Inspection / Activity Plan Page 1 of 2 03/04/2009 15:04:57 Report 22 03/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Brunswick EB3ISI
- UNIT 2 INSERVICE INSPECTION 1
2 IP Inservice Inspection Activities - BWR 7111108G 03/09/2009 03/13/2009 PSB1-RP
- RP OCCUPATIONAL BASELINE WEEK1 3
1, 2 IP Access Control to Radiologically Significant Areas 7112101 03/09/2009 03/13/2009 1, 2 IP ALARA - Required 7112102-7112102R 03/09/2009 03/13/2009 1, 2 IP Radioactive Material Processing and Transportation 7112202 03/09/2009 03/13/2009 1, 2 IP Performance Indicator Verification 71151 03/09/2009 03/13/2009 PSB1-RP
- RADIATION PROTECTION OCCUPATIONAL WK2 2
1, 2 IP Access Control to Radiologically Significant Areas 7112101 03/23/2009 03/27/2009 1, 2 IP ALARA Planning and Controls 7112102 03/23/2009 03/27/2009 1, 2 IP Radioactive Material Processing and Transportation 7112202 03/23/2009 03/27/2009 1, 2 IP Performance Indicator Verification 71151 03/23/2009 03/27/2009 PI&R
- PROBLEM IDENTIFICATION & RESOLUTION 6
1, 2 IP Identification and Resolution of Problems 71152B 04/20/2009 04/24/2009 1, 2 IP Identification and Resolution of Problems 71152B 05/04/2009 05/08/2009 EB3-HS
- HEAT SINK 2
1, 2 IP Heat Sink Performance 7111107T 06/01/2009 06/05/2009 PSB1EP
- EMERGENCY PREPAREDNESS INSPECTION 1
1, 2 IP Alert and Notification System Testing 7111402 11/16/2009 11/20/2009 1, 2 IP Emergency Response Organization Augmentation Testing 7111403 11/16/2009 11/20/2009 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 11/16/2009 11/20/2009 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 11/16/2009 11/20/2009 1, 2 IP Performance Indicator Verification 71151 11/16/2009 11/20/2009 PSB1-RP
- RP GROUNDWATER PROTECTION 1
1, 2 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 02/15/2010 02/19/2010 EB3ISI
- EB3 INSERVICE INSPECTION 1
1 IP Inservice Inspection Activities - BWR 7111108G 03/01/2010 03/05/2010 PSB1-RP
- RP ACCESS CONTROLS 1
1, 2 IP Access Control to Radiologically Significant Areas 7112101 03/08/2010 03/12/2010 OL EXAM
- INITIAL EXAM PREP 7
1 BRUNSWICK/APRIL 2010 EXAM AT POWER FACILITIES V23322 03/15/2010 03/19/2010 OL EXAM
- INITIAL EXAM - WEEK 1 7
1 BRUNSWICK/APRIL 2010 EXAM AT POWER FACILITIES V23322 04/05/2010 04/09/2010 OL EXAM
- INITIAL EXAM - WEEK 2 6
1 BRUNSWICK/APRIL 2010 EXAM AT POWER FACILITIES V23322 04/12/2010 04/16/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Inspection / Activity Plan Page 2 of 2 03/02/2009 15:04:57 Report 22 03/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Brunswick PSB1EP
- EMERGENCY PREPAREDNESS EXERCISE 3
1, 2 IP Exercise Evaluation 7111401 06/21/2010 06/25/2010 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 06/21/2010 06/25/2010 1, 2 IP Performance Indicator Verification 71151 06/21/2010 06/25/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Inspection / Activity Plan Page 1 of 1 03/04/2009 08:46:53 Report 22 03/01/2009 - 02/28/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site 07200006 - CAROLINA POWER ISFSI
- ISFSI PRE-OPERATIONAL TESTING 2
1 IP Preoperational Testing Of An ISFSI 60854 01/01/2010 03/31/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure