Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement
|
MONTHYEARL-2010-302, License Amendment Request for Extended Power Uprate2010-12-15015 December 2010 License Amendment Request for Extended Power Uprate Project stage: Request ML1107302822011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 2; Supplemental Environmental Report Project stage: Supplement ML1105906632011-03-0909 March 2011 Acceptance for Review of License Amendment Request for Extended Power Uprate Project stage: Acceptance Review ML1110100982011-04-19019 April 2011 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI NRC-2011-0128, St. Lucie, Unit 1 - Notice of Consideration of Issuance of Amendment to Facility Operating License, and Opportunity for a Hearing and Order Imposing Procedures for Documents Access to Sensitive Unclassified Nonsafeguards Information2011-06-0202 June 2011 St. Lucie, Unit 1 - Notice of Consideration of Issuance of Amendment to Facility Operating License, and Opportunity for a Hearing and Order Imposing Procedures for Documents Access to Sensitive Unclassified Nonsafeguards Information Project stage: Approval ML11119A0852011-06-0202 June 2011 Notice of Consideration of Issuance of Amendment to Facility Operating License, and Opportunity for a Hearing and Order Imposing Procedures for Documents Access to Sensitive Unclassified Nonsafeguards Information Project stage: Other ML11119A0842011-06-0808 June 2011 Transmittal Letter - Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing and Order Imposing Procedures for Document Access to Sensitive Unclassified Non Safeguards Information Project stage: Other ML12037A1472011-07-21021 July 2011 NRR E-mail Capture - Efh Species for St. Lucie Project stage: Request ML1123602302011-09-0202 September 2011 Request for Concurrence on List of Species with Essential Fish Habitat in the Vicinity of the St. Lucie Plant, Units 1 and 2 Project stage: Other L-2011-397, Unusual or Important Environmental Event - Reportable Fish Kill2011-09-20020 September 2011 Unusual or Important Environmental Event - Reportable Fish Kill Project stage: Request L-2011-410, Environmental Protection Plan Report 316(b) Related Documentation2011-09-30030 September 2011 Environmental Protection Plan Report 316(b) Related Documentation Project stage: Request L-2011-450, Submittal of Final Revised Industrial Wastewater Facility Permit No. FL0002208, and Environmental Protection Plan Report2011-10-20020 October 2011 Submittal of Final Revised Industrial Wastewater Facility Permit No. FL0002208, and Environmental Protection Plan Report Project stage: Request ML11332A0202011-12-28028 December 2011 Transmittal Letter - Draft Environmental Assessment and Draft Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Draft Other ML11332A0212011-12-28028 December 2011 Federal Register Notice - Draft Environmental Assessment and Draft Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Request L-2012-043, Comment (1) of Richard L. Anderson, on Behalf of Florida Power & Light, Regarding Draft Environmental Assessment and Draft Finding of No Significant Impact Related the Proposed Extended Power Uprate2012-01-30030 January 2012 Comment (1) of Richard L. Anderson, on Behalf of Florida Power & Light, Regarding Draft Environmental Assessment and Draft Finding of No Significant Impact Related the Proposed Extended Power Uprate Project stage: Draft Other ML12044A1272012-02-13013 February 2012 Comment (2) from Edward W. Johnson Opposing Ncr Permit Approval for St. Lucie 1 & 2 Project stage: Request ML12053A3452012-03-20020 March 2012 Request to Initiate Abbreviated Efh Consultation for Proposed Extended Power Uprate at St. Lucie Plant, Units 1 and 2 Project stage: Other L-2012-079, Supplemental Information for Extended Power Uprate License Amendment Request (LAR) Sections 2.1.7 (Protective Coating Systems) and 2.8.7.2 (Natural Circulation Cooldown)2012-03-22022 March 2012 Supplemental Information for Extended Power Uprate License Amendment Request (LAR) Sections 2.1.7 (Protective Coating Systems) and 2.8.7.2 (Natural Circulation Cooldown) Project stage: Supplement L-2012-199, Response to Request for Additional Information on Draft Environment Assessment and Draft Finding of No Significant Impact Related to the Proposed Extended Power Uprate2012-05-0202 May 2012 Response to Request for Additional Information on Draft Environment Assessment and Draft Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Draft Response to RAI ML12132A0672012-05-0202 May 2012 NRR E-mail Capture - FW: St. Lucie Unit 1 and 2 EPU - Draft EA RAI Responses Project stage: Draft RAI ML12144A0082012-05-21021 May 2012 NRR E-mail Capture - FW: NRC St Lucie Plant; NMFS Comments Project stage: Request ML12144A3162012-05-23023 May 2012 NRR E-mail Capture - Federal Consistency Review Regarding the Czma Project stage: Request ML12165A5122012-06-25025 June 2012 Federal Register - Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Request ML12165A5112012-06-25025 June 2012 Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Acceptance Review ML12191A2362012-07-0909 July 2012 Technical Specification Pages Project stage: Acceptance Review ML12156A2082012-07-0909 July 2012 Issuance of Amendment Regarding Extended Power Uprate Project stage: Approval ML12181A0192012-07-0909 July 2012 Issuance of Amendment Regarding Extended Power Uprate (Redacted) Project stage: Approval ML12194A2872012-07-12012 July 2012 Correction to Amendment No. 213 Regarding Extended Power Uprate Project stage: Other ML12195A1682012-07-13013 July 2012 Letters to H. Mueller, A. Hubbard, and S. Norton Re Environmental Assessment and Finding of No Significant Impact Related to Proposed Extended Power Uprate Project stage: Acceptance Review L-2012-309, FPL Review Comments on Extended Power Uprate Safety Evaluation2012-08-0707 August 2012 FPL Review Comments on Extended Power Uprate Safety Evaluation Project stage: Other L-2012-382, Extended Power Uprate Cycle 24 Startup Report2012-10-19019 October 2012 Extended Power Uprate Cycle 24 Startup Report Project stage: Other 2012-01-30
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000335/20250102024-10-21021 October 2024 Notification of St. Lucie Plant Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2025010 and 05000389/2025010 L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) ML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes 05000335/LER-2024-001, Unplanned Reactor Scram2024-09-25025 September 2024 Unplanned Reactor Scram IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-117, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review ML24172A1562024-06-27027 June 2024 Relief Request - PSL2-I5-RR-01 Proposed Alternative to Amse Code XI Code Examination Requirements - System Leakage Test of Reactor Pressure Vessel Bottom Head and Class 1 and 2 Piping in Covered Trenches L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports IR 05000335/20244012024-06-0303 June 2024 Security Baseline Inspection Report 05000335/2024401 and 05000389/2024401 ML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation IR 05000335/20240012024-05-10010 May 2024 Integrated Inspection Report 05000335/2024001 and 05000389/2024001 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report ML24108A0632024-04-18018 April 2024 – Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report ML24093A2612024-04-0202 April 2024 – Investigation Summary, Office of Investigations Case Number 2-2023-005 L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-045, Report of 10 CFR 72.48 Plant Changes2024-03-27027 March 2024 Report of 10 CFR 72.48 Plant Changes 2024-09-09
[Table view] |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555*0001 July 12, 2012 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power and Light Company P.O, Box 14000 Juno Beach, Florida 33408-0420 ST. LUCIE PLANT, UNIT 1 -CORRECTION TO AMENDMENT NO. 213 REGARDING EXTENDED POWER UPRATE (TAC NO. ME5091) Dear Mr. Nazar: On July 9,2012, the Nuclear Regulatory Commission issued Amendment No. 213 to Renewed Facility Operating License No. DPR-67 for the St. Lucie Plant, Unit No.1. This amendment was in response to your application dated November 22, 2010, as supplemented by letters dated February 25,2012, March 3, March 14, March 22, April 1 , April 21 , May 17, May 18, May 19 (three letters), May 24, May 27, May 31 (two letters), June 16, June 22, July 5, July 8, July 22, August 5, August 8, August 12, August 18, August 25 (two letters), August 31, September 2 (two letters), September 8 (two letters), September 22, September 23, September 27, September 29, September 30, October 10, October 14, October 20, October 21, October 27, October 31 (six letters), November 1, November 23, November 29, December 1, December 2, December 14, December 27,2011, January 2,2012, January 10, January 14, January 25, February 11, February 21, February 29 (three letters), March 6 (two letters), March 8, March 15, March 16, March 22, March 26, 2012. The amendment increased the licensed core power level for St. Lucie Unit 1 from 2070 megawatts thermal (MWt) to 3020 MWt. This represents a net increase in the core thermal power of approximately 11.85 percent, including a 10-percent power uprate and a 1.7-percent measurement uncertainty recapture, over the then current licensed thermal power level and is defined as an extended power uprate. After issuance, it became apparent that some pages were incorrect. License page 3 had not been updated with new maximum power level and a coefficient listed in Table 5.6-1 on page 5-6g had not been replaced with a corrected version.
M. Nazar -2 The corrected pages are enclosed. We regret any inconvenience this may have caused. If you have any questions regarding this matter, please call me at (301) 415-2788. Sincerely, Tracy J. Orf, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-335 Enclosure: Corrected Pages cc: Distribution via Listserv
-3 applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: A. Maximum Power Level FPL is authorized to operate the facility at steady state reactor core power levels not in excess of 3020 megawatts (thermal). B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 213 are hereby incorporated in the renewed license. FPL shall operate the facility in accordance with the Technical Specifications. Appendix B, the Environmental Protection Plan (Non-Radiological), contains environmental conditions of the renewed license. If significant detrimental effects or evidence of irreversible damage are detected by the monitoring programs required by Appendix B of this license, FPL will provide the Commission with an analysis of the problem and plan of action to be taken subject to Commission approval to eliminate or significantly reduce the detrimental effects or damage. C. Updated Final Safety Analysis Report The Updated Final Safety Analysis Report supplement submitted pursuant to 10 CFR 54.21(d), as revised on March 28, 2003, describes certain future activities to be completed before the period of extended operation. FPL shall complete these activities no later than March 1,2016, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection. The Updated Final Safety Analysis Report supplement as revised on March 28, 2003, described above, shall be included in the next scheduled update to the Updated Final Safety Analysis Report required by 10 CFR 50.71 (e)(4), following issuance of this renewed license. Until that update is complete, FPL may make changes to the programs described in such supplement without prior Commission approval, provided that FPL evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section. D. Sustained Core Uncovery Actions Procedural guidance shall be in place to instruct operators to implement actions that are designed to mitigate a small-break loss-of-coolant accident prior to a calculated time of sustained core uncovery. Renewed License No. DPR-67 Amendment No. 213 TABLE Minimum Burnup as a Function of CoefficientsCooling Time Fuel Type (Years) A B C 0 -36.6860 -1.441322.4942 0 16.6000 -0.89582 -36.1742 3 0 -34.7091 23.1361 -1.6204 21.34040 -24.5145 -1.2444 2.5 22.5246 -1.5029-26.8311 20.9763 -1.32465 -24.7233 4 10 19.9541 -1.2505-23.6285 15 -23.5458 20 -22.4382 0 -8.1856 2.5 -11.8506 5 -16.5196 5 10 -13.6831 16.3475 -0.5844 15 -12.5819 15.6175 -0.5656 20 -12.6469 15.4575 -0.5906 NOTES: To qualify in a "fuel type," the burnup of a fuel assembly must exceed the minimum bumup "BU" calculated by inserting the "coefficients" for the associated "fuel type" and "cooling time" into the polynomial function: BU = A + B"E + C"E2, where: BU =Minimum Burnup (GWO/MTU) E = Initial Maximum Planar Average Enrichment (weight percent uranium-235) A, e, C = Coefficients Interpolation between values of cooling time is not permitted. ST. LUCIE -UNIT 5.69 Amendment No. 213 M. Nazar -2 The corrected pages are enclosed. We regret any inconvenience this may have caused. If you have any questions regarding this matter, please call me at (301) 415-2788. Sincerely, IRA! Tracy J. Orf, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-335 Enclosure: Corrected Pages cc: Distribution via Listserv DISTRIBUTION: PUBLIC LPL2-2 R/F RidsNrrDorlLpl2-2 RidsNrrLABClayton RidsNrrPMStLucie RidsOgcRp RidsAcrsAcnwMailCenter RidsRgn2MailCenter P k ccesslon N 0.: ML12194A299 Amendment ML12181A019ac age ADAMS A Correctlon ML12194A287 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC(A) LPL2-2/PM NAME TOrf BClayton EBrown TOrf DATE 07/12/12 07112112 07112112 07112112 OFFICIAL RECORD COpy