Text
Document Control'esk Page 2
R IMS II NUM8ER OF PERSONNEL ANO MAN-RKM 8Y WORK ANO JOQ
- FUNCTION, 1991
&ARRIS PLANT NUM8ER OF PERSONNEL 100 MREM TOTAL MAN REM WORK ANO J08 FUNCTION STAT,, UTIL CNTR.
I STAT UTIL CNTR REACTOR OPERATIONS ANO SURVEILLANCE MAINTENANCE PERSONNE 3
OPERATING PERSONNEL 22 HEALTH PHYSICS PERSONNEL 21 SUPERVISORY PERSONNEL 0
ENGINEERING PERSONNEL 2
ROUTINE MAINTENANCE MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYS'ICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL 0
I 0
2 0
52 0
0 0
0 1
31 0
1 0
1 0
0 0
0
- 0. 740
- 6. 092
- 7. 568
- 0. 141
- 1. 949 1.841 0.026 0.650 a'.a25
- 0. 157
- 0. 001 0.000 0.000 0.000 0.425 0.725 0.000 0.000 0.000 0.030 0.506 1.vva 12.990 0.036 0.603 12 ~ 217 0 ~ 259 0.915 0.000 0.282
'W INSERVICE INSPECTION MAINTENANCE. PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL SPECIAL MAINTENANCE MAINTENANCE PERSONNEL.
OPERATING PERSONNEt.
HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNFL 0
0 1
0 0
0 0
0 0
0 40 6
14 0
13 0
1, 0
13 0
'0 2
a 0
0 85 0
29 0
59 0.086 0.287 0.061 0 ~ 000 0.050 19.
977'5.386
- 7. 676
- 0. 559.
- 5. 236
- 0. 150 0.000 0.000 0.000 0.000 1
2'56 0.000 0.000 0.000 0 ~ 119 o.o4o 0.480
- 0. 173 0.000 0.000 31 521 0.335, 10.00?
0.010 37.231 WASTE. PROCESSING MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS. PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL 2'
0 0
.0 0
5 0
0 0
0 1
0 1
1.
030'.020 2.390 o.ooa
- 0. 143 0 ~ 030.
0.000 0.005 0.000 0.000'.
165 0.000 0.680 0.000 0 215 REFUELING MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL.
ENGINEERING PERSONNEL 24 0
7" 07, 13 96 0
0 0
24 0
0 1
42 12.453
- 1. 177 2.
635'.
150
..2. 769 5.920 0.000 0.000 0.030 0.425 39.264 0.000
- 7. 315 0.350 24.350 TOTAL MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL 69 20 213 37 0
5 49 0
107 a
o 23
'1 102
- 36. 127 12.988 20.980 a.ev5 10.304 9.582 0.000, 0.005 0.030
- 0. 999.
83 713 2 844 32 080 0.396 62.681 GRANO TOTAL 179 21 427 y
81
~ 274
- 10. 616
'1 8 1 ~ 714 NOTES:
(1)
(2)
Dose based on pocket dosimeters Stat - Harris Plant Staff Util CP&L non-Harris personnel Cntr - Contractor 9205130203
'F20506 PDR ADQCK 05000400 R
PDR MEM/HO-920090/2/OS1
I
Document Control Desk Page 3
During 1991, the primary coolant did not exceed 1.0 pCi/gram dose equivalent I-131 or 100/E-bar pCi/gram gross radioactivity as set forth in Technical Specification 3.4.8.
I HEM/HO-920090/3/OS1
JI
Document Control Desk Page 4
1991 ANNUAL REPORT
- PRIMARY SAFETY AND RELIEF VALVE CHALLENGES On May 16,
- 1991, a
low temperature, overpressure (LTOP) event occurred with the plant in Mode 5 while the Reactor Coolant System (RCS) was being operated under solid water conditions.
The actuation of the LTOP system resulted from a pressure transient induced by the start of a Reactor Coolant Pump during RCS degassing.
The LTOP system actuated as required.
RCS pressure reached the 390 psig setpoint for primary power operated relief valve (PORV)
PCV-445A and the pressure transient was reliev'ed sufficiently such that the backup PORV with a setpoint of 400 psig was not challenged.
(Special Report dated June 14, 1991)
MEM/HO-920090/4/OS1