ML12304A070

From kanterella
Jump to navigation Jump to search
Requalification Program Inspection
ML12304A070
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 10/30/2012
From: Mark Franke
NRC/RGN-II/DRS/PSB2
To: Annacone M
Progress Energy Carolinas
References
Download: ML12304A070 (8)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 October 30, 2012 Mr. Michael J. Annacone Vice President Brunswick Steam Electric Plant P.O. Box 10429 Southport, NC 28461-0429

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - BRUNSWICK STEAM ELECTRIC PLANT

Dear Mr. Annacone:

In a telephone conversation on October 26, 2012, Mr. Richard S. Baldwin, Senior Operations Examiner, and Mr. Tony Pearson, Superintendent of Operator Training, made arrangements for the NRC to inspect the licensed operator requalification (LOR) program at the Brunswick Steam Electric Plant. The inspection is planned for the week of November 26, 2012, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that your simulator is committed to ANSI/ANS-3.5-1998, AAmerican National Standard for Nuclear Power Plant Simulators for Use in Operator Training and Examination.@

In accordance with 10 CFR 55.59, the NRC has requested that you submit by November 17, 2012, the material as specified in paragraph A of the Enclosure, in order to support the NRC's inspection program needs. The NRC has further requested that you have all items as specified in paragraph B of the Enclosure available for review for the inspectors on the first day they arrive on site. Mr. Pearson has been advised of this request and has been provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on February 28, 2013.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

M. Annacone 2

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Rick Baldwin at (404) 997-4642 (Internet E-mail:

Richard.Baldwin@nrc.gov), or me at (404) 997-4436 (Internet E-mail: Mark.Franke@nrc.gov).

Sincerely,

/RA/

Mark E. Franke, Chief Operator Licensing Branch 2 Division of Reactor Safety Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62

Enclosure:

Materials Request List cc w/encl: (See page 3)

M. Annacone 2

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Rick Baldwin at (404) 997-4642 (Internet E-mail:

Richard.Baldwin@nrc.gov), or me at (404) 997-4436 (Internet E-mail: Mark.Franke@nrc.gov).

Sincerely,

/RA/

Mark E. Franke, Chief Operator Licensing Branch 2 Division of Reactor Safety Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62

Enclosure:

Materials Request List cc w/encl: (See page 3)

X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER: ML12304A070 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RA/RB RA/MF NAME BALDWIN FRANKE DATE 10/29/2012 10/30/2012 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME:

G:\\DRSII\\OBII\\SITES\\BRUNSWICK\\REQUAL INSPECTION INPUTS\\2012\\BRUNSWICK REQUAL INSPECTION 30 DAY LETTER 2012-005.DOCX

M. Annacone 3

cc:

Plant General Manager Brunswick Steam Electric Plant Progress Energy Electronic Mail Distribution Edward L. Wills, Jr.

Director Site Operations Brunswick Steam Electric Plant Electronic Mail Distribution J. W. (Bill) Pitesa Senior Vice President Nuclear Operations Duke Energy Corporation Electronic Mail Distribution John A. Krakuszeski Plant Manager Brunswick Steam Electric Plant Electronic Mail Distribution Lara S. Nichols Deputy General Counsel Duke Energy Corporation Electronic Mail Distribution M. Christopher Nolan Director - Regulatory Affairs General Office Duke Energy Corporation Electronic Mail Distribution Michael J. Annacone Vice President Brunswick Steam Electric Plant Electronic Mail Distribution Annette H. Pope Manager-Organizational Effectiveness Brunswick Steam Electric Plant Electronic Mail Distribution Lee Grzeck Regulatory Affairs Manager Brunswick Steam Electric Plant Progress Energy Carolinas, Inc.

Electronic Mail Distribution Randy C. Ivey Manager, Nuclear Oversight Brunswick Steam Electric Plant Progress Energy Carolinas, Inc.

Electronic Mail Distribution Paul E. Dubrouillet Manager, Training Brunswick Steam Electric Plant Electronic Mail Distribution Joseph W. Donahue Vice President Nuclear Oversight Progress Energy Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission Brunswick Steam Electric Plant U.S. NRC 8470 River Road, SE Southport, NC 28461 John H. O'Neill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Peggy Force Assistant Attorney General State of North Carolina P.O. Box 629 Raleigh, NC 27602 Chairman North Carolina Utilities Commission Electronic Mail Distribution Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Anthony Marzano Director Brunswick County Emergency Services Electronic Mail Distribution (cc contd - See page 4)

M. Annacone 4

(cc cont)

Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211 W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution Warren Lee Emergency Management Director New Hanover County Department of Emergency Management 230 Government Center Drive Suite 115 Wilmington, NC 28403 Progress Energy Carolinas, Inc.

Mr. Paul Dubrouillet Training Manager Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429

Letter to Michael J. Annacone from Mark E. Franke October 30, 2012.

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - BRUNSWICK STEAM ELECTRIC PLANT Distribution w/encl:

J. Baptist, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrunswick Resource

Enclosure Materials Request List The items listed below are being requested per telephone conversation on October 26, 2012, to support the upcoming IP-71111.11B inspection in November 2012, at the Brunswick Steam Electric Plant. Items in paragraph "A" are to be sent prior to the inspection. They must be received in our office by November, 17, 2012. Please have the items listed in paragraph "B" ready for our review upon arrival on November 26, 2012.

A.

In-office inspection material:

1. Complete list of all licensed individuals (active and inactive; RO and SRO) including license restrictions.
2. Copy of an Organizational Chart for the training department including simulator staff.
3. Spreadsheets and/or test outlines which show the usage of written examination questions, JPMs, and simulator scenarios (i.e. outlines/sample plans).
4. Copy of the weekly examination schedules for the weeks that the 2012 annual operating exams will be administered, including a list of personnel scheduled for testing the week of November 26, 2012.
5. Copies of the written examinations that were, or will be, administered for the 2012 biennial requalification examination (for all weeks), including all re-take examinations, if applicable. (exam security related item)
6. Ten (10) job performance measures (JPMs), both simulator and in-plant, and six (6) simulator scenarios associated with the current annual operating test. The JPMs and scenarios to be reviewed should include those that will be administered the week of November 26, 2012, with any remaining JPMs and scenarios reviewed selected from other weeks of the annual operating test. (exam security related item)
7. Self-assessment reports, corrective action reports, and Licensee Event Reports, written since the last requalification inspection, resulting from, or concerning human performance errors, including any examination security issues.
8. A copy of site procedure(s) governing the conduct (process and content) of license operator requalification training (classroom and simulator), examination development/administration, remedial training, and examination security.
9. A copy site procedure(s) governing simulator configuration control, maintenance, and fidelity, including all testing methods used to fulfill ANSI/ANSB3.5-1998 requirements.
10. Copy of the program evaluation of the previous biennial requalification cycle.

B.

On-site inspection material:

1. Complete list of all licensed individuals (active and inactive; RO and SRO) including license restrictions.

2 Enclosure

2. Copy of an Organizational Chart for the training department including simulator staff.
3. Spreadsheets and/or test outlines which show the usage of written examination questions, JPMs, and simulator scenarios (i.e. outlines/sample plans).
4. Copy of the weekly examination schedules for the weeks that the 2012 annual operating exams will be administered, including a list of personnel scheduled for testing the week of November 26, 2012.
5. Copies of the written examinations that were, or will be, administered for the 2012 biennial requalification examination (for all weeks), including all re-take examinations, if applicable. (exam security related item)
6. Ten (10) job performance measures (JPMs), both simulator and in-plant, and six (6) simulator scenarios associated with the current annual operating test. The JPMs and scenarios to be reviewed should include those that will be administered the week of November 2012, with any remaining JPMs and scenarios reviewed selected from other weeks of the annual operating test. (exam security related item)
7. Records associated with license reactivation, including:
a. Documentation of time on shift under instruction.
b. Security system and HP/dosimetry records for plant areas toured by reactivating individual and accompanying licensed operator.
8. Records providing documentation of maintenance of active license status (time on shift) for all licensed operators since last requalification inspection.
9. Medical records for all licensed (active and inactive) operators.
10. Simulator maintenance and testing records, including:
a. List of all open simulator discrepancies
b. List of all simulator discrepancies closed within the past 12 months
c. List of simulator performance tests
d. Simulator performance testing records and associated documentation