MONTHYEARML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24155A0882024-05-30030 May 2024 Email Summary of Verbal Authorization 1RR06 ML24150A3342024-05-29029 May 2024 Official RCIs for Susquehanna Proposed Alternative 1RR06 ML24087A0672024-04-22022 April 2024 Email to Melisa Krick Regarding Exemption Decision for Susquehanna ML24087A0682024-04-17017 April 2024 Email to Melisa Krick Regarding Availability of Environmental Assessment for the Susquehanna Exemption ML24106A0672024-04-12012 April 2024 State of Pennsylvania Input Review of Draft EA for Exemption Request for Susquehanna, Units 1 and 2 ML24103A0012024-04-11011 April 2024 – Summary of Verbal Authorization of 4RR-11 ML24102A1252024-04-10010 April 2024 Request for Additional Information for Susquehanna, Unit 1 Alternative Request 4RR-11 ML24106A0662024-04-10010 April 2024 Request for State Review of Draft EA for an Exemption Request for Susquehanna, Units 1 and 2 ML24082A0922024-03-21021 March 2024 Confirmation Email 3-21-2024 Regarding Exemption Request for Future Loading Only at Susquehanna ML24047A1232024-02-14014 February 2024 NRC Consultation with Commonwealth of PA Proposed NSHC for Susquehanna LAR TSTF-568 and TSF-563 Email ML24029A2732024-01-29029 January 2024 NRC Consultation with Commonwealth of Pennsylvania Re Proposed NSHC for Susquehanna License Amendment Request ML23352A2542023-12-18018 December 2023 NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, License Amendment Request to Revise Technical Specifications (TS) to Adopt TSTF-568 ML23345A0542023-12-0808 December 2023 Email - NRC LIC-109 Acceptance Review Results for Susquehanna License Amendment Request to Revise Technical Specifications to Adopt TSTF-563 ML23334A1682023-11-30030 November 2023 NRC Request for Additional Information Re. Susquehanna Relief Request RR-01 ML23334A1502023-11-30030 November 2023 NRC Request for Additional Information Re. Susquehanna Relief Request RR-02 ML23242A2832023-08-30030 August 2023 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, Proposed Alternatives RR01 and RR02 (EPIDs L-2023-LLR-0043 and -0044) ML23230A0712023-08-18018 August 2023 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, Proposed Alternative for Valve 251130 ML23188A0802023-07-0707 July 2023 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, License Amendment Request to Revise Control Rod Technical Specifications ML23171A4312023-06-20020 June 2023 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, Proposed Alternative 5RR-02 ML23103A4702023-04-12012 April 2023 NRR E-mail Capture - Susquehanna Unit 2 - Verbal Authorization of Relief Request 4RR-10 ML23094A1242023-03-31031 March 2023 EN 56387 Update - Paragon Energy Solutions Final Notification of Defect of Automatic Transfer Switch ML23075A0492023-03-16016 March 2023 NRR E-mail Capture - Notification to the State of Pennsylvania Re. Susquehanna Steam Electric Station, Units 1 and 2 - Indirect License Transfer and Draft Conforming Amendments ML23073A1202023-03-14014 March 2023 NRR E-mail Capture - Evacuation Time Estimate Review ML23013A2082023-01-13013 January 2023 Request for Additional Information ML23012A0012023-01-11011 January 2023 NRC Notification to the State of Pennsylvania Re. Emergency Amendment – Control Rod Technical Specifications ML22293A0882022-10-20020 October 2022 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna License Transfer ML22257A1942022-09-14014 September 2022 NRR E-mail Capture - NRC Notification to the State of Pennsylvania Re. Susquehanna Steam Electric Station, Units 1 and 2 Amendment - Relocating Staff Qualification Requirements ML22213A2612022-08-0101 August 2022 NRR E-mail Capture - NRC Notification to the State of Pennsylvania Re. Susquehanna Steam Electric Station, Units 1 and 2 Amendment - Instrumentation and Control Technical Specifications ML22179A2902022-06-28028 June 2022 NRR E-mail Capture - NRC Notification to the State of Pennsylvania Re. Susquehanna Steam Electric Station, Units 1 and 2 Amendment - TSTF-505, Risk Informed Completion Times ML22146A0742022-05-25025 May 2022 NRR E-mail Capture - NRC Request for Additional Information - Susquehanna License Amendment Request ML22123A1112022-05-0303 May 2022 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, License Amendment Request to Relocate Staff Qualifications ML22111A3132022-04-21021 April 2022 NRR E-mail Capture - NRC Request for Additional Information - Susquehanna License Amendment Request ML22084A0222022-03-25025 March 2022 NRR E-mail Capture - Susquehanna Atrium-11 LAR Audit Report ML22038A1062022-02-0404 February 2022 NRR E-mail Capture - Susquehanna Steam Electric Station, Units 1 and 2 - Acceptance of Requested Licensing Action Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR ML22005A0712021-12-21021 December 2021 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna 1 & 2 ECCS TS LAR ML21190A1702021-06-11011 June 2021 NRR E-mail Capture - NRC Notification to the State of Pennsylvania Regarding a Susquehanna Steam Electric Station, Unit 2 Amendment - Unit 1 Transformer Replacement ML21124A2022021-05-0404 May 2021 NRR E-mail Capture - Acceptance Review for Susquehanna TSTF-505 ML20343A3712020-12-0808 December 2020 NRR E-mail Capture - Corrected - Acceptance Review of Susquehanna RR 4RR-02 ML20343A3702020-12-0808 December 2020 NRR E-mail Capture - Acceptance Review of Susquehanna RR 4RR-02 ML20335A5732020-11-30030 November 2020 NRR E-mail Capture - Susquehanna -Acceptance Review Replacement of Unit 1 Transformers ML20283A7722020-10-0909 October 2020 Submittal of Pennsylvania Letter Requesting Exemption from Biennial Exercise Requirements for Pennsylvania Nuclear Power Plants in Calendar Year 2020 ML20261H4272020-09-17017 September 2020 NRR E-mail Capture - Corrected Acceptance Review for Susquehanna - Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20261H4212020-09-16016 September 2020 NRR E-mail Capture - Corrected Acceptance Review for Susquehanna - Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20195B1282020-07-13013 July 2020 NRR E-mail Capture - Acceptance Review for Susquehanna- Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (EPID L-2020-Lla-0139) ML20178A6502020-06-26026 June 2020 Acceptance Review for Susquehanna - Revise Technical Specification 3.8.1 to Create a New Condition for an Inoperable Manual Synchronization Circuit ML20028F6352020-01-28028 January 2020 NRR E-mail Capture - Acceptance Review of LAR to Revise the Dose Consequence Analysis for a Loss of Coolant Accident ML19319A0092019-11-14014 November 2019 NRR E-mail Capture - Draft RAI for SSES Units 1 and 2 LAR to Replace ESW Piping ML19319B1922019-11-14014 November 2019 NRR E-mail Capture - RAI for Susquehanna, 1 and 2 License Amendment Request - Replace the Emergency Service Water System and Residual Heat Removal Service Water System ML19234A0342019-08-19019 August 2019 Acceptance Review: Susquehanna Units 1 and 2 License Amendment Request for Advanced Framatome Methodologies for Atrium 11 2024-09-04
[Table view] Category:Legal-Correspondence
MONTHYEARML14321A7422014-11-17017 November 2014 Letter from Emile Julian to Timothy Rausch Providing Comments from Eric Epstein Regarding Susquehanna Steam Electric Station, Units 1 and 2 and ISFSI; Application for License Transfer ML14308A6402014-11-0303 November 2014 Letter from Emile Julian to Timothy Rausch Providing Comments Submitted Regarding Susquehanna Steam Electric Station, Units 1 and 2 and ISFSI; Application for License Transfer ML1022200332010-07-22022 July 2010 Nuclear Plant Unit Could Be Down for Extended Time ML1022200302010-07-22022 July 2010 Leaks & Spills at Ppl'S Nuclear Power Plant ML13046A1362010-01-0505 January 2010 Enclosure 7 ML0725300662007-09-0505 September 2007 Susquehanna - Notice of Appearance, Data Requests, and Motion to Postpone) Final Determination of PPL Susquehanna, Llc'S Application for Surface Water Withdrawal Request to Modify Application 19950301-EPU-0572 ML0724900362007-08-31031 August 2007 Susquehanna - Eric Joseph Epstein'S Letter to Paul O. Swartz, Notice of Appearance, Data Requests, and Motion to Postpone Final Determination of PPL Susquehanna, Llc'S Application for Surface Water Withdrawal Request to Modify Application ML0723304162007-08-15015 August 2007 Susquehanna - Petition in Opposition to PPL Susquehanna, LLC Application for Surface Water Withdrawal Request to Modify Application 19950301-EPU-0572 and Formal Request for a Public Input Hearing ML0722103632007-08-0101 August 2007 Susquehanna - E. J. Epstein'S Petition in Opposition to Susquehanna -Application for Surface Water Withdrawal Request to Modify Application 19950301-EPU-0572 and Formal Request for a Public Input Hearing Under Subpart a - Conduct Of. PLA-6110, Susquehanna - Eric Joseph Epstein'S Notice of Intent to File a Petition in Opposition to PPL Susquehanna, LLC Application for Surface Water Withdrawal Request to Modify Application 19950301-EPUL-05722007-07-27027 July 2007 Susquehanna - Eric Joseph Epstein'S Notice of Intent to File a Petition in Opposition to PPL Susquehanna, LLC Application for Surface Water Withdrawal Request to Modify Application 19950301-EPUL-0572 ML0707403592007-03-15015 March 2007 Susquehanna - Letter to Administrative Judges from J. Martin, OGC Informing the Board of the Sfaff'S Notice of Opportunity for Hearing Publication in the Federal Register ML0706802712007-03-0909 March 2007 Susquehanna - Response to Pre-hearing Telephone Conference Regarding Susquehanna Steam Electric Station, Units 1 and 2 ML0704402502007-02-0505 February 2007 Susquehanna - Judge Young'S Reminder to Parties to Include Law Clerk Marcia Carpentier on the Service List ML18025A0621979-07-0707 July 1979 Citizens Against Nuclear Dangers' Response to the Memorandum of the Atomic Safety and Licensing Board ML18025A0661979-06-29029 June 1979 Responses of Commonwealth of Pennsylvania to First Round Discovery Requests of Citizens Against Nuclear Danger ML18025A0631979-06-29029 June 1979 Environmental Coalition on Nuclear Power Intervenors' Answers to First Round Applicant Interrogatories ML19186A1431979-01-0505 January 1979 Citizens Against Nuclear Dangers State for the Record the Timely Reasons for Intervention in the Proceedings Before the Us NRC and Before ASLBP in the Matter of Pllc and Allegheny Electric Cooperative, Inc 2014-11-03
[Table view] |
Text
HearingDoc~ket- Re: Epstein Reply to PPLNRC; PPL Susquehanna LLC (Susquehanna Steam ElectricStation, Units 1 and 2)P*Ie, e 1 From: Ann Young To: David R. Lewis; Eric Epstein; HearingDocket; klathrop@independence.net; SECY; Susan Uttal; wsager@tamu.edu Date: Mon, Feb 5, 2007 4:00 PM
Subject:
Re: Epstein Reply to PPL/NRC; PPL Susquehanna LLC (Susquehanna Steam Electric Station, Units 1 and 2). D Just to remind everyone, please add our law clerk, Marcia Carpentier, at MXC7@nrc.gov, to your email service list. DOCKETED Thank you. Judge Young USNRC 02/05/02,(4:00 PM)
>>> Eric Epstein <ericepstein@comcast.net> 02/05/2007 4:16 PM >>>
February 5, 2007 OFFICE OF THE SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF
Dear Sir or Madam:
Enclosed please find Eric Joseph Epstein's Response to PPL Susquehannals Answer to Eric Joseph Epstein's Petition to Intervene and Eric Joseph Epstein's Response the NRC Staff's Response to Eric Joseph Epstein's Petition for leave to Intervene, Request for Hearing, and Contentions Re:
PPL Susquehanna LLC Application for Susquehanna Steam Electric Station's Renewed Operating Licenses, NPF-14 and NPF-22 Docket Nos. 50-387 PLA-6110 and 50-388.
Thank you for your attention to this matter.
Respectfully submitted, Eric Joseph Epstein 4100 Hillsdale Road Harrisburg, PA 17112 (717)-541-1101 Phone CC: Bryan A Snapp; Marcia Carpentier S C--/- 0YL13
Mail Envelope Properties (45C79B02.61F: 0: 35784)
Subject:
Re: Epstein Reply to PPL/NRC; PPL Susquehanna LLC (Susquehanna Steam Electric Station, Units 1 and 2). D Creation Date Mon, Feb 5, 2007 4:00 PM From: Ann Young Created By: AMY@nrc.gov Recipients comcast.net ericepstein (Eric Epstein) independence.net klathrop (klathrop@independence.net) nrc.gov OWGWPOO I.HQGWDOOI MXC7 CC (Marcia Carpentier) nrc.gov OWGWPOO2.HQGWDOOI HearingDocket (HearingDocket) nrc.gov TWGWPO02.HQGWDOOI SECY (SECY) nrc.gov TWGWPO04.HQGWDOOI SLU (Susan Uttal) pillsburylaw.com david.lewis (David R. Lewis) pplweb.com basnapp CC (Bryan A Snapp) tamu.edu wsager (wsager@tamu.edu)
Post Office Route comcast.net independence.net
OWGWPOO1 .HQGWDOOI nrc.gov OWGWPOO2.HQGWDOOI nrc.gov TWGWPO02.HQGWDOOI nrc.gov TWGWPO04.HQGWDOOI nrc.gov pillsburylaw.com pplweb.com tamu.edu Files Size Date & Time MESSAGE 2083 Monday, February 5, 2007 4:00 PM Options Expiration Date: None Priority: Standard ReplyRequested: No Return Notification: None Concealed
Subject:
No Security: Standard Junk Mail Handling Evaluation Results Message is not eligible for Junk Mail handling Message is from an internal sender Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled