Text
..
~Entergy PNP 2017-069 December 05, 2017 Mr. Patrick Louden Region III Director, Division of Reactor Projects U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352
SUBJECT:
NRC Confirmatory Order EA-15-039 Palisades Nuclear Plant Dockets 50-255 License No. DPR-20 Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert. MI 49043 2697642000 Charles F. Arnone Site Vice President
REFERENCE:
Letter from Nuclear Regulatory Commission to Entergy Nuclear Operations, Inc., "Confirmatory Order Related to NRC Report No.
05000255/2015013; and Investigation Report 3-2012-021; Palisades Nuclear Plant," dated May 16, 2016.
Dear Mr. Louden:
In accordance with the subject Confirmatory Order, Entergy Nuclear Operations, Inc. (ENO) shared the lessons learned from the event in presentations to reactor licensees identified in the order. Specifically, ENO presented the lessons learned at a Regional Utility Group meeting in each of the NRC Regions that ENO operates, the 2017 Nuclear Energy Institute Licensing Forum and to ENO personnel via a fleet-wide news article.
Pursuant to Section V, item 2d, of the Confirmatory Order, this letter provides affirmation that the presentations described in items 2a and 2b of the order were conducted.
This letter contains no new commitments and no revisions to existing commitments.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on December 05,2017.
CFNtad cc: Document Control Desk, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC