ML20236A726

From kanterella
Jump to navigation Jump to search
Responds to Re Creation of New Docket for CESSAR-DC.Creation of New Docket Will Facilitate Recordkeeping & Minimize Confusion for Vendor & NRC
ML20236A726
Person / Time
Site: 05000470
Issue date: 10/13/1987
From: Rubenstein L
Office of Nuclear Reactor Regulation
To: Scherer A
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
References
NUDOCS 8710230061
Download: ML20236A726 (2)


Text

_ - - _ _ _ _

.. o %

October 13, 1987 i

l Docket No. STN 50-470,

(

Mr. A. E. Scherer, Director

~ Nuclear Licensing Combustion Engineering 100 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500

Dear Mr. Scherer:

l This is in response to your letter number LD-87-050 of September 18, 1987, concerning~the creation of a new docket for CESSAR-DC. A new docket for CESSAR-DC can be creat'ed with what ever documents are disclosed in Docket '

No. STN 50-470. When the new docket is created, we would request the Office of.

Secretary to implement your request. This should not prejudice the outcome of the on-going discussions of Combustion Engineering's position that the Design Certification review should be based on the FDA-2 findings and conducted in accordance with the Backfit Rule. We agree with you that creating a new docket for CESSAR-DC will facilitate recordkeeping and minimize confusion for both you and the staff.

Sincerely, original signed by Lester S. Rubenstein, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTION:

,,7 i Centrab. File t

~NRC PDR PDSNP Reading GVissing EHylton 87i0230061 871013 LRubenstein PDR ADOCK 05000470 TDorian A

PDR EJordan JPartlow ACRS(10)

X t ( O. O PDSNh-PDS.(

OGC-B @ [ PD3NPb k Eh! %on G

ing:cw TMri F LRuben tein 09/p/87

'f/87

/87 QW//3 /87

s.,, : w

>A REQlig -

~ UNITED STATES bi g

NUCLEAR REGULATORY COMMISSION o

j; g-WASHINGTON. D, C. 20555 '

5 j

{*....;/

13, 1987

~0ctober l

Docket No. STN 50-470 l

l

. Mr. A; E. Scherer, Director Nuclear Licensing _

Combustion Engineering.

100 Prospect Hill Road-Post Office Box 500 Windsor, Connecticut 06095-0500

Dear Mr.'Scherer:

i This is in-response'to your letter number LD-87-050 of September 18, 1987, concerning the creation of a new docket for CESSAR-DC. A new docket for CESSAR-DC can be created w'ith-what ever documents are disclosed in Docket-

~

No. STN 50-470. When the' new docket is created, we would request the Office of L Secretary to implement your request. This should not prejudice the outcome of-the on-going discussions of Combustion Engineering's position that the Design 9

I Certification review should be based on the FDA-2 findings and conducted in accordance with the Backfit Rule. We agree-with you that creating a new docket for CESSAR-DC will facilitate recordkeeping and minimize confusion for both

.b' i

}

you and the staff.

Sincerely,

.(

f y':.

%b/

Lester S.'gL L(.waU.h.c W benstein, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor' Regulation cc: See next page

[

-