ML16301A033
ML16301A033 | |
Person / Time | |
---|---|
Site: | La Crosse File:Dairyland Power Cooperative icon.png |
Issue date: | 11/01/2016 |
From: | Vaaler M Reactor Decommissioning Branch |
To: | Bruce Watson Reactor Decommissioning Branch |
VAALER M, 415-3178, T8-F05 | |
Shared Package | |
ML16301A031 | List: |
References | |
Download: ML16301A033 (6) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 1, 2016 MEMORANDUM TO: Bruce A. Watson, CHP, Chief Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Material Safety and Safeguards FROM: Marlayna Vaaler, Project Manager /RA/
Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Material Safety and Safeguards LICENSEE: Dairyland Power Cooperative and LaCrosseSolutions, LLC FACILITY: La Crosse Boiling Water Reactor
SUBJECT:
SUMMARY
OF THE OCTOBER 20, 2016, PUBLIC MEETING WITH DAIRYLAND POWER COOPERATIVE AND LA CROSSE SOLUTIONS REGARDING A REVISION TO THE LICENSE TERMINATION PLAN FOR THE LA CROSSE BOILING WATER REACTOR
Background
On October 20, 2016, a Category 1 public meeting was held between U.S. Nuclear Regulatory Commission (NRC) staff and representatives of LaCrosseSolutions, LLC (LS, the licensee) at NRC Headquarters, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss LSs plans and schedule regarding an update to the License Termination Plan (LTP) for the La Crosse Boiling Water Reactor (LACBWR) in Genoa, Wisconsin, as well as the NRCs ongoing review of the original submittal.
The meeting notice dated October 14, 2016, can be found in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML16288A164. A list of attendees is provided in Enclosure 1.
Meeting On October 20, 2016, the NRC staff held a public meeting with LS to discuss the plans and schedule for providing a substantial update to the LTP for LACBWR, which would allow for the completion of decommissioning activities and termination of Facility Operating License DPR-45 for the LACBWR facility. The original LACBWR LTP was submitted on June 27, 2016, and is available at ADAMS Accession No. ML16200A095.
Representatives from LS gave a presentation on the revised LTP and how the changes impact the overall LACBWR decommissioning strategy and timeline. This presentation is provided as and can be found in ADAMS at Accession No. ML16301A032. At the end of the meeting, members of the public and interested stakeholders were invited to ask questions, provide feedback, and make comments on the revised LACBWR LTP.
During the meeting, LS discussed the history of the original LACBWR LTP, the license termination activities completed to date, the current LACBWR decommissioning process, and the remaining decommissioning activities and how they will be addressed during implementation of the revised LTP. LS also provided a summary of the overall changes that will be made to the revised LTP, including modifications to revise terminology and reviewability for conformity with NRC guidance documents, as well as additional technical approach and clarity changes that were discussed on a chapter by chapter basis.
The NRC staff noted that the revised LTP approach and use of the applicable NRC guidance documents to the extent practical represents an enhancement to the original LACBWR LTP.
No Public Meeting Feedback forms were received.
Please direct any inquiries to me at 301-415-3178 or by e-mail at marlayna.vaaler@nrc.gov.
Docket Nos. 50-409 and 72-046 License No. DPR-45
Enclosures:
- 1. List of Attendees
- 2. LS Presentation Slides cc w/enclosures: La Crosse Boiling Water Reactor Service List
Representatives from LS gave a presentation on the revised LTP and how the changes impact the overall LACBWR decommissioning strategy and timeline. This presentation is provided as and can be found in ADAMS at Accession No. ML16301A032. At the end of the meeting, members of the public and interested stakeholders were invited to ask questions, provide feedback, and make comments on the revised LACBWR LTP.
During the meeting, LS discussed the history of the original LACBWR LTP, the license termination activities completed to date, the current LACBWR decommissioning process, and the remaining decommissioning activities and how they will be addressed during implementation of the revised LTP. LS also provided a summary of the overall changes that will be made to the revised LTP, including modifications to revise terminology and reviewability for conformity with NRC guidance documents, as well as additional technical approach and clarity changes that were discussed on a chapter by chapter basis.
The NRC staff noted that the revised LTP approach and use of the applicable NRC guidance documents to the extent practical represents an enhancement to the original LACBWR LTP.
No Public Meeting Feedback forms were received.
Please direct any inquiries to me at 301-415-3178 or by e-mail at marlayna.vaaler@nrc.gov.
Docket Nos. 50-409 and 72-046 License No. DPR-45
Enclosures:
- 1. List of Attendees
- 2. LS Presentation Slides cc w/enclosures: La Crosse Boiling Water Reactor Service List DISTRIBUTION:
PUBLIC DUWP/RDB RF CMcKenney, NMSS MKunowski, RIII RFedors, NMSS LParks, NMSS JQuintero, NMSS SGeibel, NMSS Pkg: ML16301A031 Memo: ML16301A033
Enclosure:
ML16301A032 OFFICE NMSS/RDB/PM NMSS/RDB/LA NMSS/RDB/BC NMSS/RDB/PM NAME MVaaler CHolston BWatson MVaaler DATE 10/26/16 10/27/16 TSmith for 11/1/16 11/1/16
LIST OF ATTENDEES OCTOBER 20, 2016, PUBLIC MEETING WITH LACROSSESOLUTIONS, LLC REVISION TO THE LICENSE TERMINATION PLAN FOR THE LA CROSSE BOILING WATER REACTOR U.S. Nuclear Regulatory Commission Bruce Watson, NMSS/DUWP Marlayna Vaaler, NMSS/DUWP Leah Parks, NMSS/DUWP Stephen Giebel, NMSS/DUWP Randall Fedors, NMSS/DUWP John Clements, NMSS/DUWP Rhex Edwards, RIII/DNMS Dairyland Power Cooperative Cheryl Olson*
LaCrosseSolutions, LLC Gerry Van Noordennen Donald (Nick) Williams Bob Yetter Eric Darois Joe Jacobsen*
Joe Nowak*
EXTERNAL STAKEHOLDERS State of Wisconsin:
Robert Busch*
Carlyn Greene* (UxC)
- via teleconference Enclosure 1
Enclosure 2 LaCrosseSolutions Presentation Slides ML16301A032 Enclosure 2
La Crosse Boiling Water Reactor Service List:
Ken Robuck Jeffery Kitsembel Group President Disposal and Electric Division Decommissioning Wisconsin Public Service Commission EnergySolutions P.O. Box 7854 299 South Main Street, Suite 1700 Madison, WI 53707-7854 Salt Lake City, UT 84111 Paul Schmidt, Manager John Sauger Radiation Protection Section Executive VP and Chief Nuclear Officer Bureau of Environmental and Occupational Health Reactor DD Division of Public Health EnergySolutions Wisconsin Department of Health Services 2701 Deborah Avenue P.O. Box 2659 Zion, IL 60099 Madison, WI 53701-2659 Gerard van Noordennen Barbara Nick VP Regulatory Affairs President and CEO EnergySolutions Dairyland Power Cooperative 2701 Deborah Avenue 3200 East Avenue South, Zion, IL 60099 La Crosse, WI 54602-0817 Joseph Nowak Cheryl Olson, ISFSI Manager General Manager La Crosse Boiling Water Reactor LaCrosseSolutions Dairyland Power Cooperative S4601 State Highway 35 S4601 State Highway 35 Genoa, WI 54632-8846 P.O. Box 817 Genoa, WI 54632-8846 Dan Shrum Senior VP Regulatory Affairs Lane Peters, Site Manager EnergySolutions La Crosse Boiling Water Reactor 299 South Main Street, Suite 1700 Dairyland Power Cooperative Salt Lake City, UT 84111 S4601 State Highway 35 Genoa, WI 54632-8846 Russ Workman General Counsel Thomas Zaremba EnergySolutions Wheeler, Van Sickle and Anderson, S.C.
299 South Main Street, Suite 1700 44 East Mifflin Street, Suite 1000 Salt Lake City, UT 84111 Madison, WI 53703 George Kruck, Chairman John E. Matthews Town of Genoa Morgan, Lewis & Bockius LLP S5277 Mound Ridge Road 1111 Pennsylvania Avenue, NW Genoa, WI 54632 Washington, DC 20004 Regional Administrator U.S. NRC, Region III 2443 Warrenville Road Lisle, IL 60532-4352