Pages that link to "PNP 2021-016, 2020 Radiological Environmental Operating Report"
Jump to navigation
Jump to search
The following pages link to PNP 2021-016, 2020 Radiological Environmental Operating Report:
Displayed 50 items.
- PNP 2018-052, Supplement to License Amendment Request -Application to Revise Technical Specifications to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- Risk Informed Technical Specification Task Force. (← links)
- PNP 2018-044, Special Report of Inoperability of Main Steam Line Gross Gamma Activity Monitor (← links)
- PNP 2018-041, Focused Evaluation Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- PNP 2018-036, Revised Mitigating Strategies Assessment for Flooding Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- PNP 2018-005, Revision of Commitment to Maintain Severe Accident Management Guidelines (← links)
- PNP 2018-034, Transmittal of Cyber Security Plan, Revision 2 (← links)
- PNP 2018-030, Voluntary Response to NRC Regulatory Issue Summary 2018-02: Preparation and Scheduling of Operator Licensing Examinations (← links)
- PNP 2018-027, 2017 Radiological Environmental Operating Report (← links)
- PNP 2018-026, Submittal of 2017 Personnel Exposure and Monitoring Report (← links)
- PNP 2018-023, Response to Second Request for Additional Information - Alternative to the Reexamination Frequency for a Relevant Condition Foreign Material Lodged in the Reactor Pressure Vessel (← links)
- PNP 2018-021, Submittal of 2017 Annual Non-Radiological Environmental Operating Report (← links)
- PNP 2018-024, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application (← links)
- PNP 2018-018, Response to Request for Additional Information - Proposed Changes to the Emergency Plan to Reflect a Permanently Shut Down and Defueled Reactor Vessel (← links)
- PNP 2018-022, Annual Report of Changes in Emergency Core Cooling System Models (← links)
- PNP 2018-017, Milestone Schedule for Generic Safety Issue - 191 Resolution (← links)
- PNP 2018-014, Response to Request for Additional Information - Alternative to the Reexamination Frequency for a Relevant Condition Foreign Material Lodged in the Reactor Pressure Vessel (← links)
- PNP 2018-015, Submittal of Revision 30 to Emergency Plan (← links)
- PNP 2018-004, Supplement to License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications (← links)
- PNP 2018-001, Supplement to Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06,. (← links)
- PNP 2017-075, Response to Request for Additional Information - Proposed Changes to Administrative Controls Section of the Technical Specifications for Permanently Defueled Condition (← links)
- PNP 2017-050, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile Protection (← links)
- PNP 2017-070, NRC Confirmatory Order, EA-15-039 (← links)
- PNP 2017-069, NRC Confirmatory Order EA-15-039 (← links)
- PNP 2017-068, Proposed Alternative - Relief Request Number RR 5-6, Alternative to the Reexamination Frequency for a Relevant Condition - Foreign Material in Reactor Vessel (← links)
- PNP 2017-066, License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications (← links)
- PNP 2017-065, Supplement to Certification of Permanent Cessation of Power Operations (← links)
- PNP 2017-062, Submittal of 2017 Refueling Outage, 1R25, 180-Day Steam Generator Tube Inspection Report (← links)
- PNP 2017-059, License Amendment Request Supplement - Cyber Security Plan Implementation Schedule (← links)
- PNP 2017-060, Report of Changes, Tests and Experiments and Summary of Commitment Changes (← links)
- PNP 2017-058, Certification of Permanent Cessation of Power Operations (← links)
- PNP 2017-049, Registration of NUHOMS-32PT and NUHOMS-24PTH Casks Due to Revised Certificates of Compliance (← links)
- PNP 2017-035, License Amendment Request - Administrative Controls for a Permanently Defueled Condition (← links)
- PNP 2017-033, Transmittal of Request for Exemption from Specific Provisions in 10 CFR 73.55 (← links)
- PNP 2017-023, Annual Report of Changes in Emergency Core Cooling System Models (← links)
- PNP 2017-038, NRC Confirmatory Order EA-15-039 (← links)
- PNP 2017-029, Transmittal of 2016 Radiological Environmental Operating Report (← links)
- PNP 2017-032, Core Operating Limits Report - Fuel Cycle 26 (← links)
- PNP 2017-017, Notification in Response to Confirmatory Order, EA-15-039 (← links)
- PNP 2017-009, Transmittal of 2016 Annual Radioactive Effluent Release and Waste Disposal Report (← links)
- PNP 2017-027, Submittal of 2016 Annual Non-Radiological Environmental Operating Report (← links)
- PNP 2017-030, Submittal of the 2016 Personnel Exposure and Monitoring Report (← links)
- PNP 2017-018, Notification of Change to Regulatory Commitment Re NRC Request for Information Per 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- PNP 2017-020, Response to Request for Additional Information - Relief Request Number RR 4-25 Impracticality - Limited Coverage Examinations During the Fourth 10-year Inservice Inspection Interval (← links)
- PNP 2017-007, License Amendment Request, Cyber Security Plan Implementation Schedule (← links)
- PNP 2017-010, Program Approval - Certified Fuel Handler Training and Retraining Program (← links)
- PNP 2017-003, Notification of Changes to Regulatory Commitments Concerning NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force.. (← links)
- PNP 2017-001, Certification of Permanent Cessation of Power Operations (← links)
- PNP 2016-066, Special Report for Inoperability of High Range Noble Gas Monitor (← links)
- PNP 2016-061, Proposed Alternatives-Relief Requests Numbers RR 5-4, Weld Reference System, and RR 5-5, Under-Vessel Leakage Examination, Pertaining to In-Service Inspection Related Activities for the Fifth 10-Year Interval (← links)
- PNP 2016-063, Mitigating Strategies Assessment for Flooding Submittal (← links)