NRC Confirmatory Order, EA-15-039
ML17341A039
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/07/2017
From: Hardy J
Entergy Nuclear Operations
To: Louden P
Document Control Desk, Office of Nuclear Reactor Regulation, NRC/RGN-III
References
EA-15-039, PNP 2017-070
Download: ML17341A039 (1)


Text

~Entergy Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Tel 269 764 2000 Jeffery A. Hardy Regulatory Assurance Manager PNP 2017-070 December 07,2017 Mr. Patrick Louden U. S. Nuclear Regulatory Commission Division of Reactor Projects, Region III 2443 Warrenville Road Lisle, IL 60532

Subject:

NRC Confirmatory Order, EA-15-039 Palisades Nuclear Plant Docket 50-255 License No. DPR-20

Reference:

Letter from Nuclear Regulatory Commission to Entergy Nuclear Operations, Inc.,

"Confirmatory Order Related to NRC Report No. 05000255/2015013; and Investigation Report 3-2012-021; Palisades Nuclear Plant," dated May 16, 2016.

Dear Mr. Louden:

In accordance with the subject Confirmatory Order, Entergy Nuclear Operations, Inc. (ENO) developed a case study addressing lessons learned from the event. The case study was provided in training sessions to site personnel identified in the order. The Oversight Subcommittee of ENO's Safety Review Committee (SRC) developed a report that detailed the effectiveness of the training. The report was provided to ENO's Chief Nuclear Officer.

Pursuant to Section V, Item 1c, of the Confirmatory Order, this letter provides notification that the SRC's Oversight Subcommittee report is available for NRC inspection.

This letter contains no new commitments and no revisions to existing commitments.

JAH/tad cc: Document Control Desk, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC