ML090480611

From kanterella
Jump to navigation Jump to search
Dairyland Power Cooperative, Transmittal of Changes to Emergency Plan Procedure, LACBWR Controlling Documents, EPP-5, Issue 25 Near-Site/Off -Site Dose Evaluation
ML090480611
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 01/27/2009
From:
Dairyland Power Cooperative
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
Download: ML090480611 (1)


Text

DAIRYIAND POWER C 0 0 P E R A T I V E NRC Docket No. 50-409 TO: NRC Washington - Doc Control CONTROLLED DISTRIBUTION NO. 53 (TWO COPIES)

FROM: LACBWR Plant Manager 1/27/2009

SUBJECT:

Changes to LACBWR Controlling Documents I. The following documents have been revised or issued new.

[Follow instructions on Page 0.2 of each procedure.]

EPP-5 ISSUE 25 NEAR-SITE/OFF-SITE DOSE EVALUATION II. The following procedure(s) has been CANCELED. Please destroy all copies.

N/A El The material listed above is transmitted herewith. Please verify receipt of all listed material, destroy superseded material, and sign below to acknowledge receipt.

El The material listed above has been placed in your binder.

El Please review listed material, notify your personnel of changes, and sign below to acknowledge your review and notification of personnel. [To be checked for supervisors for department specific procedures and LACBWR Technical Specifications.]

o The material listed above has been changed. [To be checked for supervisors when materials applicable to other departments are issued to them.]

El Update Index with pen and ink change, as appropriate.

/S/ DATE Please return this notification to the LACBWR Administrative Assistant within ten (10) working days. )

A Touchstone Energy' Cooperative ___

La Crosse Boiling Water Reactor (LACBWR)

  • S4601 State Highway 35 o Genoa, WI 54632-8846 o 608-689-2331
  • 608-689-4200 fax