ML20206U280

From kanterella
Revision as of 03:08, 6 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of 990527 Meeting with Util in Lisle,Il to Discuss Results of Licensee Evaluation on Potential Chilling Effect Concern within Working Environ & Use of Overtime within Operations Dept Organization at Byron Station
ML20206U280
Person / Time
Site: Byron  Constellation icon.png
Issue date: 04/28/1999
From: Dave Hills
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
Shared Package
ML20206U278 List:
References
NUDOCS 9905250140
Download: ML20206U280 (2)


Text

I , 05':!4/09 16:51 FA.\ 630 515 1078 L.S..NRC REGION 111 16006 I

e d "'C UNITED STATES W,%, NUCLEAR REGULATORY COMMISSION S REGloN lil

[

5 j 801 WARRENVILLE ROAD

% # usLE. ILUNois 60532-4351 April 28, 1999 NOTICE OF SIGNIFICANT LICENSEE MEETING '

1 l

THIS MEETING IS OPEN TO PUBLIC ATTENDANCE l

Name of Licensee: Commonwealth Edison Company l Name of Facility: Byron Nuclear Generating Station Docket No(s).: 50-454; 50-455 ,

I Date and Time of Meeting: May 27,1999 at 1:00 pm to 4:00 pm (CST) l Location of Meeting: U. S. Nuclear Regulatory Commission Region lll 801 Warrenville Road Lisle, Illinois 60532-4351 1

Purpose of Meeting: To discuss the results of the licensee's evaluation on a potential l chilling effect concem within the working environment and the use l of overtime within the operations department organization at the Byron Station.

NRC Attendees:

J. Dyer, Regional Administrator Others as designated Licensee Attendees:

O. Kingsley, President, Nuclear Generation Group Others as designated NOTE: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to D. Hills at 630/829-9733 by COB May 24,1999.

Approved by:

David E. Hills, Chief Operations Branch See Attached Distribution ykS2 40 990513 P CK 05000454 PDR 0$bM L} D Y

[.. Q.b24/99 16:50 FAX 630 51S 1078 U.S.NRC REGION Ill goog I

BACKGROUND INFORMATION RELATED TO THE MAY 27,1999, PUBLIC MEETING EETWEEN COMMONWEALTH EDISON (COMED) AND THE NRC RELATED TO A FOTENTIAL CHILLING EFFECT CONCERN AND THE USE OF OVERTIME WITHIN THE l OPERATIONS DEPARTMENT AT THE BYRON NUCLEAR POWER PLANT.

l '

The attached correspondence is being provided to facilitate your understanding of the issues i being discussed at the May 27,1999, public meeting referenced above. Some of the l information in the documents has been redacted to ensure that personal privacy information or cther sensitive information was protected.

The correspondence has been placed in the NRC's Public Document Room (PDR) in accordance with 10 CFR 2.790 and with the agreement of Comed's Director of Public Affairs, Don Kirchoffner, and the Vice President of Regulatory Services, Ron Krich.

I Attachments:

1. August 5 and August 26,1998, letters from NRC to Comed re: Byron Chilling Effect Concems.

November 20,1998, Comed letter to NRC re: Byron Chilling Effect Concerns. i 2.

3. March 18,1999, letter from NRC to Comed re: Byron Chilling Effect Concems.
4. October 30,1998, letter from NRC to Comed re: Byron Station Overtime.
5. December 8 and December 22,1998, letters from Comed to NRC re: Byron Station Overtime.
6. March 29,1999, letter from NRC to Comed re: Byron Station Overtime.
7. April 30,1999, letter from Comed to NRC re: Byron Station Overtime i
8. Public Meeting Notice i

l \

l l

,