Pages that link to "Harry Salmon"
Jump to navigation
Jump to search
The following pages link to Harry Salmon:
Displayed 50 items.
- ML20126A589 (← links)
- Michael Colomb (← links)
- Salmon H (redirect page) (← links)
- Ralph Beedle (← links)
- Radford Converse (← links)
- Rodger Locy (← links)
- John Brons (← links)
- Corbin McNeil (← links)
- J. P. Bayne (← links)
- Raymond Pasternak (← links)
- Asa George (← links)
- Robert Graham (← links)
- ML20154B820 (← links)
- ML20149H413 (← links)
- IR 05000333/1997201 (← links)
- ML20198D562 (← links)
- ML20196K508 (← links)
- ML20248L853 (← links)
- ML20217J617 (← links)
- JPN-97-027, Responds to RAI Re Proposed Ts,Revising Allowed out-of-svc Times for Single Inoperable EDGs to Accommodate on-line Maint of Edgs.Revised TS Pp 217,224 & 258f,describing Licensee'S Configuration Risk Mgt Program,Encl (← links)
- JAFP-92-0458, Monthly Operating Rept for May 1992 for Ja FitzPatrick Nuclear Power Plant (← links)
- JAFP-92-0612, Ja Fitzpatrick Nuclear Power Plant Effluent & Waste Disposal Semi-Annual Rept,For Jan-June 1992, Including as Addendum to Jan-June 1992 Rept,Tables 3A & 3B of Jul-Dec 1991 Rept (← links)
- JPN-97-006, Withdraws Request for NRC Approval of Changes Described in Ltr Re Feedwater Nozzle Insp Program (← links)
- JAFP-93-0081, Monthly Operating Rept for Jan 1993 for Ja Fitzpatrick Nuclear Power Plant (← links)
- JAFP-93-0031, Special Rept 93-002:on 921228,fire Barrier,Installed in Front of Fire Door 76FDR-A-272-5,determined to Be Nonfunctional Based on Unsealed Opening in Barrier.Fire Watch Posted & Maint Work Request Initiated (← links)
- JAFP-93-0026, Ja Fitzpatrick Nuclear Power Plant 10CFR20.407 Rept for CY92 (← links)
- JAFP-93-0011, Updated Special Rept Documenting Inability to Restore Fire Door to Functional Status within Required Time Frame.On 921201,door Determined to Be Nonfunctional & Not Restored Until 921211.As of 930104,two Doors Remain Nonfunctional (← links)
- JAFP-93-0006, Special rept:post-work Testing & Repair of a Feedwater Return Valve 34NRV-111A Could Not Be Completed within 7-day Period.Continuous Fire Watch & Roving Fire Watch Posted & One Floor Plug Removed on 921219 & Replaced on 921221 (← links)
- JAFP-93-0007, Monthly Operating Rept for Dec 1992 for Ja FitzPatrick Nuclear Power Plant (← links)
- JAFP-92-0854, Special Rept:On 921209,fire Barrier Doors Remain Nonfunctional Based Upon Revised Surveillance Test Acceptance Criteria.Revised Surveillance Test Criteria & Improved Maint Work Procedures Implemented (← links)
- JAFP-92-0855, Responds to NRC Re Violations Noted in Insp Rept 50-333/92-82.Corrective Actions:Installed Scaffolding Inspected,Discrepancies Identified & Training Provided to Individuals Responsible for Evaluating Scaffolding (← links)
- JAFP-92-0848, Monthly Operating Rept for Nov 1992 for James a Fitzpatrick Nuclear Power Plant (← links)
- ML22249A278 (← links)
- JAFP-92-0782, Special Rept:On 921002,insp of Fire Doors,Using Revised Surveillance Test Procedure Initiated & Fire Barrier Doors Not Restored to Operable Status within 7 Days.As of 921109, 77 Doors Remained Nonfunctional.Fire Watch Posted (← links)
- JAFP-92-0790, Monthly Operating Rept for Oct 1992 for Ja FitzPatrick Nuclear Power Plant (← links)
- JAFP-92-0704, Forwards Rev 15 to Security Plan.Rev Withheld (Ref 10CFR73.21 & 2.790(d)(1)) (← links)
- JAFP-92-0705, Monthly Operating Rept for Sept 1992 for Fitzpatrick Nuclear Power Plant (← links)
- JAFP-92-0570, Special Rept:On 920703,CO-2 Fire Door Required to Close on CO-2 Sys Activation Did Not Fully Close When Released.Fire Door Repaired & Tested Satisfactorily (← links)
- JPN-96-024, Forwards Application for Amend to License & Ts,Eliminating Selected Response Time Testing Requirements (← links)
- JPN-96-026, Forwards Application for Amend to License DPR-59,revising ATWS Recirculation Pump Trip Reactor Pressure for High Setpoint,Either Zero or Safety Relief Valves Out of Svc (← links)
- JPN-96-030, Forwards Supplemental Info Re Core Shroud Repair ISI & XM-19 Matl Testing Programs (← links)
- JPN-96-025, Forwards Application for Amend to License & Ts,Revising Minimum Critical Power Ratio Safety Limit & Associated Basis (← links)
- JAFP-92-0678, Forwards Revised Table 3-4, Estimated Monthly Impingement Rate (Based on Average Daily Rate) to 1991 Annual Biological Monitoring Rept. Annual Total Impingement for Each Species Incorrectly Reported Due to Calculation Error (← links)
- JAFP-92-0652, Monthly Operating Rept for Aug 1992 for Ja Fitzpatrick Nuclear Power Plant (← links)
- JAFP-92-0551, Forwards Response to SALP Rept 50-333/91-99.Improvements Planned for Emergency Preparedness Program,Including Use of Simulator,Upgraded Emergency Action Levels,Addl Training & Changes to Joint News Ctr (← links)
- JAFP-92-0527, Responds to NRC Re Violations Noted in Insp Rept 50-333/92-81 on 920413-0501.Corrective Actions:Chiller Condenser Svs Water/Esw Pressure Boundary Has Been Reclassified as Safety Related & MCM-6A Will Be Revised (← links)
- JAFP-92-0532, Monthly Operating Rept for June 1992 for FitzPatrick Nuclear Power Plant (← links)
- JAFP-92-0522, Final SPDES Annual Biological Monitoring Rept Ja FitzPatrick Nuclear Power Plant 1991 (← links)
- JAFP-92-0470, Ja Fitzpatrick Nuclear Power Plant Annual Summary of Changes,Tests & Experiments for 1990 (← links)
- JAFP-92-0436, Forwards Plant Evaluation of Results of NRC Observed Licensed Operator Requalificaton Exams Conducted During Wks of 920510 & 17.Concludes That Program Meets All Criteria Specified in NUREG-1021,ES-601 for Satisfactory Program (← links)