JAN 2 61987
Docket Nos. 50-348, 50-364
Alabama Power Company
ATTN: Mr. R. P. Mcdonald
Senior Vice President
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT NOS. 50-348/86-25 AND 50-364/86-25)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
H. L. Whitener on November 7 - 14, 1986, on site and December 1 - 5, 1986, in
the Region II Office.
The inspection included a review of activities authorized
for your Farley facility. At the conclusion of the inspection, the findings were
discussed with those members of your staff identified in the enclosed inspection
report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activitics
in progress.
<
The inspection findings indicate that certain activities appeared to violate NRC
requirements.
The violation, references to pertinent requirements, and elements
to be included in your response are described in the enclosed Notice of
Violation.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely.
Original Signed by
Luis A. Reyes
Luis A. Reyes, Acting Director
Division of Reactor Projects
Enclosures:
(See page 2)
t
8702060489 B70126
ADOCK 05000348
G
JEo/ 4
g
.
.
.
. ..
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
-
.
,
.
Alabama Power Company
2
Enclosures:
1.
2.
NRC Inspection Report
cc w/encls:
W. O. Whitt, Executive Vice President
J. D. Woodard, General Manager -
Nuclear Plant
W. G. Hairston, III, General Manager -
Nuclear Support
J. W. McGowan, Manager-Safety Audit
and Engineering Review
J. K. Osterholtz, Supervisor-Safety
Audit and Engineering Reviaw
bcc w/encis:
Document Control Desk
State of Alabama
NRC Resident Inspector
E. Reeves, Project Manager, NRR