Pages that link to "ML20205A153"
Jump to navigation
Jump to search
The following pages link to ML20205A153:
Displayed 36 items.
- ML20248D464 (← links)
- ML20247E915 (← links)
- ML20236M893 (← links)
- ML20236M731 (← links)
- ML20236H224 (← links)
- ML20235R313 (← links)
- ML20235K365 (← links)
- ML20234D090 (← links)
- ML20217D480 (← links)
- ML20216E025 (← links)
- ML20214T842 (← links)
- ML20211P393 (← links)
- ML20211J099 (← links)
- ML20210F604 (← links)
- ML20210D688 (← links)
- ML20210D277 (← links)
- ML20210D237 (← links)
- ML20210D144 (← links)
- ML20210C557 (← links)
- ML20210B083 (← links)
- ML20210A523 (← links)
- ML20209H868 (← links)
- ML20209H472 (← links)
- ML20209G106 (← links)
- L-88-050, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-348/88-26 & 50-364/88-26.Corrective Actions:Valve Closed, Sys Valve Alignment Check Performed,Lube Oil Strainer Inspected & Cleaned & Pump Restored to Operable Status (← links)
- L-99-025, Forwards Rev 2 to Jfnp Security plan,FNP-0-M-99,IAW 10CFR50.4(b)(4).Attachment 1 Contains Summary of Changes & Amended Security Plan Pages.Encl Withheld from Public Disclosure Per 10CFR73.21 (← links)
- L-99-022, Submits Rev to Unit 2 SG Tube voltage-based Repair Criteria Data Rept.Ltr Contains No Commitments (← links)
- ML20210G490 (← links)
- L-99-000, Confirms That FNP Has Satisfied Certain License Conditions as Listed (← links)
- L-99-010, Forwards ISI Refueling 15,Interval 2,Period 3,Outage 3 for Jfnp,Unit 1, & Vols 1 & 2 to ISI Refueling 15,Interval 3, Period 1,Outage 1 for Jfnp,Unit 1. Summary of Results May Be Found in Tab B of Encl 2 (← links)
- L-99-016, Forwards Response to NRC RAI Concerning LAR 111 That Was Proposed to Allow Use of SG Tube Sleeves Designed by ABB-CE.Revised Response to Item 3 from Original RAI Dtd 970623,is Included in Encl (← links)
- L-99-021, Forwards Proprietary & non-proprietary Responses to NRC RAIs Re W TR WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs. W Proprietary Notice,Affidavit & Copyright Notice,Encl.Proprietary Info Withheld (← links)
- L-99-020, Forwards Response to NRC RAI Re GL 96-05 for Farley Nuclear Plant.Farley Is Committing to Implement Phase 3 of JOG Program (← links)
- 05000348/LER-1978-062, Forwards LER 78-062/01T-0 (← links)
- 05000348/LER-1978-061, Forwards LER 78-061/03L-0 (← links)
- 05000348/LER-1985-005-01, Forwards Results of Testing/Insp of 11 Tendon Anchor Heads, Based on Commitment in 850812 LER 85-005-01 to Conduct Addl Tests & Insps on Tendon Anchor Heads Which Failed Due to Hydrogen Stress Cracking.Anchor Heads Acceptabl (← links)