Pages that link to "ML20212N991"
Jump to navigation
Jump to search
The following pages link to ML20212N991:
Displayed 33 items.
- ML20236U533 (← links)
- ML20236U018 (← links)
- ML20236T974 (← links)
- PNO-I-87-106, NRC Dispatched Augmented Insp Team to Facility to Commence Insp on 871115.Insp Will Focus on Sequence of Events & Licensees Response Re 871112 Loss of Offsite Power. Team Expected Onsite 871115-20 (← links)
- PNO-I-87-104, on 871107 & 08,util Identified Potential Breach of Security Vital Area Barrier & Series of Radiological Problems.Ongoing Maint & Mod Work Onsite Suspended.Licensee Presently Evaluating Situation (← links)
- PNO-I-87-069, corrects & Updates Info Contained in 870728 PNO-I-87-068 Re 870727 Apparent Contamination of Worker W/ Radium.Licensee Subsequently Determined That Worker Contaminated w/Pm-147.Clean-up Will Be Performed by Worker (← links)
- ML20236F419 (← links)
- PNO-I-87-068, on 870727,contractor Worker Found to Be Radioactively Contaminated W/Radium.Caused by Worker Attempt to Remove Radium from Watch Dial.Licensee Decontaminated Worker & Furnished Other Health Physics Assistance (← links)
- ML20236E926 (← links)
- IA-88-287, Final Response to FOIA Request for Documents.Forwards App J & Releasable Portions of App K Documents.Subj Documents Also Available in Pdr.App L & Portions of App K Documents Withheld (Ref FOIA Exemption 5) (← links)
- ML20236E010 (← links)
- PNO-I-87-095, on 871015,State of Ma Atty General Jm Shannon Filed Petition Requesting Order to Show Cause Why Plant Should Not Remain Closed Until Full Adjudicatory Hearing Resolves Issues Re GE Mark I Containment & Evacuation Plans (← links)
- PNO-I-89-016, on 890303,JM Allan Approved NRC Restart Assessment Panel Recommendation to Release Licensee from Second Approval Point in Power Ascension Test Program. Testing Activities for Next Phase Stated (← links)
- ML20235X246 (← links)
- ML20235N336 (← links)
- PNO-I-89-010, on 890221,startup Transformer Tripped & Locked Out on Ground Differential Relay Actuation.Licensee Investigating Cause.Decay Heat Minimal & Reactor Water Temp Decreased About 1 F in First 3 H After Loss of Power (← links)
- PNO-I-87-090, on 870926-27,util Scheduled to Start Reloading Fuel Into Core of Plant.Plant Shutdown Since Apr 1986 for Maint & Program Improvements.Licensee Required to Obtain NRC Approval Before Restart of Reactor (← links)
- PNO-I-87-105B, on 871112,offsite Power Reestablished to Vital & Nonvital Buses Via Backfeeding Through Main & Auxiliary Transformers After Loss of Power.Loss of Power Possibly Caused by Icing in Switchyard.Switchyard Sprayed (← links)
- PNO-I-87-105A, as of 871112,offsite Power Remained Unavailable to Site.Personnel Shutdown Emergency Diesel Generator B Due to Problem W/Transformer C,Resulting in Another Shutdown Cooling Isolation.Switchyards Sprayed (← links)
- PNO-I-87-105, on 871112,plant Experienced Complete Loss of Offsite Power.Cause Associated W/Switchyard Icing Due to Adverse Weather Conditions.Licensee Continuing to Determine Cause of Loss of Offsite Power.Ice & Salt Being Removed (← links)
- PNO-I-87-104A, on 871108,normally Locked High Radiation Barrier Leading to Refueling Floor Was Found W/Locking Mechanism Taped Over.Info Serves as Update to PNO-I-87-104, Discussing Licensee Decision to Stop Work at Plant (← links)
- ML20244C460 (← links)
- ML20236B150 (← links)
- ML20235R464 (← links)
- ML20210S754 (← links)
- PNO-I-99-026A, on 990518,main Transformer Was Damaged During Testing of Replacement Bushing While Unit Was in Refueling Outage.Current Refueling Outage Was Originally Scheduled to Be Completed on 990607,with Return to Full Power Operation (← links)
- PNO-I-99-026, on 990518,fire Occurred at Pilgrim Station in Main Electrical Transformer.Licensee Requested off-site Firefighting Assistance.Resident Inspector Responded to Site Upon Notification of Event.Licensee Issued Press Release (← links)
- ML20206C041 (← links)
- PNO-I-86-038A, on 860515,operations,maint & Clerical Workers Went on Strike When Contract Expired.Mgt Personnel W/Senior Reactor Licenses Manning Control Room Watches on 12-h Shifts.Work Activities Canceled for Several Days (← links)
- PNO-I-85-037A, on 850523,reactor Shutdown Initiated Due to Lubricating Oil Circulation Pump Motor Tripping on Diesel Generator B.Generator Declared Inoperable.Shutdown Will Be Terminated After Oil Circulation Pump Motor Replaced (← links)
- PNO-I-85-037, on 850516,reactor Shut Down After One of Two Diesel Generators & One of Four LPCI Pumps Found Inoperable. Cause Not Stated.Diesel Generator B Returned to Svc & LPCI Pipe Supports Repaired (← links)
- PNO-I-93-066A, demonstration to Protest Inadequacy of Plant Emergency Plan Ended About 2:00 Pm.Three Stink Bombs Introduced Into Media Center Ventilation Sys,But Did Not Interrupt Activities.No Other Untoward Occurrences Reported (← links)
- PNO-I-93-066, on 931207,licensee Security Representative in Technical Support Ctr Notified NRC Region I That Actual Demonstration Taking Place in Downtown Plymonth.No Other Interference W/Exercise Activities Identified (← links)