ML070600317

From kanterella
Revision as of 05:33, 13 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Inspection / Activity Plan, 03/01/2007 - 09/30/2008, Report 22
ML070600317
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/01/2007
From:
Division Reactor Projects II
To:
Carolina Power & Light Co
Shared Package
ML070600304 List:
References
Download: ML070600317 (2)


Text

Brunswick Inspection / Activity Plan 03/01/2007

-09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/01/2007 10:29:11 Report 22 2 PSB1-RP-RP OCCUPATIONAL BASELINE INSP- WK1 Baseline Inspections 03/05/2007 03/09/2007 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 03/05/2007 03/09/2007 1, 2 7112102 IP A LARA Planning and Controls Baseline Inspections 03/05/2007 03/09/2007 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 03/05/2007 03/09/2007 1, 2 71151 IP Performance Indicator Verification 1 EB3-ISI-U2 INSERVICE INSPECTION Baseline Inspections 03/12/2007 03/16/2007 2 7111108G IP Inservice Inspection Activities - BWR 3 PSB1-RP-RP OCCUPATIONAL OCCUPATIONAL INSP- WK2 Baseline Inspections 03/19/2007 03/23/2007 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 03/19/2007 03/23/2007 1, 2 7112102 IP A LARA Planning and Controls Baseline Inspections 03/19/2007 03/23/2007 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 03/19/2007 03/23/2007 1, 2 71151 IP Performance Indicator Verification 3 OL PREP-INITIAL EXAM PREP Not Applicable 06/25/2007 06/29/2007 1 V23267 BRUNSWICK/JULY 2007 EXAM AT POWER FACILITIES 4 OL EXAM-INITIAL EXAM Not Applicable 07/16/2007 07/27/2007 1 V23267 BRUNSWICK/JULY 2007 EXAM AT POWER FACILITIES 7 EB1-CDBI-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 10/22/2007 10/26/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 11/05/2007 11/09/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 11/26/2007 11/30/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 12/10/2007 12/14/2007 1, 2 7111121 IP Component Design Bases Inspection 1 PSB1-EP-EP INSP Baseline Inspections 11/26/2007 11/30/2007 1, 2 7111402 IP A lert and Notification System Testing Baseline Inspections 11/26/2007 11/30/2007 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 11/26/2007 11/30/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 11/26/2007 11/30/2007 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 11/26/2007 11/30/2007 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 11/26/2007 11/30/2007 1, 2 71151-EP02 IP ERO Drill Participation 1 EB3-HS-HEAT SINK Baseline Inspections 01/28/2008 02/01/2008 1, 2 7111107B IP Heat Sink Performance 1 EB3-ISI-UNIT 1 - ISI Baseline Inspections 03/10/2008 03/14/2008 1 7111108G IP Inservice Inspection Activities - BWR 2 PSB1-RP-RP OCCUPATIONAL BASELINE WEEK 1 Baseline Inspections 03/10/2008 03/14/2008 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 03/10/2008 03/14/2008 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Brunswick Inspection / Activity Plan 03/01/2007

-09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/01/2007 10:29:11 Report 22 2 PSB1-RP-RP OCCUPATIONAL BASELINE WEEK 1 Baseline Inspections 03/10/2008 03/14/2008 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 03/10/2008 03/14/2008 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 03/10/2008 03/14/2008 1, 2 71151 IP Performance Indicator Verification 3 PSB1-RP-RP OCCUPATIONAL BASELINE WEEK 2 Baseline Inspections 03/24/2008 03/28/2008 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 03/24/2008 03/28/2008 1, 2 7112102 IP A LARA Planning and Controls Baseline Inspections 03/24/2008 03/28/2008 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 03/24/2008 03/28/2008 1, 2 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 03/24/2008 03/28/2008 1, 2 71151-PR01 IP RETS/ODCM Radiological Effluent 4 EB1-MODS-MODIFICATIONS-10CFR50.59 Baseline Inspections 04/14/2008 04/18/2008 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 04/14/2008 04/18/2008 1, 2 7111117B IP Permanent Plant Modifications 1 EB3-ME-MAINTENANCE EFFECTIVENESS Baseline Inspections 05/19/2008 05/23/2008 1, 2 7111112B IP Maintenance Effectiveness This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.