ML17107A354

From kanterella
Revision as of 16:20, 6 February 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Acceptance Review - Hope Creek LAR to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (MF9501)
ML17107A354
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 04/17/2017
From: Carleen Parker
Plant Licensing Branch 1
To: Duke P R, Bernard Thomas
Public Service Enterprise Group
References
MF9501
Download: ML17107A354 (3)


Text

1 NRR-PMDAPEm Resource From: Parker, Carleen Sent: Monday, April 17, 2017 3:09 PM To: Paul.Duke@pseg.com; Thomas, Br ian J. (Brian.Thomas@pseg.com)

Cc:Danna, James; Tilton, Caroline; Razzaque, Muhammad

Subject:

Acceptance Review - Hope Creek LAR to Adopt TSTF-535, "Revise Shutdown Margin Definition To Address Adva nced Fuel Designs" (MF9501)

Paul and Brian, By letter dated March 27, 2017 (Agencywide Document Access and Management System (ADAMS) Accession No. ML17086A071), PSEG Nuclear LLC (PSEG) submitted a license amendment request for Hope Creek Generating Station (Hope Creek) to adopt TSTF-535, "Revise Shutdown Margin Definition To Address Advanced Fuel Designs." The proposed amendment would modify the Technical Specification (TS) definition of "Shutdown Margin" (SDM) to require calculation of the SDM at a reactor moderator temperature of 68 degrees Fahrenheit or a higher temperature that represents the most reactive state throughout the operating cycle. The purpose of this email is to provide the results of the NRC staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review.

The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in

sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in term s of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that

impact the NRC staff's ability to complete the detailed te chnical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> to complete. The NRC staff expects to complete this review by your requested date of March 27, 2017. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date (greater than a month) or significant changes in the forecasted hours (greater than 25%), the reasons for the changes, along with the new estimates will be communicated, during the routine interactions with the assigned project manager.

These estimates are based on the staff's initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

2 Carleen Parker Project Manager - Hope Creek and Salem Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission (301)415-1603

carleen.parker@nrc.gov

Hearing Identifier: NRR_PMDA Email Number: 3442 Mail Envelope Properties (916672ad00704361bd82a86c2616f82d)

Subject:

Acceptance Review - Hope Creek LAR to Adopt TSTF-535, "Revise Shutdown Margin Definition To Address Advanced Fuel Designs" (MF9501) Sent Date: 4/17/2017 3:08:56 PM Received Date: 4/17/2017 3:08:00 PM From: Parker, Carleen Created By: Carleen.Parker@nrc.gov Recipients: "Danna, James" <James.Danna@nrc.gov> Tracking Status: None "Tilton, Caroline" <Caroline.Tilton@nrc.gov> Tracking Status: None "Razzaque, Muhammad" <Muhammad.Razzaque@nrc.gov>

Tracking Status: None "Paul.Duke@pseg.com" <Paul.Duke@pseg.com> Tracking Status: None "Thomas, Brian J. (Brian.Thomas@pseg.com)" <Brian.Thomas@pseg.com> Tracking Status: None

Post Office: HQPWMSMRS02.nrc.gov Files Size Date & Time MESSAGE 3907 4/17/2017 3:08:00 PM

Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: