ML20134D199

From kanterella
Jump to navigation Jump to search
Forwards Final Draft of CESSAR Sys 80 NSSS STS for Review. Certification Under Oath or Affirmation Requested by 850822, If in Agreement W/Final Draft.W/O Encl
ML20134D199
Person / Time
Site: 05000470
Issue date: 08/14/1985
From: Thomas C
Office of Nuclear Reactor Regulation
To: Scherer A
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
References
NUDOCS 8508190141
Download: ML20134D199 (2)


Text

l .

Docket No: STN-50-470 August b e5 Mr. A. E. Scherer, Director l Nuclear Licensing

! Combustion Engineering, Inc.

1000 Prospect Hill Road Hindsor, Connecticut 06095

Dear Mr. Scherer:

SUBJECT:

CESSAR SYSTEM 80 NSSS STANDARD TECHNICAL SPECIFICATIONS l

j Enclosed please find the final draft of CESSAR Systen 80 NSSS Standard Technical Specifications for your review. This final draft includes the following note:

These enclosed Standard Technical Specifications (STS) are only the Nuclear Steam Supply (NSSS) portion of the STS for CESSAR System 80 FSAR up to Amendment Number 10. These Technical Specifications are labelled: CESSAR 80-NSSS-STS. The Balance of Plant (80P) portion of

, the STS have only a reference to either "(80P)" or "See Applicant's i SAR." The POP Technical Specifications will be developed using the guidance contained in the Combustion Engineering Standard Technical Specifications (CE-STS). CESSAR 80 NSSS-STS contained herein will be revised to reflect applicable changes in regulatory requirerents at the tine that they are approved for use in the licensing process.

If you agree with this final draft, please send us by August 22, 1985 your

! certification, under oath or affimation, that these Technical Specifications and associated bases adequately envelop the design basis events and are ,

consistent with CESSAR up to and including Amendment 10, the staff's SER including Supplements 1 and 2, and the design documents for a System 80 plant.

Sincerely, l l aiho reperting cnd/or recordkcoping i requirements contained in this letter i af f ect f orer thm ten roependents : '

! therefore, Cc3 cicarance la not required Cecil 0. Thomas, Chief  !

( under P.L.96-511. " Standardization and Special Projects Branch Division of Licensing l

Enclosure:

Distribution CESSAR System 80 Docket File NSSS T'echnical Specifications PDR 1 (Final Draft) P. Moriette i P. Anderson SSP 8 Reading

B DL:SSPB b D S PB -

PA r on' PMoriette:jb HB ow o s

/ 5 j/g4/85 / 6 f/$5 l

8508190141 850814 PDR A

ADOCK 05000470 PDR

Conbustion Engineering, Inc. Docket No. STN 50-470 (CESSAR) er .ia aaelosure: ,

Mr. G. Davis, Manager ,

Standard Plant Licensing 1000 Prospect Hill Road Windsor, Connecticut 06095

" . ". B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.

7910 Woodmont Avenue Bethesda, Maryland 20014 Mr. E. E. Van Brunt, Jr.

Vice President - Construction Projects Arizona Public Service Company P. O. Box 21666 Phoenix, Arizona 85036 Ms. Patricia Lee Hourihan 6413 S. 26th Street Dhnoniv. Arizona 85040 Mr. Daniel F. Giessing Division of Nuclear Regulation rad Safety Office of Converter Reactor

.. Deployment, NE-12 Office of Nuclear Energy Washington, D.C. 20545 Mr. Douglas Coleman 1.icensing Project Manager Washington Public Power Supply System P. O. Box 1223 Elma, Washington 98541