ML20210A523

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-348/86-25 & 50-364/86-25 on 861107-14 & 1201-05 & Notice of Violation
ML20210A523
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/26/1987
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20210A526 List:
References
TAC-65399, NUDOCS 8702060489
Download: ML20210A523 (2)


See also: IR 05000348/1986025

Text

ah

,*

,

.

JAN 2 61987

Docket Nos. 50-348, 50-364

License Nos. NPF-2 and NPF-8

Alabama Power Company

ATTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-348/86-25 AND 50-364/86-25)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

H. L. Whitener on November 7 - 14, 1986, on site and December 1 - 5, 1986, in

the Region II Office.

The inspection included a review of activities authorized

for your Farley facility. At the conclusion of the inspection, the findings were

discussed with those members of your staff identified in the enclosed inspection

report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activitics

in progress.

<

The inspection findings indicate that certain activities appeared to violate NRC

requirements.

The violation, references to pertinent requirements, and elements

to be included in your response are described in the enclosed Notice of

Violation.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely.

Original Signed by

Luis A. Reyes

Luis A. Reyes, Acting Director

Division of Reactor Projects

Enclosures:

(See page 2)

t

8702060489 B70126

PDR

ADOCK 05000348

G

PDR

JEo/ 4

g

.

.

.

. ..

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

-

.

,

.

Alabama Power Company

2

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

cc w/encls:

W. O. Whitt, Executive Vice President

J. D. Woodard, General Manager -

Nuclear Plant

W. G. Hairston, III, General Manager -

Nuclear Support

J. W. McGowan, Manager-Safety Audit

and Engineering Review

J. K. Osterholtz, Supervisor-Safety

Audit and Engineering Reviaw

bcc w/encis:

Document Control Desk

State of Alabama

NRC Resident Inspector

E. Reeves, Project Manager, NRR

R

RII

RI

RI

RII

RII

VPkpiera

HDance

DVerrelli

HWhitener:er

FJap6

AHerdt

01/g87

01/d/87

0/lD/87

01/ p /87

01/t(/87

01//5787

/

, , , , , , ,

,

.

)