Report 22 Inspection/Activity Plan 03/01/2009 - 06/30/2010
ML090630360
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/04/2009
From:
Division Reactor Projects II
To:
Carolina Power & Light Co
Shared Package
ML090630343 List:
References
Download: ML090630360 (3)


Text

Page 1 of 2 Brunswick 03/04/2009 15:04:57 Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EB3ISI - UNIT 2 INSERVICE INSPECTION 1 2 03/09/2009 03/13/2009 IP 7111108G Inservice Inspection Activities - BWR PSB1-RP - RP OCCUPATIONAL BASELINE WEEK1 3 1, 2 03/09/2009 03/13/2009 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 03/09/2009 03/13/2009 IP 7112102-7112102R ALARA - Required 1, 2 03/09/2009 03/13/2009 IP 7112202 Radioactive Material Processing and Transportation 1, 2 03/09/2009 03/13/2009 IP 71151 Performance Indicator Verification PSB1-RP - RADIATION PROTECTION OCCUPATIONAL WK2 2 1, 2 03/23/2009 03/27/2009 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 03/23/2009 03/27/2009 IP 7112102 ALARA Planning and Controls 1, 2 03/23/2009 03/27/2009 IP 7112202 Radioactive Material Processing and Transportation 1, 2 03/23/2009 03/27/2009 IP 71151 Performance Indicator Verification PI&R - PROBLEM IDENTIFICATION & RESOLUTION 6 1, 2 04/20/2009 04/24/2009 IP 71152B Identification and Resolution of Problems 1, 2 05/04/2009 05/08/2009 IP 71152B Identification and Resolution of Problems EB3-HS - HEAT SINK 2 1, 2 06/01/2009 06/05/2009 IP 7111107T Heat Sink Performance PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 11/16/2009 11/20/2009 IP 7111402 Alert and Notification System Testing 1, 2 11/16/2009 11/20/2009 IP 7111403 Emergency Response Organization Augmentation Testing 1, 2 11/16/2009 11/20/2009 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 11/16/2009 11/20/2009 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 11/16/2009 11/20/2009 IP 71151 Performance Indicator Verification PSB1-RP - RP GROUNDWATER PROTECTION 1 1, 2 02/15/2010 02/19/2010 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative EB3ISI - EB3 INSERVICE INSPECTION 1 1 03/01/2010 03/05/2010 IP 7111108G Inservice Inspection Activities - BWR PSB1-RP - RP ACCESS CONTROLS 1 1, 2 03/08/2010 03/12/2010 IP 7112101 Access Control to Radiologically Significant Areas OL EXAM - INITIAL EXAM PREP 7 1 03/15/2010 03/19/2010 V23322 BRUNSWICK/APRIL 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 7 1 04/05/2010 04/09/2010 V23322 BRUNSWICK/APRIL 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 6 1 04/12/2010 04/16/2010 V23322 BRUNSWICK/APRIL 2010 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 Brunswick 03/02/2009 15:04:57 Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 1, 2 06/21/2010 06/25/2010 IP 7111401 Exercise Evaluation 1, 2 06/21/2010 06/25/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 06/21/2010 06/25/2010 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 1 of 1 07200006 - CAROLINA POWER 03/04/2009 08:46:53 Inspection / Activity Plan Report 22 03/01/2009 - 02/28/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ISFSI - ISFSI PRE-OPERATIONAL TESTING 2 1 01/01/2010 03/31/2010 IP 60854 Preoperational Testing Of An ISFSI This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure