Finds Recipient Has Not Addressed All Matters Required for CESSAR Sys 80 Preliminary Design Analysis Extension.When Info Is received,PDA-2 Will Be Extended for 2 Addl Years
ML20150D102
Person / Time
Site: 05000470
Issue date: 11/22/1978
From: Heltemes C
Office of Nuclear Reactor Regulation
To: Scherer A
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
References
NUDOCS 7812040203
Download: ML20150D102 (3)


Text

~ ~

, s x.i i

e w

Distribution:

Docket File SB Chron SB Reading NOV P 21978 WPGammill Docket No. STN 50-470 H Gearin I Villalva NRC PDA Mr. A. E. Scherer, Licensing l tanager Combustion Engineering, Inc.

i 1000 Prospect Hill Road Windsor, Connecticut 06095

Dear Mr. Scherer:

SUBJECT:

EXTENSION OF PDA-2 FOR THE CESSAR SYSTDt 80 DESIGN

References:

1) NRC Letter, R. S. Doyd to P. L. McGill, dated October 19, 1978.

i 2)

C-E letter (LD-78-073), A. E. Scherer to C. J.

Heltemes, Jr., dated October 20, 1978.

3)

C-E letter (LD-78-031), A. E. Scherer to R. S.

Boyd, dated November 8,1978.

Reference 1 identifies the RRRC Category I, II and III matters, and the HRR Category IV matters that must be addressed by C-E in order to extend the CESSAR System 80 PDA (PDA-2) for two additional years.

Reference 1

'also describes the review process that will be undertaken by the NRC prior to extanding PDA-2.

C-E transmitted the CESSAP. System 80 FSAR for docketing considerations and an Appendix A to the FSAR as enclosures to Reference 2.

Appendix A addresses most of the Category I, II and III matters that are applicable to the System 80 design. Although the Category IV matters are not addressed, Reference 2 includes a commitment to address the applicable Category IV matters on or about December 1,1978. Thus, C-E has not yet addressed all the matters required for a PDA extension.

In Reference 3, C-E requests that PDA-2 be extended to December 31,1980.

flowever, since C-E has not yet submitted all the required information, we cannot extend PDA-2 at this time.

(Note: Dr. Joe Goldberg of your staff is aware of the information that must yet be provided.) After we have receiYed all the required information, and upon making a finding that said information is acceptable for PDA extension purposes, we will extend POA-2 for two additional years.

OP PICE &

,y Ret.tet b l

l

.m - m

.- m.o

  • ....._.g.

~

,,y,

+,

Mr. A. E. Scherer.

1 The subject of fees for PDA extensions is still being discussed with i

the Cocuission. As soon as a decision is reached, we will promptly i

noti fy you.

If you have any questions on the ratters discussed in this letter, please 2

i feel free to contact ra or I. Villaiva, the staff's assigned Licensing Project itanager for the CESSAR Systea 80 design.

j 1

i Sincerely, l

Original Cisned by:

l C. J. Halte=os, yr, C. J. Helte:nes, Jr., Chief

)

j Standardization Branch i

Division of Project Management l

I.

I i

4;

}

4 t

1 i

J 1

1 1

4 i-l l

i i

+

2 o,,,27,*740.DPM:SB OPM,:Sk i

c

.. lyi11 al.y.iuf)

.g _

l eua-*-e +

..-.llL.RS J.1 8

oan*-

v.

4.

NRC FORM 318 (9 76) NRCM 0240 fr v. n. novsaamswt PaiwTime orricas t en -eas.eu 1

4

,,. ~.

~

i._,,.._,..

,,.__..,,-,,m.

.,p,,g_m

,.,,,.,y..,,,my, 7.

.