Pages that link to "ML20151Q858"
Jump to navigation
Jump to search
The following pages link to ML20151Q858:
Displayed 50 items.
- ML20040E787 (← links)
- ML20040E118 (← links)
- ML20039G467 (← links)
- ML20039D476 (← links)
- ML20039D467 (← links)
- ML20039C134 (← links)
- ML20039A242 (← links)
- ML17297B605 (← links)
- ML20074A464 (← links)
- ML20106D277 (← links)
- ML20072U221 (← links)
- ML20072C355 (← links)
- ML20135A103 (← links)
- ML20148H345 (← links)
- ML20148D324 (← links)
- ML20141K523 (← links)
- ML20134D199 (← links)
- ML20154K021 (← links)
- ML20154K003 (← links)
- ML20153B141 (← links)
- ML20153B128 (← links)
- ML20151R028 (← links)
- ML20151N344 (← links)
- ML20150E726 (← links)
- ML20150D102 (← links)
- ML20149M617 (← links)
- ML20195D225 (← links)
- ML20195B901 (← links)
- ML20205N485 (← links)
- ML20205F471 (← links)
- ML20246A226 (← links)
- ML20236A726 (← links)
- LD-87-052, Requests That Steam Generator Tube Vibration Issue Be Closed on C-E Std SAR - FSAR (CESSAR-F) Docket.Any Potential Design Improvements for Future Steam Generators Can Be Reviewed as Part of Review of Improved Design Sys 80+ (← links)
- LD-87-053, Forwards Revised Steam Generator Tube Rupture Analysis for Fsar.Rev Incorporates Revised Analysis Using Reactor Coolant Gas Vent Sys for Depressurization Purposes (← links)
- LD-87-036, Forwards Draft ...Licensing Basis Agreement, for Review & Comment.Draft Includes Description of C-E Sys 80 Design Certification Effort & Relation to EPRI Advanced LWR Design Requirements & DOE Design Verification Program (← links)
- LD-87-021, Provides Formal Description of C-E Efforts to Advance Sys 80R PWR Design & Advises That Sys 80 Design Including Consideration of EPRI Advanced LWR Design Requirements Document Revised (← links)
- LD-87-012, Forwards Generic Design Info in Response to 10CFR50.62, Requirements for Reduction of Risk from ATWS Events for Light Water-Cooled Nuclear Power Plants. Requirements Will Be Met When Existing Supplementary Protection Sys Modified (← links)
- LD-87-017, Responds to 870327 Questions Re Steam Generator Tube Vibration Observed at Palo Verde Units 1 & 2.Definition & Scope of Program to Review Phenomenon Will Be Available for Review W/Nrc in Approx 90 Days (← links)
- LD-88-128, Forwards QA Program in Response to NRC Request for Addl Info Re Chapter 17,CESSAR-DC QA (← links)
- LD-88-042, Provides Proposed Resolutions to Remaining Two Issues Committed to in Re Direct Containment Heating (Idcor Issue 8) & Debris Coolability (Idcor Issue 10).C-E Plans to Adopt 14 Resolutions Previously Submitted (← links)
- LD-88-038, Provides Proposed Resolutions for Four of Six Issues Which Make Up Topic Paper Set 2,including in-vessel Hydrogen Generation,Core Melt Progression & Vessel Failure & Hydrogen Ignition & Burning.Remaining Issues Submitted in 30 Days (← links)
- LD-88-039, Forwards Addl Info Re Chapters 1 & 10 to CESSAR-DC,per NRC 880311 Request (← links)
- LD-88-033, Forwards Response to NRC 880226 Request for Addl Info on Chapter 17 to Rev 4 to Topical Rept CENPD-210A, QA Program, Including Revs to C-E 871130 & 880411 Responses (← links)
- LD-88-034, Provides Addl Info on CESSAR-DC Chapter 10 Re Secondary Water Chemistry,Per NRC 880225 request.CESSAR-DC Section 10.3.5.1 Revised to Make Clear That C-E Secondary Water Chemistry Program Includes Immediate Shutdown Limits (← links)
- LD-88-091, Forwards Summary of Sabotage Protection Considerations & Draft Requirements for Sabotage Design from EPRI Advanced LWR Requirements Document,Per NRC .Basis for Program Listed (← links)
- LD-88-089, Forwards Addl Info Re CESSAR-DC,Chapter 4,in Response to NRC 880628 Request (← links)
- LD-86-015, Informs of Incorporation of 850311 Responses,Committing to Perform post-test Analysis of Semiscale Test S-UT-8 & Providing Results of post-test Analysis,To Close TMI Items II.K.3.30 & II.K.3.31 (← links)
- LD-88-066, Forwards DOE Advanced Reactor Severe Accident Program Proposed Resolutions for Severe Accident Issues,Topic Set 3. Resolutions to Listed Items Will Be Adopted in Development of Sys 80+ Std Design (← links)
- LD-88-046, Forwards Response to NRC 880315 Request for Addl Info Re CESSAR-DC,Chapter 10, Plant Sys Branch (← links)
- LD-88-019, Forwards Addl Info Re Chemical & Vol Control Sys for Sys 80+TM Std Design,Per 871217 Request.Proposed Rev to C-E Std SAR, Design Certification Also Encl (← links)