annual Operating Rept," consisting of info re number o". F individuals receiving exposures greater than 100 mrem/yr, primary coolant iodine spikes & challenges to PORVs & F safe" y valves for 1994.Wi~50~22 ltr.
I DISTRIBUTION CODE: IE56D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: 20.407 Annual Personnel Monitoring Rpt/Annual Rad Exposure Rpt by Fun NOTES:Application for permit renewal filed. 05000400 F
RECIPIENT COPIES RECIPIENT COPIES 1D CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 0 LE,N 1 1 INTERNAL: ACNW 6 6 FILE NTER 02 1 1 NMSS/SCDB/SSSS 1 1 RR7DRSS PRPB 2 2 RES/RPHEB 1 1 RGN2 01 1 1 EXTERNAL: LITCO BRYCEiJ H 1 1 NOAC 1 1 NRC PDR 1 1 iOTE TOALL "RIDS" RECIPIENTS:
DIS'I'Rl!If "I'IOi I.ISTS I'OR DOC!.'ilEi'I'S YOL'Oi i
PLEASE I IELP I.'S TO RLDI;CE '6:KSTE! CONTACT TI IE DOCL'i!Ei'TCOi'TROL iI "I'EED!
if DESK, ROOi I P I .37 ( EX I: 504.2IN3 ) TO F L I I ATE YOI.'R YA E F ROTI TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 16
I-Carolina Power & Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant FEB 2 ~ 1995 File: HO-950132 Serial: HNP-95-018 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 ANNUALOPERATING REPORT - 1994 Gentlemen:
In accordance with Technical Specification 6.9.1.2 for the Shearon Harris Nuclear Power Plant, Carolina Power & Light Company herewith submits the annual report of (a) individuals receiving exposures greater than 100 mrem/yr and their associated man-rem exposure according to work and job functions, (b) primary coolant iodine spikes, and (c) challenges to the pressurizer power-operated relief valves (PORVs) and safety valves for 1994.
Questions regarding this submittal may be referred to Mr. D. C. McCarthy at (919) 362-2100.
Sincerely, W. R. Robinson MGW:mgw Attachments c: Mr S. D. Ebneter (NRC-RII)
Mr S. A. Elrod (NRC-SHNPP)
Mr N. B. Le (NRR)
Ms C. T. Raddatz (NRC-REIRS Project Manager) 9503020256 941231 PDR ADOCK 05000400 R PDR State Road 1134 New Hill NC Tel 919362-2502 Fax 919362-6950
Attachment to HNP-95-018 Page 1 of 3 RIMS ZI NUMBER OF PERSONNEL AND MAN-REM BY WORK'ND JOB FUNCTION, 1994 HARRIS PLANT NUMBER OF PERSONNEL > 100 MREM I TOTAL MAN-REM WORK AND JOB FUNCTION STAT UTIL CNTR I STAT UTIL CNTR REACTOR OPERATIONS AND SURVEILLANCE MAINTENANCE PERSONHEL 3 1 1.267 0.015 1.220 OPERATING PERSONNEL 18 0 5.468 0.000 0.669 HEALTH PHYSICS PERSONNEL 23 15 5.825 0.000 5.395 SUPERVISORY PERSONNEL 0 0 0.326 0.071 6.019 ENGINEERING PERSONNEL 1 0 1.239 0. 323 0.392 ROUTINE MAINTENANCE MAINTENANCE P ERSONHEL 23 1 94 8.078 0.885 30.834 OPERATING PERSONNEL 1 0 0 0. 207 0.000 0. 126 HEALTH PHYSICS PERSONNEL 7 0 21 3 .252 0.006 5.291 SUPERVISORY PERSONNEL 2 0 0 0.415 0.012 6. 124 ENGINEERING PERSONNEL 3 0 54, 1. 171 0. 100 27. 173 INSERVICE INSPECTION MAIttTENANCE P ERSONNEL 0 1 5 8.234 0.213 1.559 OPERATING PERSONNEL 0 0 0 0. 159 0.060 0.019 HEALTH PHYSICS PERSONNEL 0 0 0 8.206 0.600 8.314 SUPERVISORY PERSONNEL 8 8 0 8.001 0.000 0.000 ENGINEERING PERSONNEL 0 0 19 0.414 0.082 6.220 SPECIAL MAINTENANCE MAINTENANCE PERSONNEL 21 6 33 6.578 0.042 8.707 OPERATING PERSONNEL 1 0 0 0.294 0.080 0.024 HEALTH PHYSICS PERSONNEL 18 0 15 2.571 0.000 4.294 SUPERVISORY PERSONNEL 8 0 0 0.080 0.800 0.016 ENGINEERING PERSONNEL 1 8 12 0.390 0.014 2,844 WASTE PROCESSING MAINTENANCE PERSONNEL 0 6 0.001 0.000 0.277 OPERATING PERSONNEL 0 0 0.007 0.000 0.000 HEALTH PHYSICS PERSONNEL 2 0 0.601 0.000 0.015 SUPERVISORY PERSONNEL 0 0 0.000 0.060 0.000 ENGINEERING PERSONNEL 0 8 0.000 0.000 0.031 REFUELING MAINTEHANCE PERSONNEL 29 5 145 8.765 1.431 48.592 OPERATING PERSONNEL 3 0 0 1.391 0.000 8.011 HEALTH PHYSICS PERSONNEL 4 0 12 1.458 0.800 3 .758 SUP ERVZSORY PERSONNEL 1 0 0 0. 152 0.040 8. 129 ENGIHEERING PERSONNEL 2 1 49 . 0.838 0.450 18.018 TOTAL MAINTENANCE PERSONNEl 76 7 278 . 24.915 2.586 91. 189 OPERATING PERSONNEL 23 0 0 7.526 0.000 0.849 HEALTH PHYSICS PERSONNEL 46 0 63 13.913 0.668 19.867 SUPERVISORY PERSONNEL 3 0 0 0.974 0. 123 0.288 ENGINEERING PERSONNEL 7 1 134 4.052 0.889 54.678 GRAND TOTAL 155 8 475 51.388 3.598 166.071 Notes: (1) Dose based on pocket dosimeters and electronic dosimeters (2) Stat = Harris Plant Staff Util = CP&L non-Harris personnel Cntr = Contractor (3) Special Maintenance includes special work on spent fuel cask, seal table room equipment and certain valves and pumps
1 Attachment to HNP-95-018 Page 2 of 3 1994 ANNUALREPORT - PRIMARY COOLANT IODINE SPIKES During 1994, the primary coolant did not exceed 1.0 pCi/gram dose equivalent I-131 or 100/E-bar pCi/gram gross radioactivity as set forth in Technical Specification 3.4.8.
Attachment to HNP-95-018 Page 3 of 3 1994 ANNUALREPORT - PRESSURIZER RELIEF AND SAFETY VALVECHALLENGES During 1994, there were no challenges to the pressurizer power operated relief valves (PORVs) or safety valves.