Pages that link to "05000423/LER-1996-042, Provides Util Revised Plans for Implementation of Commitment Made in LER 96-042-00"
Jump to navigation
Jump to search
The following pages link to 05000423/LER-1996-042, Provides Util Revised Plans for Implementation of Commitment Made in LER 96-042-00:
Displayed 50 items.
- 05000245/LER-1996-063, Forwards LER 96-063-01,documenting Event Occurred at Unit 1 on 961126.Commitments Made within Ltr Listed as Submitted (← links)
- 05000423/LER-1996-009, Submits Table of Commitments Re LER 96-009-02 Per 10CFR50.73(a)(2)(ii) (← links)
- 05000336/LER-1996-031, Forwards LER 96-031-01,documenting Event Occurred at Unit 2 on 961003.Commitments Made within Ltr Listed (← links)
- 05000245/LER-1996-020, Forwards LER 96-020-02,documenting Event Occurred at Unit 1 on 960322.Supplemental Rept Provides Update to Vol Calculations.Commitment B15674-3 Updated (← links)
- 05000245/LER-1996-037, Forwards Supplemental LER 96-037-02 Which Documents an Event That Occurred at Mnps,Unit 1 on 960327,per 10CFR50.73(a)(2)(ii) (← links)
- ML20135F804 (← links)
- 05000423/LER-1996-045, Forwards LER 96-045-00,documenting Condition That Was Determined at Millstone Unit 3 on 961107.LER Submitted Pursuant to 10CFR 50.73(a)(2)(ii).Commitments Encl (← links)
- 05000423/LER-1996-044, Forwards LER 96-044-00,documenting Condition That Was Determined at Millstone Unit 3,on 961108.Commitments,encl (← links)
- ML20135B078 (redirect page) (← links)
- 05000423/LER-1996-042 (redirect page) (← links)
- ML20135A608 (redirect page) (← links)
- ML20135A610 (← links)
- ML20135A608 (redirect page) (← links)
- 05000423/LER-1996-047, Revises Commitment Made in Response to LER 96-047-00 Re Seismic Qualification Training (← links)
- 05000423/LER-1996-050, Revises Commitments Previously Submitted to NRC in LER 96-050-00 Re Range of Control Bldg Chilled Water Pump Gauges Used for Surveillance Not in Accordance W/Asme Chapter XI Requirements (← links)
- 05000245/LER-1996-009, Forwards LER 96-009-01 Per 10CFR50.73(a)(2)(ii).Submits Remaining Commitment in Ltr (← links)
- 05000423/LER-1996-031, Forwards LER 96-031-01 Per 10CFR50.73(a)(2)(v).Commitments Contained within Attachment 1 to Ltr (← links)
- 05000245/LER-1996-054, Submits Change to Commitment Made in LER 96-054-01,dtd 961216.Listed Commitment Is Same Except for Change in Completion Date (← links)
- 05000423/LER-1996-049, Forwards LER 96-049-01,documenting an Event That Occurred at Mnps,Unit 3 on 961211.Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1996-029, Forwards LER 96-029-01,providing Update on Analyses & Investigation for Event.Commitments Made within Ltr,Listed (← links)
- 05000423/LER-1996-037, Revises Commitment Previously Submitted to NRC in LER 96-037-00, SFP Cooling Sys Potentially Inoperable Following SSE Due to Failure of Non Seismic Connecting Piping (← links)
- 05000245/LER-1996-046, Forwards LER 96-046-03,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 960627 Per 10CFR50.73(a)(2)(i).Util Commitments Made within Ltr, Listed (← links)
- 05000423/LER-1996-028, Informs of Rev to Commitment Made in LER-96-028-01 Re Temporary Mod of Cce Sys.W/Revised Commitment (← links)
- 05000423/LER-1996-048, Provides Commitments Re LER 96-048.Surveillance Procedures Used to Test Load Shed & re-energizing Feature for Both Trains of Charging Sys Pumps Will Be Revised to Conform W/ TS 4.8.1.1.2.g.6 (← links)
- 05000245/LER-1996-055, Forwards LER 96-055-00 Re Failure to Verify Emergency Diesel Air Start Requirements.Commitments Submitted (← links)
- 05000423/LER-1996-026, Forwards LER 96-026-02 Which Documents Condition That Was Determined at Plant,Unit 3 on 960730 (← links)
- 05000245/LER-1996-053, Forwards LER 96-053-00,documenting Event Occurred at Unit 1 on 961002.Util Will Develop Necessary Procedures to Perform Monthly Source Checks for Monitors & Instrument Calibrs Will Be Performed Monthly to Satisfy TS Requirement (← links)
- 05000336/LER-1996-043, Fowards LER 96-043-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 961231.Util Commitments Made within Ltr,Listed (← links)
- 05000423/LER-1996-019, Forwards LER 96-019-01 Documenting Event That Occurred at Millstone Nuclear Power Station Unit 3 on 960627.Util Commitments Made within Ltr,Listed (← links)
- 05000336/LER-1996-042, Forwards LER 96-042-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 961218.Commitments Made within Ltr (← links)
- 05000245/LER-1996-064, Forwards LER 96-064-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 961220.Commitments Made within Ltr,Listed (← links)
- 05000423/LER-1996-051, Forwards LER 96-051-00 & Util Commitments in Response to Event (← links)
- 05000336/LER-1996-041, Forwards LER 96-041-00,documenting Event at Plant on 961217.Commitments Made Re Event Listed (← links)
- 05000336/LER-1996-023, Forwards Suppl LER 96-023-01,providing Update on Analysis & Investigation of Event That Occurred at Milestone Station on 960425 (← links)
- 05000336/LER-1996-040, Forwards LER 96-040-00,documenting Event That Occurred at Mnps,Unit 2 on 961212.Commitment Made within Ltr,Listed (← links)
- 05000245/LER-1996-049, Forwards LER 96-049-01,documenting Event That Occurred at Mnps,Unit 1 on 960524,per 10CFR50.73(a)(2)(i) & 10CFR50.73(a)(2)(v).Util Commitments Listed (← links)
- 05000245/LER-1996-003, Forwards LER 96-003-02 Which Documents an Event That Occurred at Mnps,Unit 1 on 960111,per 10CFR50.73(a)(2)(i) & 10CFR50.73(a)(2)(ii).Commitments Made in Ltr,Submitted (← links)
- 05000245/LER-1996-056, Forwards LER 96-056-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 961212,per 10CFR50.73(a)(2)(i). Commitments Made within Ltr,Submitted (← links)
- 05000336/LER-1996-039, Forwards LER 96-039-00 Which Documents Event That Occurred at Mnps,Unit 2 on 961106.Commitment Made within Ltr,Listed (← links)
- 05000336/LER-1996-037, Provides List of Commitments Re LER 96-037 (← links)
- 05000336/LER-1996-038, Forwards LER 96-038.Commitments Made Re LER Submitted (← links)
- 05000245/LER-1996-062, Submits List of Commitments Made Re LER 96-062-00.Util Commits to Perform Engineering Calculations to Quantify Consequences of Failure of 1-AC-10 During Fuel Handling Accident (← links)
- 05000245/LER-1996-060, Forwards LER 96-060-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 960408.Commitment Listed (← links)
- 05000245/LER-1996-061, Submits List of Commitments to LER 96-061-00.Util Will Document Containment Isolation Design Requirements for RWCU Sys Auxiliary Pump Operation Mode (← links)
- 05000423/LER-1996-007, Forwards LER 96-007-02 Which Supplements Rept Submitted on 960502,per 10CFR50.73(a)(2)(ii)(B),10CFR50.73(a)(2)(v)(B&D), 10CFR50.73(a)(2)(vii)(B&D).Commitments in Response to Event, Encl (← links)
- 05000245/LER-1996-026, Forwards LER 96-026-01,documenting Event Which Occurred on 960321.Commitments Listed (← links)
- 05000245/LER-1996-051, Forwards Suppl LER 96-051-01.Commitments Listed,Including Implementation of Mods to Restore Each Identified Piping Sys to Design Basis (← links)
- 05000245/LER-1996-031, Forwards LER 96-031-01.Util Commits That All DC Circuits within Fuse Control Program Will Have Fuses W/Properly Certified DC Rating Prior to Startup for Operating Cycle 16 (← links)
- 05000245/LER-1996-059, Forwards LER 96-059-00.Util Commits That Design Basis of Reactor Feed Pump High Level Trip Circuitry Will Be Reevaluated to Verify Proper Applicability of Physical Separation,Redundancy & Single Failure Requirements (← links)
- 05000245/LER-1996-057, Submits Commitments Made Re LER 96-057.Breakers Which Are Racked Down Will Be Secured within Cubicle to Prevent Movement Using Existing Hardware Associated W/Elevator Mechanism by 961230 (← links)
- 05000423/LER-1996-046, Fowards LER 96-046-00.Licensee Commitments Listed,Including Containment Fuel Drop Radiation Monitor Design Reviewed & TS Change Request Will Be Submitted to NRC for Approval (← links)
- 05000336/LER-1996-035, Forwards LER 96-035-00,documenting Occurrence on 961009. Commitments Listed (← links)
- 05000423/LER-1996-035, Forwards LER 96-035-00.MOV Calculations Will Be Revised Based on Bounding Application Factor/Pullout Efficiency or MOV Specific Performance Characteristics Prior to start-up from Current Outage (← links)