ML110260442

From kanterella
Revision as of 00:22, 11 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
2010 Monticello Nuclear Generating Plant Initial License Examination Operating Test Comments
ML110260442
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 12/17/2010
From: Mcneil D
Operations Branch III
To:
Northern States Power Co, Xcel Energy
References
Download: ML110260442 (1)


Text

2010 MNGP ILT EXAMINATION OPERATING TEST COMMENTS Admin JPM e (SRO) Update performance step 3 to be critical and be more specific on the standard.

Changed step to critical and specified the standard to include using the correct side of the EAL Board for the plant Mode. CR JPM aFor performance step 3 on page

5 - update the evaluator cue for the correct suction pressure.

Updated to 5 psig.

CR JPM d For Performance Step 5 add a range of gains that is expected for the candidates to enter.

Added range of 2.44

-2.56 CR JPM e For initial conditions state that maintenance was performed on channel A1 for performance plausibility.

Added For performance step 15 add an evaluator cue to state SPDS reads 20 mr/hr.

Added CR JPM h Update candidate turnover sheet with instructor turnover sheet. Updated In-Plant JPMsNo comments on the In

-Plant JPMs Simulator CommentsThe comments for the dynamic simulator scenarios were only minor in nature, such as typographical errors and were not individually tracked. No significant changes were made.