ML14316A595

From kanterella
Revision as of 20:32, 31 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

ISFSI and Monticello - Forwards Supplemental to Request for Review and Approval of Northern States Power Company Quality Assurance Topical Report
ML14316A595
Person / Time
Site: Monticello, Prairie Island  Xcel Energy icon.png
Issue date: 11/12/2014
From: Murphy M
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML14316A593 List:
References
L-XE-14-020
Download: ML14316A595 (2)


Text

(l Xcel Energy 414 Nicollet Mall - MP4 Minneapolis, MN 55401 November 12, 201 4 L-XE-14-020 10 CFR 50.54(a)(4)

ATTN: Document Control Desk U. S. Nuclea r Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant Monticello Nuclea r Generating Plant Units 1 and 2 Docket 50-263 Dockets 50-2 82 and 50-306 Re newed Licen se No. DPR-22 Renewed License Nos. DPR-42 and DPR-60 Prairie Island Independent Spent Fuel Storage Installation Docket 72-10 Materials License No. SNM-2506 Supplement to Request for Review and Approval of Northern States Power Company Quality Assurance Topical Report

Reference:

Letter from Northern States Power Company, a Minnesota corporation (NSPM),

d/b/a Xcel Energy to Document Control Desk, "Request for Review and Approval of Northern States Power Company Quality Assurance Topical Report", dated October 31, 2014 (ADAMS Accession ML14304A353).

On October 31, 2014, NSPM submitted a revision to the Quality Assurance Topical Report (QATR) for review and approval in accordance with 10 CFR 50.54(a)(4) (Reference). The proposed change revises previously submitted requirements related to the conduct of Independent Assessments. Specifically, this change divides the Independent Assessment function of the Nuclear Oversight (NOS) organization into two distinct functions: Independent Audits and Independent Assessments.

To aid to the staff's review of the QATR revision, a redline/strikeout version of the QATR is enclosed.

Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.

Enclosure cc: Administrator, USNRC, Region Ill USNRC NRR Project Manager, PINGP USNRC Senior Resident Inspector, PINGP USNRC NRR Project Manager MNGP USNRC Senior Resident Inspector, MNGP