MONTHYEARML15196A0292015-07-0606 July 2015 Termination of Quality Assurance Program Approval for Radioactive Material Packages No. 0348 ML15112A0832015-04-14014 April 2015 Amendment No. 12 to Indemnity Agreement No. E-24 University of Michigan Ford Nuclear Reactor ML14310A5882015-04-0202 April 2015 Ford License Termination Letter - Termination of Facility Operating License No. R-28 for the University of Michigan Ford Nuclear Reactor ML15030A3112015-01-22022 January 2015 Analytical Results for University of Michigan Soil ML15020A7252015-01-16016 January 2015 University of Michigan, Ford Nuclear Reactor, Storage Ports Soil Sample Results ML15029A5102015-01-14014 January 2015 University of Michigan, Ford Nuclear Reactor, Report on Reactor. Operations ML14099A1072014-03-28028 March 2014 Report on Reactor Operations University of Michigan Ford Nuclear Reactor ML14063A2072014-02-26026 February 2014 University of Michigan, Request for Termination of the Ford Nuclear Reactor ML13360A1802013-12-23023 December 2013 University of Michigan Ford Reactor Master Inspection Plan IR 05000002/20120022013-10-0404 October 2013 IR 05000002-12-002(DNMS), on 09/11/2013, University of Michigan Ford Reactor Inspection Report ML13235A0092013-08-19019 August 2013 University of Michigan, Ford Nuclear Reactor, Submittal of Final Status Survey - Background Count Rate Correction ML13205A1532013-07-11011 July 2013 University of Michigan - Ford Nuclear Reactor: Final Status Survey Report (Cover Letter) ML13051A0472013-02-14014 February 2013 University of Michigan - Ford Nuclear Reactor, Reportable Occurrence #24, Reactor Building Flood - Ruptured Fire Suppression Line, Technical Specification (Section 1.0 / Item 8) ML13029A5002013-01-24024 January 2013 University of Michigan, Submittal of 2012 Report on Reactor Operations ML12356A1352012-12-18018 December 2012 MIP- University of Michigan Ford Reactor Master Inspection Plan CY2013 ML13028A1012012-12-11011 December 2012 University of Michigan, Technical Specification Amendment Request Final Status Survey - Survey Design Package for Fnr Foundation Cavity ML12312A1302012-11-0202 November 2012 Ford Nuclear Reactor, Technical Specification Amendment Request Decommissioning Plan - Revised Section 4.5.10.6 (Final Status Survey) ML12293A3022012-10-25025 October 2012 T. Alexander Ltr. Approval of Partial Final Site Survey Plan for University of Michigan Ford Nuclear Reactor IR 05000000/20120012012-10-10010 October 2012 IR 0500000-12-001, 9/11/2012, University of Michigan - Ford Nuclear Reactor ML12264A0642012-09-18018 September 2012 University of Michigan - Ford Nuclear Reactor Final Disposition of Fnr Storage Ports ML12264A5622012-09-17017 September 2012 University of Michigan - Ford Nuclear Reactor, Quality Assurance Plan for Final Status Survey Plan ML12199A0182012-07-13013 July 2012 University of Michigan, Request an Amendment to the Ford Nuclear Reactor Technical Specification Decommissioning Plan - Revised Section 4.0 (Final Status Survey ML12157A2662012-06-0101 June 2012 Ford Nuclear Reactor - Technical Specification Amendment Request Decommissioning Plan - Revised Section 4.0 (Final Status Survey) ML12117A1182012-04-20020 April 2012 Occupational Safety & Environmental Health ML12124A3102012-04-20020 April 2012 University of Michigan, Report on Reactor Operations for January 1 to December 31, 2011 ML12095A3782012-02-14014 February 2012 University of Michigan Ltr Ford Nuclear Reactor- Decommissioning Plan- Additional Information for Section 4.0 (Final Status Survey Plan) Docket 50-2/ License R-28 ML12025A1252012-01-20020 January 2012 Ford Nuclear Reactor - Technical Specification Amendment Request Decommissioning Plan - Revised Section 4.0 (Final Status Survey) ML1132606162011-11-21021 November 2011 IR 05000002-11-001; 08/09/2011, University of Michigan, Reply to a NRC Inspection Report Notice of Violation IR 05000002/20110012011-10-24024 October 2011 IR 05000002-11-001 and Notice of Violation, on 08/09-11/2011 - 10/12/2011, Univ of Mi Ford Nuclear Reactor ML11273A0262011-09-29029 September 2011 Fy 2012 University of Michigan Ford Nuclear Reactor Master Inspection Plan ML1124208522011-08-23023 August 2011 Orise Contract No. DE-AC05-06OR23100 Letter Report for Analytical Results for Three Soil Samples from the University of Michigan Ford Reactor, Ann Arbor, Michigan ML11199A0092011-07-12012 July 2011 Ford Nuclear Reactor - Technical Specification Amendment Request Decommissioning Plan - Revised Section 4.0 (Final Status Survey Plan) (Response to NRC Comments Dtd June 1, 2011 on Initial Fnr - Technical Specification Amendment Submitted A IR 05000002/19500112011-04-29029 April 2011 Notification of Licensed Operator Initial Examination 05000250-11-3002,05000251-11-302 ML11119A0042011-04-0808 April 2011 Ford Nuclear Reactor - Technical Specification Amendment Request Decommissioning Plan - Revised Section 4.0 (Final Status Survey Plan) IR 05000002/20090032011-03-24024 March 2011 IR 05000002-09-003, on 09/14-16/2010, In-office Review Through 03/14/2011, University of Michigan - Ford Nuclear Reactor ML1104101322011-02-14014 February 2011 Change in NRC Staff Project Management for the University of Michigan Ford Nuclear Reactor ML1032300972010-11-17017 November 2010 Oak Ridge Institute for Science and Education (Orise) Letter Report for Four Soil Samples from the University of Michigan Ford Reactor (IR 05000002/2009003) ML1027803212010-10-0101 October 2010 MIP- University of Michigan Ford Nuclear Reactor Fiscal Year 2011 IR 05000002/19600102010-02-0909 February 2010 Notification of Licensed Operator Initial Examination - 05000259-10-301, 05000260-10-0301, 05000296-10-301 ML0935210582009-12-17017 December 2009 Mip - University of Michigan Ford Nuclear Reactor-FY 2010 IR 05000002/20200902009-12-0404 December 2009 IR 05000220-090-10 and 05000410-09-010; Nine Mile Point Nuclear Station, LLC; on 10/5-22/2009; Nine Mile Point Nuclear Station, Units 1 and 2; Biennial Baseline Inspection of Identification and Resolution of Problems Report ML0931305262009-11-20020 November 2009 October 23, 2009 Summary of Open Meeting with the University of Michigan to Discuss Decommissioning Status of Ford Nuclear Reactor IR 05000002/19640092009-07-0909 July 2009 IR 05000264-09 on 06/22/09 - 06/26/09 for Dow Chemical Co IR 05000002/20090022009-06-19019 June 2009 IR 05000002-09-002 on 03/24/09 and 06/01/09 - 06/02/09 for Univ of Michigan - Ford Nuclear Reactor ML0915505952009-06-0101 June 2009 Orise, Letter Report for Analytical Results for Two Soil Samples and One Concrete Sample from the Ford Reactor at the University of Michigan, Ann Arbor, Mi IR 05000002/19772782009-01-0606 January 2009 EA-08-298, Peach Bottom - Notice of Violation with Proposed Imposition of Civil Penalty - $65,000 (Peach Bottom Atomic Power Station - NRC Investigation Report No. 1-2008-001 and NRC Inspection Report Nos. 05000277-278/2007404; and 05000277 IR 05000002/20090012008-12-23023 December 2008 IR 05000002-09-01 on 12/10/08 - 12/11/2008 for Ford Nuclear Reactor; (DNMS) ML0829806362008-10-22022 October 2008 University of Michigan Ford Nuclear Reactor Master Inspection Plan - Fiscal Year 2009 IR 05000002/20080012008-09-25025 September 2008 IR 05000002-08-01 (DNMS) on 08/28/08 for Ford Nuclear Reactor, Univ. of Michigan IR 05000002/20070012007-12-0606 December 2007 IR 05000002-07-001, on 06/28/2007 & 11/13-14/2007, Univ. of Michigan - Ford Nuclear Reactor Inspection 2015-07-06
[Table view] |
Text
October 25, 2012
Mr. Terrance G. Alexander, Executive Director Occupational Safety & Environmental Health
University of Michigan Campus Safety Services Building 1239 Kipke Drive Ann Arbor, MI 48109-1010
SUBJECT:
APPROVAL OF PARTIAL FINAL SITE SURVEY PLAN FOR THE UNIVERSITY OF MICHIGAN FORD NUCLEAR REACTOR
Dear Mr. Alexander:
The University of Michigan Ford Nuclear Reactor (FNR) Decommissioning Plan (DP) was approved with a license condition requiring the licensee to submit a Final Status Survey (FSS) Plan, as revision to the DP, for NRC review and approval prior to performing FSS work.
In an October 23, 2009 meeting between NRC and University of Michigan staff (ML093130526),
a plan was developed for completing the FNR FSS Plan as a revision to the DP. In letters dated April 8, 2011, (ML11119A004), July 12, 2011, (ML11199A009), January 20, 2012 (ML12025A125), February 14, 2012 (ML120950629), June 1, 2012 (ML12157A266), July 13, 2012 (ML12199A018), September 17, 2012 (ML12264A562), and September 18, 2012 (ML12276A199), you requested approval of a partial FSS Plan. Additional site characterization information for the FNR was provided as part of the February 14, 2012 submittal (ML12095A385, ML12095A386, ML12095A383, ML12095A384, ML12095A387, ML12095A381, and ML12095A380).
NRC staff has reviewed your partial FSS Plan s ubmittal and have determined that it adequately addresses staff questions, subject to the following comment: FSS Plan details are still needed for the three subsurface areas: (1) the below-grade foundation drain tile system location outside the FNR on the east side of the building; (2) the FNR foundation cavity beneath the FNR southwest freight door; and (3) the below-grade area former storage ports location on the west side of the building. In order to ensure special situation FSS plans are reviewed by NRC staff, the last sentence of paragraph 4.5.10.6 of the FSS Plan is modified as follows:
Where such special situations are encountered, survey approaches and evaluation methods will be developed on a case by case basis, described in the survey design package and submitted to NRC for approval prior to conducting special situation final status surveys.
Please provide a revised FSS with this new language within 30 days of receipt of this letter.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice for Domestic Licensing Proceedings and Issuance of Orders," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
T. Alexander 2
If you have any questions regarding this letter, please contact me at 301-415-6721 or Theodore.Smith@nrc.gov.
Sincerely,
/RA/ Theodore B. Smith, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-02 License No.: R-28
cc: University of Michigan -
Ford Nuclear Reactor Service List T. Alexander 2
If you have any questions regarding this letter, please contact me at 301-415-6721 or Theodore.Smith@nrc.gov.
Sincerely,
/RA/ Theodore B. Smith, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-02 License No.: R-28
cc: University of Michigan -
Ford Nuclear Reactor Service List
DISTRIBUTION
- DURLD r/f JTapp CLipa SGiebel
ML12293A302 Office DWMEP:PM DWMEP:LA DWMEP:BC DWMEP:PM Name TSmith CHolston BWatson TSmith Date 10/18/12 10/25/12 10/18/12 10/25/12 OFFICIAL RECORD COPY
University of Michigan - Ford Nuclear Reactor Service List cc:
Mr. Mark L. Driscoll, Radiation Safety Officer Occupational Safety & Environmental Health
University of Michigan Campus Safety Services Building 1239 Kipke Drive Ann Arbor, Michigan 48109-1010
Dr. Mark M. Banaszak Holl, Ph.D., Associate Vice President Office of Vice President for Research, Natural Science and Engineering Fleming Building / Room 4079 503 Thompson
Ann Arbor, Michigan 48109-1340
Mr. Curt W. Smitka, Director Budget & Administration Office of Vice President for Research
Fleming Building / Room 4056
503 Thompson
Ann Arbor, Michigan 48109-1340
Mr. Robert B. Blackburn, Manager Ford Nuclear Reactor - Decommissioning Project Phoenix Memorial Laboratory / Room 3034 2301 Bonisteel Boulevard
Ann Arbor, Michigan 48109-2100 Special Assistant to the Governor
Office of the Governor Room 1 - State Capitol
Lansing, MI 48909
Michigan Department of Environmental Quality Waste and Hazardous Materials Division Hazardous Waste and Radiological Protection Section Nuclear Facilities Unit, 525 West Allegan Street P.O. Box 30241 Lansing, MI 48909-7741
Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center
Gainesville, FL 32611