PNP 2017-065, Supplement to Certification of Permanent Cessation of Power Operations

From kanterella
Jump to navigation Jump to search

Supplement to Certification of Permanent Cessation of Power Operations
ML17292A032
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/19/2017
From: Arnone C
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PNP 2017-065
Download: ML17292A032 (2)


Text

Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530 Tel 269 764 2000 Charles F. Arnone Site Vice President PNP 2017-065 October 19, 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Supplement to Certification of Permanent Cessation of Power Operations Palisades Nuclear Plant Docket No. 50-255 Renewed Facility Operating License No. DPR-20

REFERENCE:

1. Entergy Nuclear Operations, Inc. letter to NRC, PNP 2017-058, Certification of Permanent Cessation of Power Operations, dated September 28, 2017 (ADAMS Accession Number ML17271A233)

Dear Sir or Madam:

In Reference 1, pursuant to 10 CFR 50.82(a)(1 )(i) and 10 CFR 50.4(b)(8), Entergy Nuclear Operations, Inc. (ENO) certified to the U.S. Nuclear Regulatory Commission (NRC) that it had decided to permanently cease power operations at the Palisades Nuclear Plant (PNP) in the spring of 2022.

In this supplement to Reference 1, ENO further clarifies the date of permanent cessation of power operations at PNP by certifying that, pursuant to 10 CFR 50.82(a)(1 )(i) and 10 CFR 50.4(b)(8), it plans to permanently cease power operations at the PNP no later than May 31, 2022. A more specific date for permanent power cessation cannot be provided at this time due to fuel cycle duration variables.

Should you have any questions regarding this submittal, please contact Mr. Otto Gustafson at (269) 764-2049.

This letter contains no new or revised regulatory commitments.

I declare under penalty of perjury that the foregoing is true and correct. Executed on October 19, 2017.

PNP 2017-065 Page 2 of 2 Sincerely, CFA/jse cc: Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC