Report 22. Inspection/Activity Plan, 09/01/2008 - 12/31/2009
ML082460982
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/02/2008
From:
NRC/RGN-II/DRP/RPB4
To:
Shared Package
ML082460971 List:
References
Download: ML082460982 (2)


Text

Page 1 of 2 Brunswick 09/02/2008 16:37:20 Inspection / Activity Plan Report 22 09/01/2008 - 12/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type TI-171 - B.5.B PHASE 2&3 3 1, 2 IP 2515/171 Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 09/15/2008 09/19/2008 Generic Safety Inspectio OL EXAM - INITIAL EXAM PREP 3 1 V23291 BRUNSWICK/DECEMBER 2008 EXAM AT POWER FACILITIES 10/06/2008 10/10/2008 Not Applicable EB2-TFP - TRIENNIAL FIRE PROTECTION 8 1, 2 IP 7111105P Fire Protection-NFPA 805 Transition Period [Triennial] 11/03/2008 11/07/2008 Baseline Inspections 1, 2 IP 7111105P Fire Protection-NFPA 805 Transition Period [Triennial] 11/17/2008 11/21/2008 Baseline Inspections ISFSI - ISFSI PAD FORM & REBAR & CONCRETE 2 1, 2 IP 60853 On-Site Fabrication Of Components And Construction On An ISFSI 11/03/2008 11/07/2008 Other Routine OL EXAM - INITIAL EXAM 3 1 V23291 BRUNSWICK/DECEMBER 2008 EXAM AT POWER FACILITIES 11/03/2008 11/07/2008 Not Applicable OL RQ - REQUAL INSPECTION 3 1, 2 IP 7111111B Licensed Operator Requalification Program 11/17/2008 11/21/2008 Baseline Inspections PSB1-EP - EMERGENCY PREPAREDNESS EXERCISE 3 1, 2 IP 2515/175 Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 11/17/2008 11/21/2008 Baseline Inspections 1, 2 IP 7111401 Exercise Evaluation 11/17/2008 11/21/2008 EP Baseline Inspection 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 11/17/2008 11/21/2008 EP Baseline Inspection 1, 2 IP 71151-EP01 Drill/Exercise Performance 11/17/2008 11/21/2008 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 11/17/2008 11/21/2008 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 11/17/2008 11/21/2008 Baseline Inspections PSB1-RP - RP OCCUPATIONAL PRE INSPECTION VISIT 1 1, 2 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 02/02/2009 02/04/2009 Other Routine 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 02/02/2009 02/04/2009 Baseline Inspections EB3ISI - UNIT 2 INSERVICE INSPECTION 1 2 IP 7111108G Inservice Inspection Activities - BWR 03/09/2009 03/13/2009 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE WEEK1 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/09/2009 03/13/2009 Baseline Inspections 1, 2 IP 7112102-7112102R ALARA - Required 03/09/2009 03/13/2009 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 03/09/2009 03/13/2009 Baseline Inspections 1, 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 03/09/2009 03/13/2009 Baseline Inspections 1, 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 03/09/2009 03/13/2009 Baseline Inspections PSB1-RP - RADIATION PROTECTION OCCUPATIONAL WK2 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/23/2009 03/27/2009 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 03/23/2009 03/27/2009 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 03/23/2009 03/27/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Brunswick 09/02/2008 16:37:20 Inspection / Activity Plan Report 22 09/01/2008 - 12/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1-RP - RADIATION PROTECTION OCCUPATIONAL WK2 2 1, 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 03/23/2009 03/27/2009 Baseline Inspections 1, 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 03/23/2009 03/27/2009 Baseline Inspections PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 IP 71152B Identification and Resolution of Problems 04/20/2009 04/24/2009 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 05/04/2009 05/08/2009 Baseline Inspections EB3-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 07/06/2009 07/10/2009 Baseline Inspections OL EXAM - INITIAL EXAM PREP 3 1 V23322 BRUNSWICK/NOVEMBER 2009 EXAM AT POWER FACILITIES 10/26/2009 10/30/2009 Not Applicable OL EXAM - INITIAL EXAM - WEEK 1 3 1 V23322 BRUNSWICK/NOVEMBER 2009 EXAM AT POWER FACILITIES 11/16/2009 11/20/2009 Not Applicable PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 IP 7111402 Alert and Notification System Testing 11/16/2009 11/20/2009 EP Baseline Inspection 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 11/16/2009 11/20/2009 EP Baseline Inspection 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 11/16/2009 11/20/2009 EP Baseline Inspection 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 11/16/2009 11/20/2009 EP Baseline Inspection 1, 2 IP 71151-EP01 Drill/Exercise Performance 11/16/2009 11/20/2009 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 11/16/2009 11/20/2009 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 11/16/2009 11/20/2009 Baseline Inspections OL EXAM - INITIAL EXAM - WEEK 2 3 1 V23322 BRUNSWICK/NOVEMBER 2009 EXAM AT POWER FACILITIES 11/30/2009 12/04/2009 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.