.=::. Entergy PNP 2017-038 May 24,2017 Mr. Patrick Louden Region III Director, Division of Reactor Projects U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352
SUBJECT:
NRC Confirmatory Order EA-15-039 Palisades Nuclear Plant Dockets 50-255 License No. DPR-20 Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 2697642000 Jeffery A. Hardy Regulatory Assurance Manager
REFERENCE:
Letter from Nuclear Regulatory Commission to Entergy Nuclear Operations, Inc., "Confirmatory Order Related to NRC Report No.
05000255/2015013; and Investigation Report 3-2012-021; Palisades Nuclear Plant," dated May 16, 2016.
Dear Mr. Louden:
Section V, item 3, of the subject Confirmatory Order states: "Within 360 days of the effective date of the Confirmatory Order, Entergy will review Procedure EN-OP-104, "Operability Determination Process," and Procedure EN-U-102, "Corrective Action Process," in light of the lessons learned from events associated with leakage of the SIRWT and revise these procedures as appropriate. In particular, the review will evaluate the adequacy of those procedures to address indeterminate and/or changing conditions. Upon completion of the procedure reviews and applicable revisions, Entergy will notify in writing the Director, Division of Reactor Projects, NRC Region III, and make the procedures available to the NRC for inspection."
This letter is to inform you that actions taken to satisfy the requirements of section V, item 3, of the Confirmatory Order are completed. All related documentation is available for inspection.
This letter contains no new commitments and no revisions to existing commitments.
Sincerely, JAH/tad cc: Document Control Desk, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC