PNP 2018-005, Revision of Commitment to Maintain Severe Accident Management Guidelines

From kanterella
Jump to navigation Jump to search
Revision of Commitment to Maintain Severe Accident Management Guidelines
ML18233A092
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/20/2018
From: Arnone C
Entergy Nuclear Operations, Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PNP 2018-005
Download: ML18233A092 (3)


Text

,.

~ Entergy Entergy Operations, Inc.

Entergy Nuclear Operations, Inc.

27780 Blue Star Highway Covert, MI49043 Tel 269 7642000 Charles F. Arnone Site Vice President PNP 2018-005 August 20,2018 u.s. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Revision of Commitment to Maintain Severe Accident Management Guidelines Palisades Nuclear Plant Docket 05000255 DPR-20

Reference:

1. Entergy Nuclear Operations, Inc. letter to Nuclear Regulatory Commission, "Commitment to Maintain Severe Accident Management Guidelines," dated December 9,2015 (PNP 2015-094)

Dear Sir or Madam:

Entergy Nuclear Operations, Inc. (END) submitted the above referenced letter to the Nuclear Regulatory Commission on December 9, 2015. This letter established two commitments related to maintaining Severe Accident Management Guidelines (SAMGs).

The first commitment has been completed. The due date for the second commitment is being extended. END announced the decision on December 8, 2016, to permanently shut down the Palisades Nuclear Plant (PNP) in October 2018. The SAMG project at PNP was discontinued at that time. On September 28,2017, END announced that PNP would continue operation until the spring of 2022. Due to these events, the SAMG project is now approximately one year behind the original schedule. Therefore, it is necessary to extend the commitment due date by one year.

The revised SAMG commitment is listed in Attachment 1.

Document Control Desk PNP 2018-005 Page 2 Should you have any questions concerning the content of this letter, please contact Jeffery Hardy, at 269-764-2011.

CFAlbed : List of Regulatory Commitments Palisades Nuclear Plant CC Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC

Attachment 1 List of Regulatory Commitments Palisades Nuclear Plant The following table identifies those actions committed to by Palisades Nuclear Plant in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

TYPE (Check one) SCHEDULED ONE-TIME CONTINUING COMPLETION COMMITMENT ACTION COMPLIANCE DATE ENO will update the site Severe Accident X 3/29/2020 Management Guidelines (SAMGs) to future revisions of the Pressurized Water Reactor Owner's Group (PWROG) generic severe accident technical guidelines, and the SAMGs will be integrated with other emergency response guideline sets and symptom-based Emergency Operating Procedures, and validated, using the guidance in NEI14-01, Emergency Response Procedures and Guidelines for Beyond Design Basis Events and Severe Accidents.

Page 1 of 1